Business Model#
What the company does and how it earns its money; written AI-editorially, exclusively from the company's original reports, without any assessment of our own.
FuelCell Energy designs, manufactures, installs, and operates carbonate fuel cell power plants that generate electricity and heat through an electrochemical process using natural gas, biogas, or other hydrogen-bearing fuels. The company's revenues flow from three channels: product sales covering delivery of fuel cell modules and systems to third-party customers including utilities and industrial buyers in the United States, South Korea, and other international markets; generation revenues from ownership and operation of power plants under long-term power purchase agreements; and long-term service agreements covering maintenance and operation of installed customer systems. FuelCell is also developing adjacent technologies, including an industrial-scale carbon capture system co-developed with ExxonMobil that uses carbonate fuel cell chemistry to capture CO2 from industrial exhaust streams, and a solid oxide electrolysis platform for hydrogen production. The company's growth strategy is anchored on converting a large contracted and awarded backlog into delivered product revenue while scaling its Torrington, Connecticut manufacturing facility toward a 500 MW annualized production rate by June 2028.
Current Status#
Summary of the most recent reporting period: core figures, drivers and management statements; written editorially from the current original report, every figure backed by a source number.
Price & Chart#
Interactive price chart (TradingView) and the trend of key figures from the core tables. The price chart loads only after a click; at that point a connection to TradingView is established.
Daily candles with news and earnings markers. Loads only on click.
Share-Price Drivers#
Factors the company itself names as material for its business development (IR-based); reproduced neutrally, no price forecast and no assessment of our own.
Product revenues reached FY2025 69.1 (+169%, margin 19.9%) and remained the largest reported segment in 2026-Q1 at 12.0, making product delivery the central swing factor for the top line (24, 27)
Product revenues FY2025 69.1 up 169% at 19.9% margin; latest quarterly Product segment 12.0 in 2026-Q1 (24, 27)
Fit Energy 30 MW Phase 0 delivery planned Q4 2026 with Capital Equipment Purchase Agreement, Siemens MOU for balance-of-plant systems, and ExxonMobil carbon capture module deployment (31)
Achievement of 100 MW annualized production rate targeted October 2026 and Torrington facility expansion to 500 MW planned June 2028 (31)
58.8 MW long-term service agreement and repowering completion recorded in Q3 2026 (23, 31)
Advanced Technologies contract revenues FY2025 20.6 up 22% at 26.7% margin; SOEC platform deliveries to Idaho National Laboratory (24, 7)
Service agreements revenues FY2025 20.4 up 105% at 11.0% margin (24)
Sector trend: Demand indicators for stationary fuel-cell power and carbon-capture platforms are broadening across new counterparties (Fit Energy, Siemens, ExxonMobil), while capacity utilisation is scaling toward a 100 MW annualized rate; segment revenue growth is decelerating and reported margins remain modest (31, 24).
Event Timeline#
This timeline collects the material events from the original reports: guidance changes, revenue and margin signals, strategy shifts, product and M&A announcements. Events are grouped by quarter (most recent first); the grey tag before each event names the event type, the date is the publication date of the source. Management quotes open the quarter block as direct quotes. Per quarter we show the three most defining events; more can be expanded per quarter, older years are collapsed. Every event carries its source as a superscript, clickable number.
2026 · 12 events
2026-Q3 · May – Jul 2026
Gross loss widened to $(24.5)M from $(5.1)M in Q3 2025, reflecting approximately $4.0M in inventory write-downs to net realizable value and $13.0M in losses on firm purchase commitments related to Phase 0 of the Fit Energy CEPA (30)
Company targeted positive Adjusted EBITDA in Q4 fiscal 2027, subject to conversion of Awarded Capacity Backlog and continued execution of cost reduction initiatives (31)
Entered $2.6B Capital Equipment Purchase Agreement with Fit Energy USA LP for up to 380 MW of carbonate fuel cell systems across four phases; signed first Capacity Reservation Agreement with a major data center operator for a planned 75 MW project in Texas (30, 31)
Net cash position expanded to 504.5 USDm from 239.0 USDm in 2026-Q2 (+111%, derived from reported financial debt minus cash). 30
2026-Q2 · Feb – Apr 2026
Loss from operations widened to $(77.9)M from $(35.8)M in Q2 2025, driven by a $42.6M non-cash impairment charge on Groton Project equipment following SureSource 4000 performance issues requiring upgrade to standard 2.5 MW power blocks (28, 29)
Revenue declined 5% to $35.6M from $37.4M in Q2 2025; Generation revenues decreased 16% over the six-month period due to lower output from routine and non-routine maintenance and the non-operating Groton Project (28, 29)
Initiated manufacturing capacity expansion at Torrington, CT facility targeting annualized production rate of 100 MW by October 2026 and 500 MW by June 2028, requiring an estimated $200 to $275 million investment over 24 months (28, 29)
Product revenue grew +39.2% to 18.1 USDm in 2026-Q2 (51% of group revenue) while group revenue changed -4.8%. 29
2026-Q1 · Nov 2025 – Jan 2026
Loss from operations improved to $(26.3)M from $(32.9)M, driven by restructuring-related reductions in administrative, selling, and R&D expenses following workforce actions in November 2024 and June 2025 (26)
Revenue increased 61% to $30.5M from $19.0M; product revenues surged from $0.1M to $12.0M driven by GGE Platform and CGN Platform module delivery and commissioning (26, 27)
Announced collaboration with SDCL targeting up to 450 MW of identified projects and delivered over 1.5 GW of new commercial proposals in the data center segment during the quarter (27)
2025 · 16 events
2025-Q4 · Aug – Oct 2025
Q4 revenue +12% to $55.0M; full-year revenue +41% to $158.2M, with product revenues surging 169% to $69.1M from GGE LTSA module deliveries (25)
Full-year gross margin improved to (16.7)% from (32.0)%; Q4 gross loss narrowed to $(6.6)M from $(10.9)M prior year (25)
30% Investment Tax Credit reinstated for fuel cells through at least 2032 under One Big Beautiful Bill Act; Section 45Q incentives increased to $85 per metric ton for carbon capture and utilization (24)
Net cash position expanded to 158.5 USDm from 51.6 USDm in 2025-Q3 (+207%, derived from reported financial debt minus cash). 24
2025-Q3 · May – Jul 2025
$64.5M non-cash impairment of solid oxide technology assets (goodwill, IPR&D, PP&E, inventory) drove operating loss to $95.4M from $33.6M prior year; impairment and restructuring expenses are the primary drivers (22)
Revenue +97% to $46.7M driven by $24.0M from GGE LTSA for eight fuel cell module deliveries in Korea (23)
Unrestricted cash rose to $174.7M; net cash position of $51.6M achieved, reversing net debt of $10.4M at Q2 end, aided by $38.1M in ATM equity proceeds from 6.8M shares during the quarter (22)
2025-Q2 · Feb – Apr 2025
Revenue +67% to $37.4M; product revenues of $13.0M recognized for first time, driven by $12.0M from GGE LTSA module replacements and $1.1M from Ameresco contract (21)
Board approved 22% global workforce reduction (122 employees) and cessation of majority of solid oxide development efforts; refocus on carbonate-based distributed generation for data center and grid resilience applications (20)
Dedicated Power Partners strategic partnership with Diversified Energy Co. and TESIAC Corp. formally launched to accelerate entry into data center power market (21)
2025-Q1 · Nov 2024 – Jan 2025
Total revenue +14% to $19.0M from $16.7M; backlog grew 28% to $1.31B from $1.03B (18)
Gross loss improved to $(5.2)M from $(11.7)M; gross margin (27.4)% vs. (70.2)% prior year (18)
Strategic partnership formed with Diversified Energy Co. and TESIAC to develop integrated fuel cell energy assets for data centers; JDA with Malaysia Marine and Heavy Engineering for large-scale electrolysis systems in Asia, New Zealand, and Australia (18)
2024 · 12 events
2024-Q4 · Aug – Oct 2024
Q4 revenue increased 120% to $49.3M, primarily driven by $18.0M from Gyeonggi Green Energy module sales agreement and $7.7M from Ameresco contract 16
Company disclosed it will not meet previously provided aspirational revenue targets for FY2025 and FY2030 due to slower-than-expected hydrogen adoption and delayed commercialization timelines for SOEC, SOFC, and carbon capture products 16
Global restructuring announced with 17% total workforce reduction (4% in September 2024 plus 13% in November 2024), deferred Calgary capacity expansion, and reallocation of resources toward core molten carbonate distributed power solutions to address grid deficiencies and data center demand 15
2024-Q3 · May – Jul 2024
Loss from operations improved to -$33.6M from -$41.4M in prior year quarter; adjusted EBITDA improved to -$20.1M from -$31.6M, driven by lower selling, administrative, and R&D expenses 14
Total Q3 revenue decreased 7% YoY to $23.7M; Service agreement revenue declined to $1.4M from $9.8M due to absence of module exchanges in the quarter, partially offset by Generation +22% to $13.4M and Advanced Technologies +84% to $8.6M 14
Signed long-term service agreement with Gyeonggi Green Energy for 58.8 MW facility in Korea valued at $159.6 million, adding $126.0M to product backlog; total backlog increased 12.6% to $1.20 billion 13
2024-Q2 · Feb – Apr 2024
Revenue decreased 42% YoY to $22.4M, primarily due to no module exchanges during the service period compared to twelve module exchanges in the prior year; Generation revenue increased 67% to $14.1M driven by Toyota and Derby projects 12
Capex guidance for FY2024 reduced to $45-60M from $60-75M due to deferral of certain Calgary expansion elements; R&D spending guidance reduced to $60-65M from $60-70M 11
Nasdaq delisting notice received May 31, 2024 for non-compliance with minimum bid price requirement of $1.00 per share; company given until November 27, 2024 to regain compliance 11
2024-Q1 · Nov 2023 – Jan 2024
Total revenues decreased 55% to $16.7M from $37.1M, primarily due to no product revenues and lower service agreement revenues reflecting completion of a prior-year multi-year fleet upgrade cycle 9
Gross loss of $11.7M versus gross profit of $5.2M in Q1 2023; margin shifted to -70.2% from +14.1%, driven by unfavorable Generation margins including $3.5M in expensed Toyota Project construction and gas costs and $1.9M derivative loss on natural gas contract 10
Operating generation portfolio reached 62.8 MW from 43.7 MW as Toyota Project, Derby 14.0 MW Project, and Derby 2.8 MW SCEF Project achieved commercial operations 9
2023 · 11 events
2023-Q4 · Aug – Oct 2023
Q4 revenues decreased 43% to $22.5 million from $39.2 million, primarily due to lower product revenues 8
Q4 gross loss improved to $(1.5) million from $(15.2) million in Q4 2022 8
ExxonMobil affiliate Esso Nederland BV announced plans to build a pilot plant in Rotterdam to test carbonate fuel cell technology for industrial carbon capture 8
2023-Q3 · May – Jul 2023
Q3 revenues decreased 41% year-over-year to $25.5 million due to absence of module sales to Korea Fuel Cell Co., Ltd. compared to the prior year period 6
Q3 gross loss widened to $(8.2) million from $(4.2) million in the prior year quarter, primarily due to absence of higher-margin module sales 6
Entered 14-year long-term service agreement with Noeul Green Energy Co., Ltd. in Korea for 20 MW fuel cell park with contract value of approximately $73 million 6
2023-Q2 · Feb – Apr 2023
Q2 revenues increased 134% year-over-year to $38.3 million, primarily driven by service agreements revenue from KOSPO module exchanges in Korea 4
Received order from ExxonMobil affiliate for fuel cell equipment and engineering support for carbon capture demonstration 4
2023-Q1 · Nov 2022 – Jan 2023
Q1 revenues rose 17% to $37.1 million, with service agreements revenues up 541% to $13.9 million driven by new module exchanges in Woodbridge, CT and Korea 1
Gross result turned to profit of $5.2 million from a gross loss of $2.9 million in Q1 2022, reflecting favorable product margins and lower manufacturing variances 2
Key Figures ($m)#
The company's core financial figures in three views, one below the other: fiscal years (as reported; after restatements the table shows the most recent filing version, marked), half-years (6-month basis, H2 = second half on its own) and quarters (3-month basis, not cumulative). Each row is one period, most recent first. Values with a dotted underline are clickable and show the raw value, the exact source location, the scale evidence and the source; derived values additionally show their formula and inputs. All values are extracted automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original.
All figures serve only to support your own investment decision and are not a recommendation; the company's original reports are authoritative.
Fiscal years
| Period | Calendar quarter | Revenue | Op. income | Net income | EPS ($) | EBITDA (adj.) | OCF | Source |
|---|---|---|---|---|---|---|---|---|
| FY2025 | Q4/2024–Q4/2025 | 158.2 | -192.3 | -187.9 | -3.71 | -74.44 | -125.3 | 25 |
| FY2024 | Q4/2023–Q4/2024 | 112.1 | -158.5 | -126 | -3.92 | -101.11 | -152.9 | 16 |
| FY2023 | Q4/2022–Q4/2023 | 123.4 | -136.1 | -107.6 | -3.96 | -102.88 | -140.2 | 7 |
Quarters
| Period | Calendar quarter | Published | Revenue | Op. income | Net income | EPS ($) | EPS adj. ($) | EBITDA (adj.) | FCF | Cash | Net Debt | Source |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-Q3* | Q2–Q3/2026 | 2026-09-02 | 33 | -46.7 | -44.5 | -0.64 | -0.64 | -36.7 | -13.5 | 658.1 | -504.5 | 30 |
| 2026-Q2* | Q1–Q2/2026 | 2026-06-08 | 35.6 | -77.9 | -77.9 | -1.45 | – | -17.1 | -29 | 373.2 | -239 | 28 |
| 2026-Q1* | Q4/2025–Q1/2026 | 2026-03-09 | 30.5 | -26.3 | -22.9 | -0.49 | – | -17 | -34.7 | 311.8 | -173.6 | 26 |
| 2025-Q4* | Q3–Q4/2025 | 2025-12-18 | 55 | -28.3 | -29.9 | -0.59* | – | -17.7 | -23.9 | 278.1 | -158.5 | 24 |
| 2025-Q3* | Q2–Q3/2025 | 2025-09-09 | 46.7 | -95.4 | -91.7 | -1.89 | – | -16.4 | -32.1 | 174.7 | -51.6 | 22 |
| 2025-Q2* | Q1–Q2/2025 | 2025-06-06 | 37.4 | -35.8 | -38 | -0.90 | – | -19.3 | -35.2 | 116.1 | 10.4 | 20 |
| 2025-Q1* | Q4/2024–Q1/2025 | 2025-03-11 | 19 | -32.9 | -28.3 | -0.71 | – | -21.1 | -52.8 | 98.1 | 31.1 | 18 |
| 2024-Q4* | Q3–Q4/2024 | 2024-12-19 | 49.3 | -41 | -41.4 | -1.28* | – | -25.3 | -4.7 | 148.1 | -16.5 | 16 |
| 2024-Q3* | Q2–Q3/2024 | 2024-09-05 | 23.7 | -33.6 | -32.7 | -1.01* | – | -20.1 | -76.8 | 159.3 | -34.4 | 13 |
| 2024-Q2* | Q1–Q2/2024 | 2024-06-10 | 22.4 | -41.4 | -32.1 | -1.19* | – | -26.5 | -50.3 | 158.8 | -30.9 | 11 |
| 2024-Q1* | Q4/2023–Q1/2024 | 2024-03-07 | 16.7 | -42.5 | -19.8 | -0.73* | – | -29.1 | -68.8 | 297.5 | -180 | 9 |
| 2023-Q4* | Q3–Q4/2023 | 2023-12-19 | 22.5 | -36.4 | -30.4 | -1.12* | – | -30.8 | -27.1 | 250 | -130.5 | 7 |
| 2023-Q3* | Q2–Q3/2023 | 2023-09-11 | 25.5 | -41.4 | -24.3 | -0.06 | – | -0.03 | -47 | 303.7 | -198.7 | 5 |
| 2023-Q2* | Q1–Q2/2023 | 2023-06-08 | 38.3 | -35.9 | -34.3 | -0.09 | – | -26 | -44.4 | 246.8 | -166.9 | 3 |
| 2023-Q1* | Q4/2022–Q1/2023 | 2023-03-09 | 37.1 | -22.5 | -18.6 | -0.05 | – | -14.4 | -61.1 | 315.2 | -234 | 1 |
Balance Sheet & Cash Flow ($m)#
Point-in-time balance sheet items (e.g. cash, financial debt) and cash flow items (operating cash flow, investments/capex) per fiscal year, half-year and quarter. Balance sheet values are as of the period end, flow items cover the period. Derived values are marked and are calculated, for example, as: net debt = financial debt − cash; free cash flow = operating cash flow − capex; the click popover shows formula and inputs. All values are extracted automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original.
Fiscal years
| Period | Calendar quarter | Published | Cash | Debt | Net Debt | D&A | OCF | Capex | FCF | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| FY2025 | Q4/2024–Q4/2025 | 2025-12-18 | 278.1 | 119.6 | -158.5 | 40.4 | -125.3 | 18.6 | -143.9 | 24 |
| FY2024 | Q4/2023–Q4/2024 | 2024-12-19 | 148.1 | 131.7 | -16.5 | 36.2 | -152.9 | 47.7 | -200.6 | 16 |
| FY2023 | Q4/2022–Q4/2023 | 2023-12-19 | 250 | 119.5 | -130.5 | 25.4 | -140.2 | 39.4 | -179.6 | 7 |
Quarters
| Period | Calendar quarter | Published | Cash | Debt | Net Debt | D&A | OCF | Capex | FCF | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| 2026-Q3 | Q2–Q3/2026 | 2026-09-02 | 658.1 | 153.6 | -504.5 | 9.4 | -12.2 | 1.3 | -13.5 | 30 |
| 2026-Q2 | Q1–Q2/2026 | 2026-06-08 | 373.2 | 134.2 | -239 | 10.8 | -27.3 | 1.7 | -29 | 28 |
| 2026-Q1 | Q4/2025–Q1/2026 | 2026-03-09 | 311.8 | 138.2 | -173.6 | 10.5 | -33.9 | 0.8 | -34.7 | 26 |
| 2025-Q4 | Q3–Q4/2025 | 2025-12-18 | 278.1 | 119.6 | -158.5 | 9.8 | -22.9 | 1 | -23.9 | 24 |
| 2025-Q3 | Q2–Q3/2025 | 2025-09-09 | 174.7 | 123.1 | -51.6 | 9.7 | -26.8 | 5.2 | -32.1 | 22 |
| 2025-Q2 | Q1–Q2/2025 | 2025-06-06 | 116.1 | 126.5 | 10.4 | 10.9 | -29.9 | 5.3 | -35.2 | 20 |
| 2025-Q1 | Q4/2024–Q1/2025 | 2025-03-11 | 98.1 | 129.2 | 31.1 | 9.9 | -45.7 | 7.1 | -52.8 | 18 |
| 2024-Q4 | Q3–Q4/2024 | 2024-12-19 | 148.1 | 131.7 | -16.5 | 8.8 | 5.8 | 10.5 | -4.7 | 16 |
| 2024-Q3 | Q2–Q3/2024 | 2024-09-05 | 159.3 | 125 | -34.4 | 9.2 | -63.4 | 13.4 | -76.8 | 13 |
| 2024-Q2 | Q1–Q2/2024 | 2024-06-10 | 158.8 | 127.9 | -30.9 | 9.6 | -37.1 | 13.2 | -50.3 | 11 |
| 2024-Q1 | Q4/2023–Q1/2024 | 2024-03-07 | 297.5 | 117.4 | -180 | 8.6 | -58.3 | 10.6 | -68.8 | 9 |
| 2023-Q4 | Q3–Q4/2023 | 2023-12-19 | 250 | 119.5 | -130.5 | 6.7 | -15.8 | 11.3 | -27.1 | 7 |
| 2023-Q3 | Q2–Q3/2023 | 2023-09-11 | 303.7 | 105 | -198.7 | 6.6 | -35.8 | 11.2 | -47 | 5 |
| 2023-Q2 | Q1–Q2/2023 | 2023-06-08 | 246.8 | 79.9 | -166.9 | 6.6 | -35.3 | 9.1 | -44.4 | 3 |
| 2023-Q1 | Q4/2022–Q1/2023 | 2023-03-09 | 315.2 | 81.1 | -234 | 5.4 | -53.4 | 7.8 | -61.1 | 1 |
Revenue by Type (as of 2026-Q3 · USDm · 7/7)#
Revenue split by segment or product type, exactly as the company itself reports it. The basis is stated next to each value (3, 6 or 12 months); segment totals can deviate from group revenue (reconciliation/consolidation items). If the company changes its segment structure, older structures are kept in the expandable part. Rows in grey are no longer reported separately by the company; they show the last available figures and are never extrapolated.
| Segment | Since | Period | Basis | Revenue | Growth | Margin | Source |
|---|---|---|---|---|---|---|---|
| Product | 2022-Q4 | 2026-Q1 | 3M | 12 | – | – | 27 |
| Generation | 2022-Q4 | 2026-Q1 | 3M | 11 | – | – | 27 |
| Advanced Technologies | 2022-Q4 | 2026-Q1 | 3M | 4.3 | – | – | 27 |
| Service | 2022-Q4 | 2026-Q1 | 3M | 3.2 | – | – | 27 |
| Product revenues | FY2023 | FY2025 | 12M | 69.1 | 169% | 19.9% | 24 |
| Advanced Technologies contract revenues | FY2023 | FY2025 | 12M | 20.6 | 22% | 26.7% | 24 |
| Service agreements revenues | FY2023 | FY2025 | 12M | 20.4 | 105% | 11% | 24 |
Products & M&A (42/122 active+recent)#
Product announcements from the reports; market launches, approvals, partnerships; with first mention (date) and source. “Active/current” means: still mentioned in the most recent reports; what the company no longer mentions moves to the expandable part but is never deleted. Rows in grey are discontinued products.
| Product/Line | Since | Status | Source |
|---|---|---|---|
| UConn Project commercial operations expected | 2027-12 | Planned | 30 |
| UConn Project - 1.125 MW molten carbonate fuel cell system | 2027-12 | Launched | 28 |
| UConn 1.125 MW Project | 2027-12 | Launched | 26 |
| Hartford Project - 7.4 MW fuel cell system | 2027-12 | Launched | 28 |
| Hart Project commercial operations expected | 2027-12 | Planned | 30 |
| Groton Project Equipment Upgrade - SureSource 4000 to standard 2.5 MW power blocks | 2027-12 | Launched | 28 |
| Hartford 7.4 MW Project | 2027-09 | Launched | 26 |
| Groton Project equipment upgrade | 2027 | Launched | 30 |
| Phase 0 of CEPA with Fit Energy - 30 MW generating capacity | 2026-12 | Launched | 30 |
| Phase 0 delivery to Fit Energy (30 MW) | 2026-12 | Launched | 31 |
| Hartford Project 7.4 MW carbonate fuel cell system | 2026-12 | Planned | 20 |
| Achievement of 100 MW annualized production rate | 2026-10 | Launched | 31 |
| Solid oxide electrolysis platform demonstration | 2026-09 | Launched | 30 |
| Gyeonggi Green Energy fuel cell park repowering completion | 2026-09 | Launched | 31 |
| Torrington facility expansion to 500 MW (4x) | 2026-06 | Launched | 31 |
| Standardized 12.5 MW FuelCell Energy Block | 2026-06 | Launched | 29 |
| Solid Oxide Electrolysis Platform Demonstration at INL | 2026-03 | Launched | 26 |
| Gyeonggi Green Energy 58.8 MW fuel cell power plant platform commissioning | 2026 | Launched | 22 |
| Generation 2 Technology fuel cell module commercialization | 2026 | Launched | 17 |
| Esso Rotterdam refinery pilot carbon capture project | 2026 | Launched | 24 |
| UConn Project PPA amendment for 1.125 MW system | 2025-12 | Launched | 30 |
| Remaining 16 1.4-MW replacement fuel cell modules for GGE Agreement expected to be commissioned in FY2026 (2x) | 2025-06 | Planned | 21 |
| 7.4 MW fuel cell power plant in Hartford, CT | 2025-06 | Launched | 21 |
| Korea repowering project module replacements | 2025-04 | Launched | 21 |
| Solid oxide electrolysis cell demonstration unit delivered to U.S. Department of Energy Idaho National Laboratory | 2025-03 | Launched | 19 |
| 7.4 MW Hartford, CT fuel cell power plant | 2025-03 | Launched | 19 |
| Hartford Project PPA execution with Eversource and United Illuminating | 2025-01 | Launched | 30 |
| Hartford Project 7.4 MW PPA | 2025-01 | Launched | 18 |
| Eversource/United Illuminating Hartford 7.4 MW fuel cell power plant | 2025-01 | Planned | 22 |
| University of Connecticut four 250 kW solid oxide systems | 2025 | Launched | 13 |
| University of Connecticut 1 MW Solid Oxide Fuel Cell | 2025 | Launched | 11 |
| Trinity College solid oxide fuel cell project | 2025 | Launched | 13 |
| Toyota Motor North America Tri-gen system hydrogen generation project | 2025 | Launched | 24 |
| Solid oxide electrolyzer demonstration at Idaho National Laboratory | 2025 | Launched | 15 |
| Solid oxide electrolysis system demonstration at Idaho National Laboratory | 2025 | Launched | 20 |
| Solid oxide electrolysis pilot program - 150 kg/day system at Idaho National Laboratory | 2025 | Launched | 17 |
| Solid oxide electrolysis field demonstration at Idaho National Laboratory | 2025 | Launched | 24 |
| Malaysia Marine and Heavy Engineering collaboration for low-carbon fuel production facility | 2025 | Launched | 24 |
| Idaho National Laboratory Electrolysis Platform | 2025 | Launched | 13 |
| Calgary manufacturing capacity expansion | 2025 | Launched | 13 |
| Trinity College 250 kW Solid Oxide Fuel Cell | 2024-07 | Launched | 11 |
| ExxonMobil Carbon Capture Demonstration (3x) | 2023-06 | Launched | 31 |
| Trinity College 250 kW Solid Oxide Fuel Cell Power Generation System | 2024-12 | Launched | 9 |
| Carbon capture technology demonstration at Port of Rotterdam | 2024-12 | Launched | 15 |
| Solid oxide fuel cell platform development | 2024-09 | Launched | 14 |
| Rotterdam project supplies via Esso Nederland B.V. | 2024-09 | Launched | 14 |
| Electrolysis platform development | 2024-09 | Launched | 14 |
| Calgary Solid Oxide Manufacturing Expansion | 2024-06 | Launched | 3 |
| University of Connecticut SOFC installation | 2024-03 | Launched | 10 |
| UConn 1 MW solid oxide fuel cell power generation projects modification | 2024-03 | Launched | 22 |
| U.S. Department of State solid oxide electrolysis project in Ukraine | 2024-03 | Launched | 10 |
| Toyota and Derby generation projects | 2024-03 | Launched | 16 |
| Toyota Project commercial operation | 2024-03 | Launched | 18 |
| Toyota Project | 2024-03 | Launched | 13 |
| Toyota Long Beach Project | 2024-03 | Launched | 17 |
| Solid oxide electrolysis platform delivery to Idaho National Laboratory | 2024-03 | Launched | 8 |
| SCEF Derby 2.8 MW Project | 2024-03 | Launched | 17 |
| Groton Project reached design rated output of 7.4 MW | 2024-03 | Launched | 17 |
| Groton Project rated capacity achievement | 2024-03 | Launched | 13 |
| University of Connecticut (UConn) 1 MW SOFC Project (four 250 kW units) | 2024 | Launched | 17 |
| Trinity College solid oxide fuel cell system installation | 2024 | Launched | 7 |
| Trinity College 250 kW SOFC Project | 2024 | Launched | 17 |
| Solid oxide manufacturing capacity expansion to 40 MW in Calgary | 2024 | Launched | 7 |
| Idaho National Laboratory Solid Oxide Electrolysis Platform | 2024 | Launched | 9 |
| Derby, Connecticut projects | 2024 | Launched | 10 |
| Delivery of distributed power platform to Trinity College | 2024 | Stable | 7 |
| Delivery of SOEC electrolysis platform to Idaho National Laboratory | 2024 | Stable | 7 |
| Completion and delivery of other two SOEC production units | 2024 | Stable | 7 |
| Calgary facility solid oxide production capacity expansion | 2024 | Launched | 7 |
| Additional on-site fuel cell demonstration and test unit construction in Torrington | 2024 | Launched | 7 |
| Rotterdam Pilot Plant Project | 2023-12 | Launched | 7 |
| INL electrolysis platform delivery | 2023-12 | Launched | 5 |
| Groton Project Technical Improvement Plan | 2023-12 | Launched | 11 |
| ExxonMobil pilot plant for carbon capture in Rotterdam | 2023-12 | Launched | 8 |
| Derby, Connecticut fuel cell park (14.0 MW) | 2023-12 | Launched | 8 |
| Derby, Connecticut 2.8 MW fuel cell project | 2023-12 | Launched | 8 |
| Derby Projects commercial operation | 2023-12 | Launched | 18 |
| Derby Fuel Cell Projects (14.0 MW and 2.8 MW) | 2023-12 | Launched | 13 |
| Derby Connecticut 2.8 MW Project | 2023-12 | Launched | 6 |
| Derby Connecticut 14.0 MW Project | 2023-12 | Launched | 6 |
| Derby Connecticut 14 MW Project | 2023-12 | Launched | 4 |
| Derby CT 2.8 MW Project | 2023-12 | Launched | 3 |
| Derby CT 14.0 MW Project | 2023-12 | Launched | 17 |
| Derby 2.8 MW SCEF project commissioning | 2023-12 | Launched | 7 |
| Derby 2.8 MW SCEF Fuel Cell Project | 2023-12 | Launched | 9 |
| Derby 14.0 MW project placement in service | 2023-12 | Launched | 7 |
| Derby 14.0 MW Fuel Cell Project | 2023-12 | Launched | 19 |
| Derby 14 MW project with United Illuminating | 2023-12 | Launched | 2 |
| 2.8 MW carbonate power generation project (California municipality) | 2023-12 | Launched | 8 |
| 2.8 MW SCEF Fuel Cell Project | 2023-12 | Launched | 19 |
| 1 MW solid oxide power generation project (Northeast U.S. university) | 2023-12 | Launched | 8 |
| Toyota Project BioMAT program placement | 2023-11 | Launched | 7 |
| Long Beach Tri-gen platform for Toyota | 2023-11 | Launched | 8 |
| Toyota Project Port of Long Beach | 2023-10 | Launched | 3 |
| Technology Demonstration - Carbon Capture Test Completion | 2023-10 | Launched | 7 |
| U.S. solid oxide manufacturing facility expansion | 2023-09 | Launched | 5 |
| Toyota Tri-generation Platform at Port of Long Beach | 2023-07 | Launched | 2 |
| Toyota Project Commissioning | 2023-07 | Launched | 1 |
| Toyota Long Beach Tri-gen Project | 2023-07 | Launched | 6 |
| Noeul Green Energy 14-year Service Agreement | 2023-07 | Stable | 13 |
| United States Solid Oxide Manufacturing Facility | 2023-06 | Launched | 3 |
| Third Amendment to Connecticut Assistance Agreement | 2023-05 | Launched | 3 |
| Third Amended and Restated 2018 Omnibus Incentive Plan | 2023-05 | Launched | 3 |
| Amended and Restated Employee Stock Purchase Plan | 2023-05 | Launched | 3 |
| U.S. Navy Submarine Base Groton Project | 2023-03 | Launched | 2 |
| Trinity College Distributed Power Platform Delivery | 2023-03 | Launched | 5 |
| Derby Project Commercial Operations | 2023-03 | Launched | 1 |
| Trinity College Hartford Solid Oxide Power Platform | 2023 | Launched | 4 |
| Trinity College Hartford Distributed Power Platform Delivery | 2023 | Launched | 3 |
| Pilot program award for 150 kg/day solid oxide electrolysis system at Idaho National Laboratory | 2023 | Launched | 7 |
| Idaho National Laboratory Solid Oxide Electrolysis Unit | 2023 | Launched | 4 |
| Idaho National Laboratory Electrolysis Platform Delivery | 2023 | Launched | 3 |
| Groton Project | 2023 | Launched | 3 |
| Electrolysis platform delivery to Idaho National Laboratory | 2023 | Launched | 2 |
| Distributed power platform delivery to Trinity College Hartford | 2023 | Launched | 2 |
| Calgary capacity expansion - four units construction and delivery | 2023 | Launched | 5 |
| 250 kW Power Generation Platform (2×) | 2023 | Stable | 7 |
| 1 MW High-Efficiency Electrolysis Platform (4×) | 2023 | Stable | 7 |
| Groton Project Commercial Operations | 2022-12 | Launched | 7 |
M&A (45)#
All recorded acquisitions (purchases) and divestitures/exits with date, short description and source; deliberately including smaller transactions that summaries often miss. Purchase prices appear only where the company itself has disclosed them. Rows in grey are cancelled transactions; the cancellation date is shown in the row.
Acquisitions
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| Siemens MOU for electrical balance of plant systems | 2026-09 | Completed | 31 |
| Data Center Capacity Reservation Agreement with major operator | 2026-09 | Announced | 31 |
| Collaboration with Sustainable Development Capital LLP (SDCL) | 2026-03 | Completed | 27 |
| 2026 EXIM Financing (2×) | 2025-11 | Completed | 30 |
| 2025 EXIM Financing with Export-Import Bank (3×) | 2025-11 | Completed | 25 |
| CGN-Yulchon Generation Co., Ltd. long-term service agreement (3×) | 2025-07 | Announced | 25 |
| Joint Development Agreement with Malaysia Marine and Heavy Engineering Sdn Bhd (2×) | 2025-03 | Announced | 18 |
| Diversified Energy Co. PLC and TESIAC data center partnership (3×) | 2025-03 | Completed | 18 |
| Power Purchase Agreement with Eversource and United Illuminating for Hartford Project (7.4 MW, Hartford Connecticut) | 2025-01 | Announced | 24 |
| Power purchase agreement with Eversource and United Illuminating for Hartford Project | 2025 | Announced | 23 |
| Eversource and United Illuminating 20-year power purchase agreement for 7.4 MW Hartford, Connecticut fuel cell plant | 2025 | Announced | 25 |
| At-the-market offering program: 25.6 million shares sold at $7.44 average price ($185.7 million net proceeds) | 2025 | Completed | 24 |
| Gyeonggi Green Energy Co., Ltd. Hwaseong Balan Industrial Complex repowering project | 2024-09 | Completed | 14 |
| Ameresco Sacramento, CA fuel cell and biogas project | 2024-06 | Completed | 14 |
| Ameresco Sacramento Sewer District 2.8 MW project (4×) | 2024-06 | Completed | 22 |
| GGE LTSA Module Deliveries and Commissioning (7×) | 2024-05 | Completed | 20 |
| ExxonMobil Technology and Engineering Company carbon capture joint development (2×) | 2024-04 | Completed | 19 |
| Amended Open Market Sale Agreement with Jefferies and other agents | 2024-04 | Announced | 11 |
| Agreement with Ameresco, Inc. for Sacramento Sewer district energy delivery platform | 2024-04 | Announced | 12 |
| Esso purchase order (2×) | 2024-03 | Completed | 10 |
| EMTEC Rotterdam project | 2024 | Completed | 16 |
| Open Market Share Sale Agreement (2×) | 2023-12 | Announced | 25 |
| Franklin Park tax equity financing for Derby Projects (2×) | 2023-10 | Completed | 8 |
| Groton Back Leverage Senior and Subordinated Loans (3×) | 2023-08 | Completed | 7 |
| EMTEC Joint Development Agreement (8×) | 2023-08 | Announced | 7 |
| Derby Back Leverage Financing (2×) | 2023-08 | Completed | 30 |
| Chart Industries Memorandum of Understanding for Carbon Capture and Hydrogen Solutions | 2023-06 | Completed | 4 |
| OpCo Financing Facility (3×) | 2023-05 | Completed | 30 |
| Interest Rate Swap Agreements (2×) | 2023-05 | Announced | 26 |
| $87 million Non-Recourse Project Financing Facility | 2023-05 | Completed | 4 |
| Planned 400 MW U.S. Solid Oxide Manufacturing Facility | 2023-03 | Completed | 1 |
| Collaboration agreement with Malaysia Marine and Heavy Engineering on large-scale electrolyzer facilities | 2023-03 | Announced | 2 |
| Calgary Facility Phase 1 Completion - 40 MW Annual Solid Oxide Production Capacity | 2023-03 | Completed | 1 |
| Versa Ltd. Calgary Facility Expansion | 2023-02 | Completed | 1 |
| Calgary facility lease expansion and extension (3×) | 2023-02 | Completed | 7 |
| EMTEC License Agreement | 2019-06 | Announced | 7 |
Divestitures / exits
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| Trinity College 250 kW solid oxide fuel cell project termination | 2025-05 | Divested | 20 |
| Trinity College 250 kW solid oxide fuel cell power generation project termination | 2025-05 | Divested | 22 |
| Termination of PPA with Trinity College for 250 kW solid oxide fuel cell project | 2025-05 | Divested | 24 |
| Solid oxide platform development discontinuation; focus shift to electrolysis technology demonstration | 2024-11 | Divested | 24 |
Terminated / withdrawn
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| Fit Energy Capital Equipment Purchase Agreement (2x) | 2026-06 | Terminated | 31 |
| Gyeonggi Green Energy Co., Ltd. - Module Replacement Agreement | 2024-09 | Terminated | 16 |
| Agreement to supply Gyeonggi Green Energy Co., Ltd. with 42 upgraded fuel cell modules and long-term operations and maintenance services | 2024-05 | Terminated | 12 |
| Long-Term Service Agreement with Gyeonggi Green Energy for GGE Hwaseong Baran facility replacement (22 fuel cell modules) | 2024 | Terminated | 24 |
| Gyeonggi Green Energy Long-Term Service Agreement (5x) | 2023 | Terminated | 17 |
Reported KPIs (as disclosed) (717)#
Figures the company discloses itself in addition to the standard financials; order intake, recurring revenue, user or unit counts, adjusted measures. These “story KPIs” usually slip through standard databases; here they are collected as reported, with no calculation of our own. Important: the definition comes from the company itself and can differ from firm to firm; period and source are stated next to every value.
| Date | Period | KPI | Value / change | Source |
|---|---|---|---|---|
| 2026-09-02 | 2026-Q3 | Unrestricted cash and cash equivalents | 658.1 million | 30 |
| 2026-09-02 | 2026-Q3 | Total project assets | 166.6 million | 30 |
| 2026-09-02 | 2026-Q3 | Other income, net (Q3 2026) | 0.7 million | 30 |
| 2026-09-02 | 2026-Q3 | Other income, net (9M 2026) | 1.8 million | 30 |
| 2026-09-02 | 2026-Q3 | Net loss per common share (Q3 2026) | 0.64 | 30 |
| 2026-09-02 | 2026-Q3 | Net loss per common share (Q3 2025) | 3.78 | 30 |
| 2026-09-02 | 2026-Q3 | Net loss per common share (9M 2026) | 2.56 | 30 |
| 2026-09-02 | 2026-Q3 | Net loss per common share (9M 2025) | 7.22 | 30 |
| 2026-09-02 | 2026-Q3 | Net debt outstanding related to project assets | 97.5 million | 30 |
| 2026-09-02 | 2026-Q3 | Interest income (Q3 2026) | 3.6 million | 30 |
| 2026-09-02 | 2026-Q3 | Interest income (9M 2026) | 8.6 million | 30 |
| 2026-09-02 | 2026-Q3 | Interest expense (Q3 2026) | 2.9 million | 30 |
| 2026-09-02 | 2026-Q3 | Interest expense (9M 2026) | 8.5 million | 30 |
| 2026-09-02 | 2026-Q3 | generation portfolio MW | 62.8 MW | 30 |
| 2026-09-02 | 2026-Q3 | committed service agreements backlog | 263.6 million | 30 |
| 2026-09-02 | 2026-Q3 | committed product backlog | 108.9 million | 30 |
| 2026-09-02 | 2026-Q3 | committed generation backlog | 915.7 million | 30 |
| 2026-09-02 | 2026-Q3 | committed advanced technologies contract backlog | 7.8 million | 30 |
| 2026-09-02 | 2026-Q3 | awarded capacity service agreements backlog | 1.3 billion | 30 |
| 2026-09-02 | 2026-Q3 | annualized production rate three months ended July 31 2026 | 37.1 MW | 30 |
| 2026-09-02 | 2026-Q3 | annualized production rate three months ended July 31 2025 | 33.2 MW | 30 |
| 2026-09-02 | 2026-Q3 | annualized production rate nine months ended July 31 2026 | 35.4 MW | 30 |
| 2026-09-02 | 2026-Q3 | annualized production rate nine months ended July 31 2025 | 30.5 MW | 30 |
| 2026-09-02 | 2026-Q3 | unrestricted cash and cash equivalents | 658.1 million | 30 |
| 2026-09-02 | 2026-Q3 | unrestricted cash and cash equivalents | $658.1 million | 31 |
| 2026-09-02 | 2026-Q3 | Torrington facility expansion target | 500 MW | 31 |
| 2026-09-02 | 2026-Q3 | sales pipeline | 10 gigawatts | 31 |
| 2026-09-02 | 2026-Q3 | restricted cash and cash equivalents | 79.2 million | 30 |
| 2026-09-02 | 2026-Q3 | restricted cash and cash equivalents | $79.2 million | 31 |
| 2026-09-02 | 2026-Q3 | pledged cash and cash equivalents for performance security | 79.2 million | 30 |
| 2026-09-02 | 2026-Q3 | outstanding letters of credit | 12.7 million | 30 |
| 2026-09-02 | 2026-Q3 | generation portfolio | 62.8 MW | 30 |
| 2026-09-02 | 2026-Q3 | company-funded R&D expenses incurred (nine months ended July 31, 2026) | 23.2 million | 30 |
| 2026-09-02 | 2026-Q3 | committed backlog | $1.3 billion | 31 |
| 2026-09-02 | 2026-Q3 | committed advanced technologies contract backlog | 7.8 million | 30 |
| 2026-09-02 | 2026-Q3 | Cash, cash equivalents, restricted cash and restricted cash equivalents | $737.3 million | 31 |
| 2026-09-02 | 2026-Q3 | Cash and cash equivalents and restricted cash | 737.3 million | 30 |
| 2026-09-02 | 2026-Q3 | Awarded Capacity Backlog | $2.4 billion | 31 |
| 2026-09-02 | 2026-Q3 | Annualized production rate | 100 MW | 31 |
| 2026-06-08 | 2026-Q2 | US government funded backlog | $4.9 million | 28 |
| 2026-06-08 | 2026-Q2 | Restricted cash | $67.7 million | 28 |
| 2026-06-08 | 2026-Q2 | Non-US government funded backlog | $10.5 million | 28 |
| 2026-06-08 | 2026-Q2 | Letters of credit outstanding | $12.7 million | 28 |
| 2026-06-08 | 2026-Q2 | Generation portfolio | 62.8 MW | 28 |
| 2026-06-08 | 2026-Q2 | Advanced technologies contract backlog | $15.4 million | 28 |
| 2026-06-08 | 2026-Q2 | unrestricted cash and cash equivalents | 373.2 million | 28 |
| 2026-06-08 | 2026-Q2 | Total project assets | 167.5 million | 28 |
| 2026-06-08 | 2026-Q2 | Total backlog | 1.14 billion | 28 |
| 2026-06-08 | 2026-Q2 | Torrington facility current maximum capacity | 100 MW per year | 28 |
| 2026-06-08 | 2026-Q2 | Service agreements backlog | 155.4 million | 28 |
| 2026-06-08 | 2026-Q2 | sales pipeline | 4 gigawatts | 29 |
| 2026-06-08 | 2026-Q2 | restricted cash and cash equivalents | 67.7 million | 28 |
| 2026-06-08 | 2026-Q2 | Projects in development assets | 1.1 million | 28 |
| 2026-06-08 | 2026-Q2 | Projects in development | 8.5 MW | 28 |
| 2026-06-08 | 2026-Q2 | Product backlog | 36.1 million | 28 |
| 2026-06-08 | 2026-Q2 | Pledged cash collateral | 67.7 million | 28 |
| 2026-06-08 | 2026-Q2 | Non-current restricted cash | 51.1 million | 28 |
| 2026-06-08 | 2026-Q2 | Net debt outstanding related to project assets | 99.8 million | 28 |
| 2026-06-08 | 2026-Q2 | Hub and spoke model target capacity | 1.5 to 2.0 GW | 28 |
| 2026-06-08 | 2026-Q2 | Generation portfolio capacity | 62.8 MW | 28 |
| 2026-06-08 | 2026-Q2 | Generation backlog | 928.5 million | 28 |
| 2026-06-08 | 2026-Q2 | Current restricted cash | 16.6 million | 28 |
| 2026-06-08 | 2026-Q2 | Completed, operating installations | 166.4 million | 28 |
| 2026-06-08 | 2026-Q2 | Cash and cash equivalents | approximately $441 million | 29 |
| 2026-06-08 | 2026-Q2 | Backlog | $1.14 billion | 29 |
| 2026-06-08 | 2026-Q2 | Annualized production rate (three months ended April 30, 2026) | 36.4 MW | 28 |
| 2026-06-08 | 2026-Q2 | Annualized production rate (six months ended April 30, 2026) | 34.5 MW | 28 |
| 2026-06-08 | 2026-Q2 | Advanced Technologies contract backlog | 15.4 million | 28 |
| 2026-03-09 | 2026-Q1 | U.S. government funded backlog | $5.1 million | 26 |
| 2026-03-09 | 2026-Q1 | Total project assets | 211,000 (USD in thousands) | 26 |
| 2026-03-09 | 2026-Q1 | Total backlog | 1,171,200 (USD in thousands) | 26 |
| 2026-03-09 | 2026-Q1 | Service agreements backlog | 159,400 (USD in thousands) | 26 |
| 2026-03-09 | 2026-Q1 | Restricted cash pledged | $67.8 million | 26 |
| 2026-03-09 | 2026-Q1 | Restricted cash OpCo obligations | $25.3 million | 26 |
| 2026-03-09 | 2026-Q1 | Restricted cash Groton senior obligations | $12.8 million | 26 |
| 2026-03-09 | 2026-Q1 | Restricted cash Derby obligations | $3.0 million | 26 |
| 2026-03-09 | 2026-Q1 | Restricted cash Crestmark obligations | $2.9 million | 26 |
| 2026-03-09 | 2026-Q1 | Restricted cash and cash equivalents | 67,800 (USD in thousands) | 26 |
| 2026-03-09 | 2026-Q1 | Product backlog | 54,100 (USD in thousands) | 26 |
| 2026-03-09 | 2026-Q1 | Outstanding Letters of Credit | $12.7 million | 26 |
| 2026-03-09 | 2026-Q1 | Operating Power Plants Capacity | 62.8 MW | 26 |
| 2026-03-09 | 2026-Q1 | Non-U.S. Government Funded Backlog | $13.1 million | 26 |
| 2026-03-09 | 2026-Q1 | Net Debt Related to Project Assets | 102,700 (USD in thousands) | 26 |
| 2026-03-09 | 2026-Q1 | Gross Margin Service Agreements | 11.5% | 26 |
| 2026-03-09 | 2026-Q1 | Gross Margin Product | -36.1% | 26 |
| 2026-03-09 | 2026-Q1 | Gross Margin Generation | -28.2% | 26 |
| 2026-03-09 | 2026-Q1 | Gross Margin Advanced Technologies | 28.6% | 26 |
| 2026-03-09 | 2026-Q1 | Generation Operating Portfolio | 62.8 MW | 26 |
| 2026-03-09 | 2026-Q1 | Generation Backlog | 939,500 | 26 |
| 2026-03-09 | 2026-Q1 | Finance Obligation Balance | $18.8 million | 26 |
| 2026-03-09 | 2026-Q1 | Depreciation of Project Assets and Generation Intangible | 8,700 | 26 |
| 2026-03-09 | 2026-Q1 | D&A | 10,500 | 26 |
| 2026-03-09 | 2026-Q1 | Cash and Cash Equivalents Pledged as Collateral | 67,800 (USD in thousands) | 26 |
| 2026-03-09 | 2026-Q1 | Annualized Production Rate | 32.6 MW | 26 |
| 2026-03-09 | 2026-Q1 | Advanced technologies contract backlog | 18,200 (USD in thousands) | 26 |
| 2026-03-09 | 2026-Q1 | Restricted Cash and Cash Equivalents Short-Term | $17,675 | 27 |
| 2026-03-09 | 2026-Q1 | Restricted Cash and Cash Equivalents Long-Term | $50,147 | 27 |
| 2026-03-09 | 2026-Q1 | Cash and Cash Equivalents Unrestricted | $311,778 | 27 |
| 2026-03-09 | 2026-Q1 | Backlog Service | $159,393 | 27 |
| 2026-03-09 | 2026-Q1 | Backlog Product | $54,113 | 27 |
| 2026-03-09 | 2026-Q1 | Backlog Generation | $939,525 | 27 |
| 2026-03-09 | 2026-Q1 | Backlog Advanced Technologies | $18,210 | 27 |
| 2026-03-09 | 2026-Q1 | Backlog | $1,171,241 | 27 |
| 2025-12-18 | FY2025 | Versa US Patents | 19 | 24 |
| 2025-12-18 | FY2025 | Versa Pending US Applications | 13 | 24 |
| 2025-12-18 | FY2025 | Versa Pending International Applications | 24 | 24 |
| 2025-12-18 | FY2025 | Versa International Patents | 63 | 24 |
| 2025-12-18 | FY2025 | US Patents | 152 | 24 |
| 2025-12-18 | FY2025 | Unrestricted Cash and Equivalents | 278.1 (USD millions) | 24 |
| 2025-12-18 | FY2025 | Total backlog | 1.19 (USD billions) | 24 |
| 2025-12-18 | FY2025 | Torrington Facility Maximum Capacity | 100 MW | 24 |
| 2025-12-18 | FY2025 | Torrington Facility Estimated Capacity with Investments | 350 MW | 24 |
| 2025-12-18 | FY2025 | Torrington Facility Annualized Production Rate | 41 MW | 24 |
| 2025-12-18 | FY2025 | System Target Design Life | 25-30 years | 24 |
| 2025-12-18 | FY2025 | South Korea Clean Hydrogen Portfolio Standard Hydrogen Share 2036 | 7.1% | 24 |
| 2025-12-18 | FY2025 | South Korea Clean Hydrogen Portfolio Standard Hydrogen Share 2030 | 2.1% | 24 |
| 2025-12-18 | FY2025 | Solid Oxide Electrolysis System Efficiency | 40-45 kWh/kg | 24 |
| 2025-12-18 | FY2025 | Solid Oxide Electrolysis Stack Efficiency | 34 kWh/kg | 24 |
| 2025-12-18 | FY2025 | Service agreements backlog | 162.4 (USD millions) | 24 |
| 2025-12-18 | FY2025 | Section 45Q Carbon Capture Credit | $85 | 24 |
| 2025-12-18 | FY2025 | Safety Experience Modification Rate 2025 | 0.84 | 24 |
| 2025-12-18 | FY2025 | Safety Experience Modification Rate 2024 | 0.83 | 24 |
| 2025-12-18 | FY2025 | Safety Experience Modification Rate 2023 | 0.89 | 24 |
| 2025-12-18 | FY2025 | safety experience modification rate 2022 | 0.088 | 24 |
| 2025-12-18 | FY2025 | safety experience modification rate 2021 | 0.68 | 24 |
| 2025-12-18 | FY2025 | safety experience modification rate 2020 | 0.59 | 24 |
| 2025-12-18 | FY2025 | safety experience modification rate 2019 | 0.65 | 24 |
| 2025-12-18 | FY2025 | Product backlog | 66.2 (USD millions) | 24 |
| 2025-12-18 | FY2025 | power plant recyclable percentage | 93% | 24 |
| 2025-12-18 | FY2025 | power density | 33 MW | 24 |
| 2025-12-18 | FY2025 | pending US patent applications | 29 | 24 |
| 2025-12-18 | FY2025 | pending international patent applications | 79 | 24 |
| 2025-12-18 | FY2025 | net debt from project assets | 106.1 (USD millions) | 24 |
| 2025-12-18 | FY2025 | manufacturing facility size Torrington | 167,000 | 24 |
| 2025-12-18 | FY2025 | loss accruals service agreements | 8.4 million | 24 |
| 2025-12-18 | FY2025 | joint development agreement expected annual budget | $10.0 million | 24 |
| 2025-12-18 | FY2025 | ITA throughput at least | $10.0 million | 24 |
| 2025-12-18 | FY2025 | investment tax credit rate | 30% | 24 |
| 2025-12-18 | FY2025 | international patents | 319 | 24 |
| 2025-12-18 | FY2025 | hydrogen purity | 99.85% | 24 |
| 2025-12-18 | FY2025 | government funding percentage FY2025 | 2% | 24 |
| 2025-12-18 | FY2025 | government funding percentage FY2024 | 4% | 24 |
| 2025-12-18 | FY2025 | government funding percentage FY2023 | 3% | 24 |
| 2025-12-18 | FY2025 | Generation Operating Portfolio | 62.8 | 24 |
| 2025-12-18 | FY2025 | Generation Backlog | 945.2 | 24 |
| 2025-12-18 | FY2025 | FuelCell Energy Solutions licensed US patents | 2 | 24 |
| 2025-12-18 | FY2025 | FuelCell Energy Solutions licensed international patents | 7 | 24 |
| 2025-12-18 | FY2025 | fuel cell modules target design life | 5-7 years | 24 |
| 2025-12-18 | FY2025 | European facility capacity | 20 MW | 24 |
| 2025-12-18 | FY2025 | Esso purchase order value | $11.6 million | 24 |
| 2025-12-18 | FY2025 | Emtec license agreement payment | $10 million | 24 |
| 2025-12-18 | FY2025 | data center electricity demand projection 2030 | 945 terawatt-hours | 24 |
| 2025-12-18 | FY2025 | CHP system efficiency | 80% | 24 |
| 2025-12-18 | FY2025 | carbonate fuel cell electrical efficiency | 50% | 24 |
| 2025-12-18 | FY2025 | carbonate fuel cell average efficiency | 47% | 24 |
| 2025-12-18 | FY2025 | carbon capture NOx reduction | 70% | 24 |
| 2025-12-18 | FY2025 | annualized production rate MW | 31.5 | 24 |
| 2025-12-18 | FY2025 | Advanced technologies contract backlog | 19.5 (USD millions) | 24 |
| 2025-12-18 | FY2025 | unrestricted cash and cash equivalents | $278.1 million | 25 |
| 2025-12-18 | FY2025 | Total cash, restricted cash and short-term investments | $341.8 million | 25 |
| 2025-12-18 | FY2025 | Backlog | $1.19 billion | 25 |
| 2025-12-18 | FY2025 | 3TG minerals percentage FY2024 | 0.001207% | 24 |
| 2025-09-09 | 2025-Q3 | sale leaseback finance obligations outstanding balance | 18.8 million | 22 |
| 2025-09-09 | 2025-Q3 | sale leaseback finance obligations imputed interest | 11.6 million | 22 |
| 2025-09-09 | 2025-Q3 | Restricted cash pledged | 62.2 million | 22 |
| 2025-09-09 | 2025-Q3 | restricted cash OpCo Financing | 20.9 million | 22 |
| 2025-09-09 | 2025-Q3 | restricted cash Groton Senior Back Leverage | 14.0 million | 22 |
| 2025-09-09 | 2025-Q3 | restricted cash Derby Back Leverage | 1.8 million | 22 |
| 2025-09-09 | 2025-Q3 | restricted cash Crestmark sale leaseback | 2.9 million | 22 |
| 2025-09-09 | 2025-Q3 | natural gas gains three months ended July 31 2025 | 1.0 million | 22 |
| 2025-09-09 | 2025-Q3 | natural gas gains nine months ended July 31 2025 | 2.0 million | 22 |
| 2025-09-09 | 2025-Q3 | Letters of credit outstanding | 14.2 million | 22 |
| 2025-09-09 | 2025-Q3 | letters of credit expire through | October 2029 | 22 |
| 2025-09-09 | 2025-Q3 | interest rate swap fixed rate | 3.716% | 22 |
| 2025-09-09 | 2025-Q3 | Generation Operating Portfolio | 62.8 MW | 22 |
| 2025-09-09 | 2025-Q3 | fuel price sensitivity renewable natural gas | 2.0 million | 22 |
| 2025-09-09 | 2025-Q3 | fuel price sensitivity natural gas | 26,000 | 22 |
| 2025-09-09 | 2025-Q3 | Total project assets | 224.5 (USD million) | 22 |
| 2025-09-09 | 2025-Q3 | Total backlog | 1.24 (USD billion) | 22 |
| 2025-09-09 | 2025-Q3 | Total Cash, Restricted Cash and Short-Term Investments | $236.9 million | 23 |
| 2025-09-09 | 2025-Q3 | Service agreements backlog | 169.4 (USD million) | 22 |
| 2025-09-09 | 2025-Q3 | Service Agreements Backlog | $169.4 million | 23 |
| 2025-09-09 | 2025-Q3 | restricted cash and cash equivalents | 62.2 (USD million) | 22 |
| 2025-09-09 | 2025-Q3 | Restricted Cash and Cash Equivalents - Short-term | 16,092 (USD in thousands) | 23 |
| 2025-09-09 | 2025-Q3 | Restricted Cash and Cash Equivalents - Long-term | 46,100 (USD in thousands) | 23 |
| 2025-09-09 | 2025-Q3 | Projects in development | 7.4 | 22 |
| 2025-09-09 | 2025-Q3 | Product backlog | 96.2 (USD million) | 22 |
| 2025-09-09 | 2025-Q3 | Product Backlog | $96.2 million | 23 |
| 2025-09-09 | 2025-Q3 | Pledged cash and cash equivalents (performance security) | 62.2 (USD million) | 22 |
| 2025-09-09 | 2025-Q3 | Outstanding finance obligations under sale-leaseback | 18.8 | 22 |
| 2025-09-09 | 2025-Q3 | Operating portfolio capacity (MW) | 62.8 | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing swap fixed rate | 3.716% | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing net interest rate thereafter | 6.866% | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing net interest rate first four years | 6.366% | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing letter of credit issued | 6.5 million | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing hedge notional minimum | 75% | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing hedge notional maximum | 105% | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing fair value adjustment three months ended July 31 2025 | 0.6 million | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing fair value adjustment nine months ended July 31 2025 | -0.2 million | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing debt service reserve minimum | six months | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing capital expenditures reserve total | 29.0 million | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing capital expenditures reserve funded at closing | 14.5 million | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing Term Loan maturity | May 19, 2030 | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing Term Loan drawn | 80.5 million | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing Term Loan Facility amount | 80.5 million | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing LC Facility amount | 6.5 million | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing DSCR requirement | 1.20:1.00 | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing Applicable Margin SOFR thereafter | 3% | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing Applicable Margin SOFR first four years | 2.5% | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing Applicable Margin Base Rate thereafter | 2% | 22 |
| 2025-09-09 | 2025-Q3 | OpCo Financing Applicable Margin Base Rate first four years | 1.5% | 22 |
| 2025-09-09 | 2025-Q3 | Net debt outstanding related to project assets | 109.0 (USD million) | 22 |
| 2025-09-09 | 2025-Q3 | Groton Total DSCR requirement | 1.10:1.00 | 22 |
| 2025-09-09 | 2025-Q3 | Groton Subordinated Back Leverage maturity | September 30, 2038 | 22 |
| 2025-09-09 | 2025-Q3 | Groton Subordinated Back Leverage interest rate before Step Down Date | 8% | 22 |
| 2025-09-09 | 2025-Q3 | Groton Subordinated Back Leverage Loan Facility amount | 8.0 million | 22 |
| 2025-09-09 | 2025-Q3 | Groton Senior Back Leverage maturity | August 18, 2030 | 22 |
| 2025-09-09 | 2025-Q3 | Groton Senior Back Leverage Loan Facility amount | 12.0 million | 22 |
| 2025-09-09 | 2025-Q3 | Groton Senior Back Leverage Liberty Lender interest rate | 6.75% | 22 |
| 2025-09-09 | 2025-Q3 | Groton Senior Back Leverage DSCR requirement | 1.20:1.00 | 22 |
| 2025-09-09 | 2025-Q3 | Groton Senior Back Leverage Amalgamated Lender interest rate with Carbon Offset Event | 7.32% | 22 |
| 2025-09-09 | 2025-Q3 | Groton Senior Back Leverage Amalgamated Lender interest rate no Carbon Offset Event | 6.07% | 22 |
| 2025-09-09 | 2025-Q3 | Groton Interest Only Period | 84 months or until Groton Senior Back Leverage Loan fully repaid | 22 |
| 2025-09-09 | 2025-Q3 | Groton Back Leverage total drawn | 20.0 million | 22 |
| 2025-09-09 | 2025-Q3 | Generation backlog | 955.0 | 22 |
| 2025-09-09 | 2025-Q3 | Generation Backlog | $955.0 million | 23 |
| 2025-09-09 | 2025-Q3 | Future required payments (principal and interest) | 126.5 | 22 |
| 2025-09-09 | 2025-Q3 | EXIM Financing term | 7 years | 22 |
| 2025-09-09 | 2025-Q3 | EXIM Financing net proceeds | 9.2 million | 22 |
| 2025-09-09 | 2025-Q3 | EXIM Financing interest rate | 5.81% | 22 |
| 2025-09-09 | 2025-Q3 | EXIM Financing gross proceeds | 10.1 million | 22 |
| 2025-09-09 | 2025-Q3 | Derby Subordinated Back Leverage maturity | March 31, 2038 | 22 |
| 2025-09-09 | 2025-Q3 | Derby Subordinated Back Leverage interest rate | 8% | 22 |
| 2025-09-09 | 2025-Q3 | Derby Subordinated Back Leverage Loan Facility amount | 3.5 million | 22 |
| 2025-09-09 | 2025-Q3 | Derby Senior Back Leverage maturity | March 31, 2031 | 22 |
| 2025-09-09 | 2025-Q3 | Derby Senior Back Leverage interest rate | 7.25% | 22 |
| 2025-09-09 | 2025-Q3 | Derby Senior Back Leverage Loan Facility amount | 9.5 million | 22 |
| 2025-09-09 | 2025-Q3 | Derby Back Leverage total drawn | 13.0 million | 22 |
| 2025-09-09 | 2025-Q3 | Connecticut Loan term | 15 years | 22 |
| 2025-09-09 | 2025-Q3 | Connecticut Loan repayment penalty | 2.1 million | 22 |
| 2025-09-09 | 2025-Q3 | Connecticut Loan penalty per position below Employment Obligation | 14,225.00 (USD thousands) | 22 |
| 2025-09-09 | 2025-Q3 | Connecticut Loan interest rate | 2.0% | 22 |
| 2025-09-09 | 2025-Q3 | Connecticut Loan forgiveness amount if Employment Obligation met | 2.0 million | 22 |
| 2025-09-09 | 2025-Q3 | Connecticut Loan amount | 10.0 million | 22 |
| 2025-09-09 | 2025-Q3 | Cash and Cash Equivalents, Unrestricted | 174,662 (USD in thousands) | 23 |
| 2025-09-09 | 2025-Q3 | Backlog | $1.24 billion | 23 |
| 2025-09-09 | 2025-Q3 | Annualized production rate (nine months 2025) | 30.5 | 22 |
| 2025-09-09 | 2025-Q3 | Annualized production rate (nine months 2024) | 31.1 | 22 |
| 2025-09-09 | 2025-Q3 | Annualized production rate (Q3 2025) | 33.2 | 22 |
| 2025-09-09 | 2025-Q3 | Annualized production rate (Q3 2024) | 29.3 | 22 |
| 2025-09-09 | 2025-Q3 | Advanced Technologies contract backlog non US Government | 17.5 million | 22 |
| 2025-09-09 | 2025-Q3 | Advanced Technologies contract backlog US Government | 6.8 million | 22 |
| 2025-09-09 | 2025-Q3 | Advanced Technologies contract backlog | 24.3 (USD million) | 22 |
| 2025-09-09 | 2025-Q3 | Advanced Technologies contract backlog | 24.3 million | 22 |
| 2025-09-09 | 2025-Q3 | Advanced Technologies Backlog | $24.3 million | 23 |
| 2025-06-06 | 2025-Q2 | Restricted cash | 63.1 million | 20 |
| 2025-06-06 | 2025-Q2 | Outstanding Letters of Credit | 14.2 million | 20 |
| 2025-06-06 | 2025-Q2 | Non-U.S. Government funded backlog | 22.0 million | 20 |
| 2025-06-06 | 2025-Q2 | Generation Operating Portfolio | 62.8 MW | 20 |
| 2025-06-06 | 2025-Q2 | Finance obligation sale leaseback | 18.8 million | 20 |
| 2025-06-06 | 2025-Q2 | unrestricted cash and cash equivalents | 116.1 million | 20 |
| 2025-06-06 | 2025-Q2 | U.S. Treasury Securities carrying value | 60.9 million | 20 |
| 2025-06-06 | 2025-Q2 | U.S. Treasury Securities | 60.9 million | 20 |
| 2025-06-06 | 2025-Q2 | U.S. Government funded backlog | 7.6 million | 20 |
| 2025-06-06 | 2025-Q2 | Total project assets | 228.2 million | 20 |
| 2025-06-06 | 2025-Q2 | Total cash and restricted cash | 179.1 million | 20 |
| 2025-06-06 | 2025-Q2 | Total backlog | 1.26 billion | 20 |
| 2025-06-06 | 2025-Q2 | Service agreements backlog | 164.4 million | 20 |
| 2025-06-06 | 2025-Q2 | Product backlog | 98.2 million | 20 |
| 2025-06-06 | 2025-Q2 | Operating MW capacity | 62.8 MW | 20 |
| 2025-06-06 | 2025-Q2 | Net debt related to project assets | 112.1 million | 20 |
| 2025-06-06 | 2025-Q2 | Generation backlog | 967.4 million | 20 |
| 2025-06-06 | 2025-Q2 | Backlog | 1,259,597 (USD in thousands) | 21 |
| 2025-06-06 | 2025-Q2 | Annualized production rate | 30.6 MW | 20 |
| 2025-06-06 | 2025-Q2 | Advanced Technologies contract backlog | 29.6 million | 20 |
| 2025-06-06 | 2025-Q2 | Advanced Technologies contract backlog | 29.6 million | 20 |
| 2025-03-11 | 2025-Q1 | US Treasury Securities Weighted Average Yield | 4.30% | 18 |
| 2025-03-11 | 2025-Q1 | US Treasury Securities Carrying Value | 110.3 million | 18 |
| 2025-03-11 | 2025-Q1 | Restricted Cash Total | 62.4 million | 18 |
| 2025-03-11 | 2025-Q1 | Restricted Cash OpCo Financing | 25.5 million | 18 |
| 2025-03-11 | 2025-Q1 | Restricted Cash Groton Senior Back Leverage | 10.8 million | 18 |
| 2025-03-11 | 2025-Q1 | Restricted Cash Derby Back Leverage | 2.3 million | 18 |
| 2025-03-11 | 2025-Q1 | Restricted Cash Crestmark Sale Leaseback | 2.9 million | 18 |
| 2025-03-11 | 2025-Q1 | Outstanding Letters of Credit | 14.2 million | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing SOFR Margin Thereafter | 3% | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing SOFR Margin First Four Years | 2.5% | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Quarterly Principal Amortization Period | quarter ending June 2025 through quarter ending March 2026 | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Quarterly Principal Amortization | 675,000 per quarter | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Net Interest Rate Thereafter | 6.866% | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Net Interest Rate Four Years | 6.366% | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Fixed Rate Swap | 3.716% | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Facility Total Net Proceeds Company | 46.1 million | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Facility Total Capital Expenditure Reserve Target | 29.0 million | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Facility Term Loan | 80.5 million | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Facility Net Proceeds | 77.6 million | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Facility LC Facility | 6.5 million | 18 |
| 2025-03-11 | 2025-Q1 | OpCo Financing Facility Fees and Transaction Costs | 2.9 million | 18 |
| 2025-03-11 | 2025-Q1 | opco financing facility capital expenditure reserve | 14.5 million | 18 |
| 2025-03-11 | 2025-Q1 | opco financing debt service coverage ratio | 1.20:1.00 | 18 |
| 2025-03-11 | 2025-Q1 | opco financing base rate margin thereafter | 2% | 18 |
| 2025-03-11 | 2025-Q1 | opco financing base rate margin first four years | 1.5% | 18 |
| 2025-03-11 | 2025-Q1 | interest rate swap fair value loss | $(3.5) million | 18 |
| 2025-03-11 | 2025-Q1 | interest rate swap fair value gain | 0.9 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton unrestricted cash | 6.8 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton total debt service coverage ratio | 1.10:1.00 | 18 |
| 2025-03-11 | 2025-Q1 | Groton subordinated principal payment excess cash flow | 50% | 18 |
| 2025-03-11 | 2025-Q1 | Groton subordinated interest rate step down | 8% | 18 |
| 2025-03-11 | 2025-Q1 | Groton subordinated interest rate post step down floor | 5% | 18 |
| 2025-03-11 | 2025-Q1 | Groton subordinated DSCR reserve | 0.3 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton subordinated back leverage loan facility | 8.0 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton senior operations maintenance reserve | 6.5 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton senior interest rate Liberty | 6.75% | 18 |
| 2025-03-11 | 2025-Q1 | Groton senior interest rate Amalgamated no carbon offset | 6.07% | 18 |
| 2025-03-11 | 2025-Q1 | Groton senior interest rate Amalgamated carbon offset | 7.32% | 18 |
| 2025-03-11 | 2025-Q1 | Groton senior DSCR reserve accounts | 1.7 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton senior debt service coverage ratio | 1.20:1.00 | 18 |
| 2025-03-11 | 2025-Q1 | Groton senior back leverage loan facility | 12.0 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton Released to Parent | 11.1 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton Output Shortfall Payments | 1.3 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton Back Leverage Total Drawn | 20.0 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton Back Leverage Net Proceeds | 19.6 million | 18 |
| 2025-03-11 | 2025-Q1 | Groton Back Leverage Fees and Transaction Costs | 0.4 million | 18 |
| 2025-03-11 | 2025-Q1 | Generation Operating Portfolio | 62.8 MW | 18 |
| 2025-03-11 | 2025-Q1 | Finance Obligation Imputed Interest | 10.9 million | 18 |
| 2025-03-11 | 2025-Q1 | Finance Obligation Balance | 18.8 million | 18 |
| 2025-03-11 | 2025-Q1 | Connecticut State Loan Penalty per Position | 14,225.00 (USD thousands) | 18 |
| 2025-03-11 | 2025-Q1 | Connecticut State Loan Interest Rate | 2.0% | 18 |
| 2025-03-11 | 2025-Q1 | Connecticut State Loan Initial Disbursement | 10.0 million | 18 |
| 2025-03-11 | 2025-Q1 | Connecticut State Loan Forgiveness Eligible | 5.0 million | 18 |
| 2025-03-11 | 2025-Q1 | Connecticut State Loan Estimated Penalty | 2.1 million | 18 |
| 2025-03-11 | 2025-Q1 | Connecticut State Loan Employment Obligation Third Amendment | 538 retained | 18 |
| 2025-03-11 | 2025-Q1 | Connecticut State Loan Employment Obligation Second Amendment | 538 continuously maintained | 18 |
| 2025-03-11 | 2025-Q1 | Connecticut State Loan Employment Obligation Original | 165 created and 538 retained | 18 |
| 2025-03-11 | 2025-Q1 | Connecticut State Loan Credit Second Amendment | 2.0 million | 18 |
| 2025-03-11 | 2025-Q1 | Advanced Technologies US Government Funded | 8.2 million | 18 |
| 2025-03-11 | 2025-Q1 | Advanced Technologies Non-US Government Funded | 23.4 million | 18 |
| 2025-03-11 | 2025-Q1 | Advanced technologies contract backlog | 31.6 million | 18 |
| 2025-03-11 | 2025-Q1 | Unrestricted Cash and Cash Equivalents | $98.1 million | 18 |
| 2025-03-11 | 2025-Q1 | Unrestricted Cash and Cash Equivalents | $98,070 | 19 |
| 2025-03-11 | 2025-Q1 | US Treasury Securities | $110.3 million | 18 |
| 2025-03-11 | 2025-Q1 | Total Project Assets | $236.7 million | 18 |
| 2025-03-11 | 2025-Q1 | Total Backlog | $1.31 billion | 18 |
| 2025-03-11 | 2025-Q1 | Short-term Investments | $110,298 | 19 |
| 2025-03-11 | 2025-Q1 | Service Backlog | $172,326 | 19 |
| 2025-03-11 | 2025-Q1 | Service Agreements Backlog | $172.3 million | 18 |
| 2025-03-11 | 2025-Q1 | Restricted Cash and Cash Equivalents | $62,352 | 19 |
| 2025-03-11 | 2025-Q1 | Restricted Cash | $62.4 million | 18 |
| 2025-03-11 | 2025-Q1 | Product Backlog | $111.2 million | 18 |
| 2025-03-11 | 2025-Q1 | Product Backlog | $111,211 | 19 |
| 2025-03-11 | 2025-Q1 | Net Debt Project Assets | $114.3 million | 18 |
| 2025-03-11 | 2025-Q1 | Generation MW Operating | 62.8 | 18 |
| 2025-03-11 | 2025-Q1 | Generation Backlog | $997.4 million | 18 |
| 2025-03-11 | 2025-Q1 | Generation Backlog | $997,397 | 19 |
| 2025-03-11 | 2025-Q1 | Backlog | $1,312,500 | 19 |
| 2025-03-11 | 2025-Q1 | Advanced Technologies Backlog | $31.6 million | 18 |
| 2025-03-11 | 2025-Q1 | Advanced Technologies Backlog | $31,566 | 19 |
| 2024-12-27 | FY2024 | Loss Accruals on Service Agreements | $9.0 million | 17 |
| 2024-12-27 | FY2024 | Foreign Currency Portion of Cash and Cash Equivalents | approximately 1% | 17 |
| 2024-12-27 | FY2024 | Versa Pending U.S. Patent Applications | 13 | 17 |
| 2024-12-27 | FY2024 | Versa Patent Applications Pending in Other Jurisdictions | 30 | 17 |
| 2024-12-27 | FY2024 | Versa International Patents | 68 | 17 |
| 2024-12-27 | FY2024 | Versa U.S. Patents | 19 | 17 |
| 2024-12-27 | FY2024 | U.S. Patents Held (Excluding Subsidiaries) | 148 | 17 |
| 2024-12-27 | FY2024 | U.S. Grid Transmission Line Losses Average | about 5% | 17 |
| 2024-12-27 | FY2024 | U.S. Treasury Securities Weighted Average Yield to Maturity | 4.78% | 17 |
| 2024-12-27 | FY2024 | U.S. Treasury Securities carrying value | $109.1 million | 17 |
| 2024-12-27 | FY2024 | Torrington Facility Sized for Eventual Capacity | up to 200 MW per year | 17 |
| 2024-12-27 | FY2024 | Torrington Facility Size | 167,000 square feet | 17 |
| 2024-12-27 | FY2024 | Torrington Facility Maximum Annualized Capacity | 100 MW per year | 17 |
| 2024-12-27 | FY2024 | Torrington Facility Annualized Production Rate | 27.7 MW per year | 17 |
| 2024-12-27 | FY2024 | Taufkirchen facility module assembly capability | up to 20 MW per year | 17 |
| 2024-12-27 | FY2024 | Solid Oxide SOEC Manufacturing Capacity Potential | up to 80 MW per year | 17 |
| 2024-12-27 | FY2024 | Service Agreements Weighted Average Term | approximately 16 years | 17 |
| 2024-12-27 | FY2024 | Property Plant Equipment Expected FY2025 | 20.0 to 25.0 million | 17 |
| 2024-12-27 | FY2024 | Projects In Development | 1.3 MW | 17 |
| 2024-12-27 | FY2024 | Product warranty term in U.S. | 15 months after shipment or 12 months after acceptance | 17 |
| 2024-12-27 | FY2024 | Patents in other jurisdictions (excluding subsidiaries) | 307 | 17 |
| 2024-12-27 | FY2024 | Patent applications pending in other jurisdictions | 86 | 17 |
| 2024-12-27 | FY2024 | Patent applications pending in U.S. | 28 | 17 |
| 2024-12-27 | FY2024 | New carbon capture projects CO2 capture limit | no more than 250,000 tons of CO2 on a cumulative annual basis | 17 |
| 2024-12-27 | FY2024 | Long Term Project Assets Expected FY2025 | 3.0 to 6.0 million | 17 |
| 2024-12-27 | FY2024 | Legacy fuel cell modules target design life | 5-year | 17 |
| 2024-12-27 | FY2024 | LTSA and PPA expiration range | through 2042 | 17 |
| 2024-12-27 | FY2024 | Initial maximum Joint Development Agreement research cost reimbursement | 45.0 million | 17 |
| 2024-12-27 | FY2024 | Industry average experience modification rate | 1.0 | 17 |
| 2024-12-27 | FY2024 | Hourly rates increase in Amendment No. 5 | 15% | 17 |
| 2024-12-27 | FY2024 | Government funding percentage of revenue FY2024 | 4% | 17 |
| 2024-12-27 | FY2024 | Government funding percentage of revenue FY2023 | 3% | 17 |
| 2024-12-27 | FY2024 | Government funding percentage of revenue FY2022 | 6% | 17 |
| 2024-12-27 | FY2024 | Generation Operating Portfolio | 62.8 MW | 17 |
| 2024-12-27 | FY2024 | FuelCell Energy Solutions GmbH licensed patents outside U.S. | 7 | 17 |
| 2024-12-27 | FY2024 | FuelCell Energy Solutions GmbH licensed U.S. patents | 2 | 17 |
| 2024-12-27 | FY2024 | Fuel cell stack module design life | 25-to-30 years | 17 |
| 2024-12-27 | FY2024 | Extended maximum Joint Development Agreement research cost reimbursement | 67.0 million | 17 |
| 2024-12-27 | FY2024 | Experience modification rate 2024 | 0.83 | 17 |
| 2024-12-27 | FY2024 | Experience modification rate 2023 | 0.89 | 17 |
| 2024-12-27 | FY2024 | Experience modification rate 2022 | 0.088 | 17 |
| 2024-12-27 | FY2024 | Experience modification rate 2021 | 0.68 | 17 |
| 2024-12-27 | FY2024 | Experience modification rate 2020 | 0.59 | 17 |
| 2024-12-27 | FY2024 | Experience modification rate 2019 | 0.65 | 17 |
| 2024-12-27 | FY2024 | Experience modification rate 2018 | 0.62 | 17 |
| 2024-12-27 | FY2024 | EMTEC license agreement payment | 10 million | 17 |
| 2024-12-27 | FY2024 | Diverse team member population increase | 5% | 17 |
| 2024-12-27 | FY2024 | Current production fuel cell modules target design life | 7-year | 17 |
| 2024-12-27 | FY2024 | Conflict minerals (3TG) in fiscal year 2023 shipments | 14.0 pounds out of 4.6 million pounds (0.000299%) | 17 |
| 2024-12-27 | FY2024 | Company funded R&D expected FY2025 | 40.0 to 45.0 million | 17 |
| 2024-12-27 | FY2024 | Carbonate fuel cell electrical efficiency range | approximately 47% to 60% | 17 |
| 2024-12-27 | FY2024 | Carbonate Platform maximum annualized capacity | 100 MW | 17 |
| 2024-12-27 | FY2024 | Carbonate Platform future capacity | 200 MW | 17 |
| 2024-12-27 | FY2024 | Carbon capture demonstration | up to 95% | 17 |
| 2024-12-27 | FY2024 | Calgary facility total leased space | approximately 100,000 square feet | 17 |
| 2024-12-27 | FY2024 | Calgary facility potential total annualized SOEC manufacturing capacity | up to 80 MW per year | 17 |
| 2024-12-27 | FY2024 | Calgary facility current annualized SOEC production capacity | 6 MW | 17 |
| 2024-12-27 | FY2024 | Calgary facility additional leased space from fiscal 2024 and 2023 | approximately 68,000 square feet | 17 |
| 2024-12-27 | FY2024 | CHP system efficiency potential | up to 90% | 17 |
| 2024-12-27 | FY2024 | Annual hourly rates increase beginning March 31, 2025 | 3% | 17 |
| 2024-12-27 | FY2024 | Amendment No. 5 expected annual budget for JDA | at least 10.0 million per year | 17 |
| 2024-12-19 | FY2024 | unrestricted cash and cash equivalents | $148.1 million | 16 |
| 2024-12-19 | FY2024 | Cash and short-term investments | $318.0 million | 16 |
| 2024-12-19 | FY2024 | Backlog | $1,162,833 | 16 |
| 2024-09-05 | 2024-Q3 | unrestricted cash and cash equivalents | 159.3 million | 13 |
| 2024-09-05 | 2024-Q3 | U.S. Treasury Securities | 107.8 million | 13 |
| 2024-09-05 | 2024-Q3 | Total project assets | 248.8 million | 13 |
| 2024-09-05 | 2024-Q3 | Total backlog | 1.20 billion | 13 |
| 2024-09-05 | 2024-Q3 | Short-term investments | 107,817 (USD in thousands) | 14 |
| 2024-09-05 | 2024-Q3 | Service agreements backlog | 178.4 million | 13 |
| 2024-09-05 | 2024-Q3 | restricted cash and cash equivalents | 58.8 million | 13 |
| 2024-09-05 | 2024-Q3 | restricted cash and cash equivalents | 58,848 (USD in thousands) | 14 |
| 2024-09-05 | 2024-Q3 | Product backlog | 136.7 million | 13 |
| 2024-09-05 | 2024-Q3 | Pledged cash for performance security | 58.8 million | 13 |
| 2024-09-05 | 2024-Q3 | outstanding letters of credit | 14.2 million | 13 |
| 2024-09-05 | 2024-Q3 | Net debt related to project assets | 118.7 million | 13 |
| 2024-09-05 | 2024-Q3 | Generation operating portfolio capacity | 62.8 MW | 13 |
| 2024-09-05 | 2024-Q3 | Generation operating portfolio | 62.8 MW | 13 |
| 2024-09-05 | 2024-Q3 | Generation backlog | 839.5 million | 13 |
| 2024-09-05 | 2024-Q3 | Cash and cash equivalents, unrestricted | 159,347 (USD in thousands) | 14 |
| 2024-09-05 | 2024-Q3 | Cash and cash equivalents | 218.2 million | 13 |
| 2024-09-05 | 2024-Q3 | Backlog | $1,197,107 | 14 |
| 2024-09-05 | 2024-Q3 | Advanced Technologies contract backlog | 42.5 million | 13 |
| 2024-06-10 | 2024-Q2 | Unrestricted cash and equivalents | 158.8 million | 11 |
| 2024-06-10 | 2024-Q2 | Unrestricted Cash | 158.8 million | 12 |
| 2024-06-10 | 2024-Q2 | U.S. Government funded backlog | 12.7 million | 11 |
| 2024-06-10 | 2024-Q2 | Total backlog | 1.06 billion | 11 |
| 2024-06-10 | 2024-Q2 | Short-term Investments | 101.3 million | 12 |
| 2024-06-10 | 2024-Q2 | Service agreements backlog | 145.1 million | 11 |
| 2024-06-10 | 2024-Q2 | Service Backlog | 145,100 (USD in thousands) | 12 |
| 2024-06-10 | 2024-Q2 | Restricted cash pledged | 53.1 million | 11 |
| 2024-06-10 | 2024-Q2 | Product backlog | 12.3 million | 11 |
| 2024-06-10 | 2024-Q2 | Product Backlog | 12,307 (USD in thousands) | 12 |
| 2024-06-10 | 2024-Q2 | outstanding letters of credit | 14.2 million | 11 |
| 2024-06-10 | 2024-Q2 | Operating MW | 62.8 MW | 11 |
| 2024-06-10 | 2024-Q2 | Non U.S. Government funded backlog | 38.4 million | 11 |
| 2024-06-10 | 2024-Q2 | Net debt from project assets | 121.5 million | 11 |
| 2024-06-10 | 2024-Q2 | Generation operating portfolio | 62.8 MW | 11 |
| 2024-06-10 | 2024-Q2 | Generation backlog | 852.9 million | 11 |
| 2024-06-10 | 2024-Q2 | Generation Backlog | 852,933 | 12 |
| 2024-06-10 | 2024-Q2 | GGE LTSA contract value | 159.6 million USD | 11 |
| 2024-06-10 | 2024-Q2 | Cash and Short-term Investments | 313.2 million | 12 |
| 2024-06-10 | 2024-Q2 | Backlog | 1,061,452 (USD in thousands) | 12 |
| 2024-06-10 | 2024-Q2 | Advanced Technologies contract backlog | 51.1 million | 11 |
| 2024-06-10 | 2024-Q2 | Advanced Technologies backlog | 51.1 million | 11 |
| 2024-06-10 | 2024-Q2 | Advanced Technologies Backlog | 51,112 (USD in thousands) | 12 |
| 2024-03-07 | 2024-Q1 | Tulare biomat fuel contract duration | 20 years | 9 |
| 2024-03-07 | 2024-Q1 | Toyota hydrogen PPA through date | May 2025 | 9 |
| 2024-03-07 | 2024-Q1 | Toyota hydrogen PPA fuel contract duration | 2 years | 9 |
| 2024-03-07 | 2024-Q1 | Total debt service coverage ratio minimum | 1.10:1.00 | 9 |
| 2024-03-07 | 2024-Q1 | Subordinated back leverage loan step-down rate | 8% | 9 |
| 2024-03-07 | 2024-Q1 | Subordinated back leverage loan rate after step-down | lesser of 8% or 10 year U.S. Treasury Note plus 275 basis points (minimum 5% per annum) | 9 |
| 2024-03-07 | 2024-Q1 | Subordinated back leverage loan maturity date | September 30, 2038 | 9 |
| 2024-03-07 | 2024-Q1 | Subordinated back leverage loan interest-only period max | 84 months | 9 |
| 2024-03-07 | 2024-Q1 | Senior debt service coverage ratio minimum | 1.20:1.00 | 9 |
| 2024-03-07 | 2024-Q1 | Senior back leverage loans prepayment fee years 4-7 | 1% | 9 |
| 2024-03-07 | 2024-Q1 | Senior back leverage loans prepayment fee years 2-4 | 2% | 9 |
| 2024-03-07 | 2024-Q1 | Senior back leverage loans prepayment fee years 0-2 | 3% | 9 |
| 2024-03-07 | 2024-Q1 | Senior back leverage loans maturity date | August 18, 2030 | 9 |
| 2024-03-07 | 2024-Q1 | Senior back leverage loans amortization period | 10 years | 9 |
| 2024-03-07 | 2024-Q1 | RNG pricing sensitivity analysis annual impact | $2.0 million | 9 |
| 2024-03-07 | 2024-Q1 | Restricted cash performance security and letters of credit | $51.3 million | 9 |
| 2024-03-07 | 2024-Q1 | Restricted cash OpCo financing facility | $21.6 million | 9 |
| 2024-03-07 | 2024-Q1 | Restricted Cash Crestmark Sale Leaseback | $2.9 million | 9 |
| 2024-03-07 | 2024-Q1 | Restricted cash back leverage loan facility | $9.0 million | 9 |
| 2024-03-07 | 2024-Q1 | opco financing facility net rate thereafter | 6.866% | 9 |
| 2024-03-07 | 2024-Q1 | opco financing facility net rate first four years | 6.366% | 9 |
| 2024-03-07 | 2024-Q1 | opco financing facility fixed swap rate | 3.716% | 9 |
| 2024-03-07 | 2024-Q1 | natural gas sensitivity analysis annual impact | $26,000 | 9 |
| 2024-03-07 | 2024-Q1 | lipa yaphank ppa through date | September 2028 | 9 |
| 2024-03-07 | 2024-Q1 | lipa yaphank fixed price fuel contract duration | 7 years | 9 |
| 2024-03-07 | 2024-Q1 | Letters of credit outstanding | $14.2 million | 9 |
| 2024-03-07 | 2024-Q1 | interest rate swap fair value loss q1 2024 | $3.5 million | 9 |
| 2024-03-07 | 2024-Q1 | Generation Operating Portfolio | 62.8 MW | 9 |
| 2024-03-07 | 2024-Q1 | foreign currency cash percentage | 0.5% | 9 |
| 2024-03-07 | 2024-Q1 | derivative loss natural gas q1 2024 | $1.9 million | 9 |
| 2024-03-07 | 2024-Q1 | derby projects capacity | 14.0 MW and 2.8 MW | 9 |
| 2024-03-07 | 2024-Q1 | derby ppa through date | October 2029 | 9 |
| 2024-03-07 | 2024-Q1 | derby fixed price fuel contract duration | 6 years | 9 |
| 2024-03-07 | 2024-Q1 | connecticut loan principal amount | $10.0 million | 9 |
| 2024-03-07 | 2024-Q1 | connecticut loan penalty per position | $14,225.00 | 9 |
| 2024-03-07 | 2024-Q1 | connecticut loan interest rate | 2.0% | 9 |
| 2024-03-07 | 2024-Q1 | connecticut loan forgiveness eligible amount | $5.0 million | 9 |
| 2024-03-07 | 2024-Q1 | connecticut loan employment obligation positions | 538 (USD thousands) | 9 |
| 2024-03-07 | 2024-Q1 | connecticut loan credit eligible amount | $2.0 million | 9 |
| 2024-03-07 | 2024-Q1 | connecticut loan additional positions for credit | 91 (USD thousands) | 9 |
| 2024-03-07 | 2024-Q1 | bridgeport project capacity | 14.9 MW | 9 |
| 2024-03-07 | 2024-Q1 | Bishop Rule 10b5-1 Plan share sale | 64,853 shares | 9 |
| 2024-03-07 | 2024-Q1 | Bishop Rule 10b5-1 Plan expiration date | January 7, 2025 | 9 |
| 2024-03-07 | 2024-Q1 | Advanced Technologies US government-funded backlog | $3.7 million | 9 |
| 2024-03-07 | 2024-Q1 | Advanced Technologies non-US government-funded backlog | $19.7 million | 9 |
| 2024-03-07 | 2024-Q1 | Advanced technologies contract backlog | $23.4 million | 9 |
| 2024-03-07 | 2024-Q1 | Unrestricted cash and cash equivalents as of October 31, 2023 | 250.0 million | 9 |
| 2024-03-07 | 2024-Q1 | Total project assets | 260.8 million | 9 |
| 2024-03-07 | 2024-Q1 | Service agreements backlog | 140.4 million | 9 |
| 2024-03-07 | 2024-Q1 | restricted cash and cash equivalents | 51.3 million | 9 |
| 2024-03-07 | 2024-Q1 | Projects in development | 0.7 million | 9 |
| 2024-03-07 | 2024-Q1 | Pledged cash collateral for performance security | 51.3 million | 9 |
| 2024-03-07 | 2024-Q1 | Overall backlog | 1.03 billion | 9 |
| 2024-03-07 | 2024-Q1 | Operating power plants capacity | 62.8 MW | 9 |
| 2024-03-07 | 2024-Q1 | Operating installations | 260.1 million | 9 |
| 2024-03-07 | 2024-Q1 | Net debt outstanding related to project assets | 110.7 million | 9 |
| 2024-03-07 | 2024-Q1 | Generation backlog | 0.86 billion | 9 |
| 2024-03-07 | 2024-Q1 | Generation Operating Portfolio | 62.8 MW | 10 |
| 2024-03-07 | 2024-Q1 | Future required payments (principal and interest) | 134.8 million | 9 |
| 2024-03-07 | 2024-Q1 | Finance obligations under sale-leaseback transactions | 18.8 million | 9 |
| 2024-03-07 | 2024-Q1 | Depreciation of project assets | 6.8 million | 9 |
| 2024-03-07 | 2024-Q1 | Depreciation and amortization | 8.6 million | 9 |
| 2024-03-07 | 2024-Q1 | Backlog | 1,025,549 (USD in thousands) | 10 |
| 2024-03-07 | 2024-Q1 | Annualized production rate | 33.2 MW | 9 |
| 2024-03-07 | 2024-Q1 | Advanced Technologies contract backlog | 23.4 million | 9 |
| 2023-12-19 | FY2023 | Unrestricted cash and cash equivalents | 250.0 million | 7 |
| 2023-12-19 | FY2023 | Total backlog | 1.03 billion | 7 |
| 2023-12-19 | FY2023 | Short-term investments US Treasury securities | 103.8 million | 7 |
| 2023-12-19 | FY2023 | Service and generation backlog weighted average term | approximately 17 years | 7 |
| 2023-12-19 | FY2023 | Service agreements backlog | 140.8 million | 7 |
| 2023-12-19 | FY2023 | Projects under development | 19.4 MW | 7 |
| 2023-12-19 | FY2023 | Project assets | 258.1 million | 7 |
| 2023-12-19 | FY2023 | Product backlog | 0 (USD thousands) | 7 |
| 2023-12-19 | FY2023 | Operating portfolio of retained projects | 43.7 MW | 7 |
| 2023-12-19 | FY2023 | Operating generation portfolio | 43.7 MW | 7 |
| 2023-12-19 | FY2023 | Net debt outstanding related to project assets | 112.6 million | 7 |
| 2023-12-19 | FY2023 | Government funding percentage of revenue FY2023 | 3% | 7 |
| 2023-12-19 | FY2023 | Government funding percentage of revenue FY2022 | 6% | 7 |
| 2023-12-19 | FY2023 | government funding percentage of revenue FY2021 | 9% | 7 |
| 2023-12-19 | FY2023 | Generation Backlog | 872.1 million | 7 |
| 2023-12-19 | FY2023 | carbonate platforms installed and operating | more than 220 MW | 7 |
| 2023-12-19 | FY2023 | Annualized Production Rate | 32.7 MW | 7 |
| 2023-12-19 | FY2023 | Advanced technologies contract backlog | 15.3 million | 7 |
| 2023-12-19 | FY2023 | additional projects under development or construction | 19.4 MW | 7 |
| 2023-12-19 | FY2023 | unrestricted cash and cash equivalents | 250.0 million | 7 |
| 2023-12-19 | FY2023 | U.S. Treasury Securities carrying value | 103.8 million | 7 |
| 2023-12-19 | FY2023 | U.S. Government unfunded Advanced Technologies backlog | 0.3 million | 7 |
| 2023-12-19 | FY2023 | U.S. Government funded Advanced Technologies backlog | 4.3 million | 7 |
| 2023-12-19 | FY2023 | Torrington maximum annualized capacity | 100 MW per year | 7 |
| 2023-12-19 | FY2023 | Torrington Facility Annualized Production Rate | 32.7 MW per year | 7 |
| 2023-12-19 | FY2023 | Torrington eventual annualized production capacity | up to 200 MW per year | 7 |
| 2023-12-19 | FY2023 | Taufkirchen Germany capability | up to 20 MW per year | 7 |
| 2023-12-19 | FY2023 | South Korea installed base additional MW | more than 100 MW | 7 |
| 2023-12-19 | FY2023 | South Korea Noeul Green Energy long term service agreement term | 14 years | 7 |
| 2023-12-19 | FY2023 | South Korea KOSPO power plant project MW | 20 MW | 7 |
| 2023-12-19 | FY2023 | restricted cash and cash equivalents | 49.6 million | 7 |
| 2023-12-19 | FY2023 | pledged cash for performance security and letters of credit | 49.6 million | 7 |
| 2023-12-19 | FY2023 | outstanding letters of credit | 14.2 million | 7 |
| 2023-12-19 | FY2023 | Non U.S. Government funded Advanced Technologies backlog | 10.7 million | 7 |
| 2023-12-19 | FY2023 | loss accruals on service agreements October 31 2023 | 9.5 million | 7 |
| 2023-12-19 | FY2023 | loss accruals on service agreements October 31 2022 | 7.3 million | 7 |
| 2023-12-19 | FY2023 | Groton Project design rated output | 7.4 MW | 7 |
| 2023-12-19 | FY2023 | Groton Project current output | 6.0 MW | 7 |
| 2023-12-19 | FY2023 | Generation operating portfolio | 43.7 MW | 7 |
| 2023-12-19 | FY2023 | derivative gain from natural gas settling fiscal year 2023 | 4.1 million | 7 |
| 2023-12-19 | FY2023 | derivative fair value adjustment fiscal year 2023 | 3.3 million gain | 7 |
| 2023-12-19 | FY2023 | derivative fair value adjustment fiscal year 2022 | 0.9 million gain | 7 |
| 2023-12-19 | FY2023 | Depreciation of project assets FY2023 | 20.3 million | 7 |
| 2023-12-19 | FY2023 | Depreciation of project assets FY2022 | 15.5 million | 7 |
| 2023-12-19 | FY2023 | D&A FY2023 | 25.4 million | 7 |
| 2023-12-19 | FY2023 | D&A FY2022 | 21.3 million | 7 |
| 2023-12-19 | FY2023 | Company-funded R&D expenses FY2024 | 60.0 million to 70.0 million | 7 |
| 2023-12-19 | FY2023 | Company-funded R&D expenses FY2023 | 61.0 million | 7 |
| 2023-12-19 | FY2023 | Cash and cash equivalents and restricted cash | 299.6 million | 7 |
| 2023-12-19 | FY2023 | Calgary solid oxide production capacity expected FY2024 | 10 MW SOFC or 40 MW SOEC per year | 7 |
| 2023-12-19 | FY2023 | Calgary solid oxide production capacity current | 1 MW SOFC or 4 MW SOEC per year | 7 |
| 2023-12-19 | FY2023 | Calgary manufacturing facility expected capacity | 40 MW per year | 7 |
| 2023-12-19 | FY2023 | Calgary manufacturing facility current capacity | 4 MW per year | 7 |
| 2023-12-19 | FY2023 | Advanced Technologies contract backlog | 15.3 million | 7 |
| 2023-12-19 | 2023-Q4 | unrestricted cash and cash equivalents | $250.0 million | 8 |
| 2023-12-19 | 2023-Q4 | Short-term investments (U.S. Treasury Securities) | $103.8 million | 8 |
| 2023-12-19 | 2023-Q4 | restricted cash and cash equivalents | $49.6 million | 8 |
| 2023-12-19 | 2023-Q4 | Portfolio of generation assets | over 60 MW | 8 |
| 2023-12-19 | 2023-Q4 | Backlog | $1.028 billion | 8 |
| 2023-12-19 | 2023-Q4 | Annualized production rate (Carbonate Platform) | 32.7 MW | 8 |
| 2023-09-11 | 2023-Q3 | Unrestricted cash and equivalents | $303.7 million | 5 |
| 2023-09-11 | 2023-Q3 | unrestricted cash and cash equivalents | $303.7 million | 5 |
| 2023-09-11 | 2023-Q3 | Unrestricted Cash and Cash Equivalents | 303.7 (USD in thousands) | 6 |
| 2023-09-11 | 2023-Q3 | U.S. Treasury Securities Weighted Average Yield to Maturity | 5.09% | 5 |
| 2023-09-11 | 2023-Q3 | U.S. Treasury Securities carrying value | $77.4 million | 5 |
| 2023-09-11 | 2023-Q3 | Total space leased in Calgary | approximately 80,000 square feet | 5 |
| 2023-09-11 | 2023-Q3 | Total net proceeds to Company | $46.1 million | 5 |
| 2023-09-11 | 2023-Q3 | Total backlog | $1.06 billion | 5 |
| 2023-09-11 | 2023-Q3 | Torrington Facility Maximum Annualized Capacity | 100 MW per year | 5 |
| 2023-09-11 | 2023-Q3 | Torrington facility eventual production capacity | up to 200 MW per year | 5 |
| 2023-09-11 | 2023-Q3 | Term Loan principal amount | $80.5 million | 5 |
| 2023-09-11 | 2023-Q3 | Short-term investments (U.S. Treasury Securities) | $77.4 million | 5 |
| 2023-09-11 | 2023-Q3 | Shares reserved for issuance | 54,655,306 shares | 5 |
| 2023-09-11 | 2023-Q3 | Shares available for issuance | 55,295,919 shares | 5 |
| 2023-09-11 | 2023-Q3 | Service agreements backlog | $136.6 million | 5 |
| 2023-09-11 | 2023-Q3 | Service Backlog | 136.6 (USD in thousands) | 6 |
| 2023-09-11 | 2023-Q3 | restricted cash and cash equivalents | $32.7 million | 5 |
| 2023-09-11 | 2023-Q3 | RNG pricing sensitivity impact | $2.0 million per $10/MMBtu increase | 5 |
| 2023-09-11 | 2023-Q3 | Purchase of U.S. Treasury Securities (nine months ended July 31, 2023) | $195.8 million | 5 |
| 2023-09-11 | 2023-Q3 | Projects in Development | 19.4 MW | 5 |
| 2023-09-11 | 2023-Q3 | Project asset expenditures (nine months ended July 31, 2023) | $35.4 million | 5 |
| 2023-09-11 | 2023-Q3 | Project asset expenditures (nine months ended July 31, 2022) | $23.7 million | 5 |
| 2023-09-11 | 2023-Q3 | Proceeds from debt (nine months ended July 31, 2023) | $80.5 million | 5 |
| 2023-09-11 | 2023-Q3 | Potential total annualized SOEC manufacturing capacity | up to 80 MW per year | 5 |
| 2023-09-11 | 2023-Q3 | Potential additional SOEC manufacturing capacity at Calgary | up to an additional 40 MW per year | 5 |
| 2023-09-11 | 2023-Q3 | Payments of debt issuance costs (nine months ended July 31, 2023) | $2.9 million | 5 |
| 2023-09-11 | 2023-Q3 | Payments for preferred dividends and distribution to noncontrolling interest (nine months ended July 31, 2023) | $2.8 million | 5 |
| 2023-09-11 | 2023-Q3 | Payments for preferred dividends and distribution to noncontrolling interest (nine months ended July 31, 2022) | $2.6 million | 5 |
| 2023-09-11 | 2023-Q3 | outstanding letters of credit | $7.3 million | 5 |
| 2023-09-11 | 2023-Q3 | Net proceeds from sales of common stock (nine months ended July 31, 2023) | $85.9 million | 5 |
| 2023-09-11 | 2023-Q3 | Net proceeds from sales of common stock (nine months ended July 31, 2022) | $145.4 million | 5 |
| 2023-09-11 | 2023-Q3 | Net proceeds distributed to Parent | $34.9 million | 5 |
| 2023-09-11 | 2023-Q3 | Net interest rate (thereafter, new facility) | 6.866% | 5 |
| 2023-09-11 | 2023-Q3 | Net interest rate (first four years, new facility) | 6.366% | 5 |
| 2023-09-11 | 2023-Q3 | Net debt project assets | $94.9 million | 5 |
| 2023-09-11 | 2023-Q3 | Net contributions received from sale of noncontrolling interest in LIPA Yaphank Project (nine months ended July 31, 2022) | $11.9 million | 5 |
| 2023-09-11 | 2023-Q3 | Natural gas price sensitivity impact | $200,000 per $1/MMBtu increase | 5 |
| 2023-09-11 | 2023-Q3 | Letter of credit facility amount | $6.5 million | 5 |
| 2023-09-11 | 2023-Q3 | Interest rate swap fixed rate (new facility) | 3.716% | 5 |
| 2023-09-11 | 2023-Q3 | Green Bank Loan balance as of July 31, 2023 | $3.0 million | 5 |
| 2023-09-11 | 2023-Q3 | Generation operating portfolio capacity | 43.7 MW | 5 |
| 2023-09-11 | 2023-Q3 | Generation backlog | $915.1 million | 5 |
| 2023-09-11 | 2023-Q3 | Generation Operating Portfolio | 43.7 MW | 5 |
| 2023-09-11 | 2023-Q3 | Generation Backlog | 915.1 | 6 |
| 2023-09-11 | 2023-Q3 | Funds received from maturity of U.S. Treasury Securities (nine months ended July 31, 2023) | $120.9 million | 5 |
| 2023-09-11 | 2023-Q3 | Depreciation and amortization of project assets (three months ended July 31, 2023) | $5.4 million | 5 |
| 2023-09-11 | 2023-Q3 | Depreciation and amortization of project assets (three months ended July 31, 2022) | $4.1 million | 5 |
| 2023-09-11 | 2023-Q3 | Depreciation and amortization of project assets (nine months ended July 31, 2023) | $14.9 million | 5 |
| 2023-09-11 | 2023-Q3 | Depreciation and amortization of project assets (nine months ended July 31, 2022) | $11.8 million | 5 |
| 2023-09-11 | 2023-Q3 | Depreciation and amortization (three months ended July 31, 2023) | $6.6 million | 5 |
| 2023-09-11 | 2023-Q3 | Depreciation and amortization (three months ended July 31, 2022) | $5.3 million | 5 |
| 2023-09-11 | 2023-Q3 | Depreciation and amortization (nine months ended July 31, 2023) | $18.7 million | 5 |
| 2023-09-11 | 2023-Q3 | Depreciation and amortization (nine months ended July 31, 2022) | $16.4 million | 5 |
| 2023-09-11 | 2023-Q3 | Debt repayments (nine months ended July 31, 2023) | $42.2 million | 5 |
| 2023-09-11 | 2023-Q3 | Debt repayments (nine months ended July 31, 2022) | $7.2 million | 5 |
| 2023-09-11 | 2023-Q3 | Connecticut State Loan term | 15 years | 5 |
| 2023-09-11 | 2023-Q3 | Connecticut State Loan principal | $10.0 million | 5 |
| 2023-09-11 | 2023-Q3 | Connecticut State Loan interest rate | 2.0% | 5 |
| 2023-09-11 | 2023-Q3 | Company-funded research and development expenses (nine months ended July 31, 2023) | $43.0 million | 5 |
| 2023-09-11 | 2023-Q3 | Cash and cash equivalents and restricted cash | $336.4 million | 5 |
| 2023-09-11 | 2023-Q3 | Cash and Short-term Investments | 413.9 (USD in thousands) | 6 |
| 2023-09-11 | 2023-Q3 | Capital expenditures reserve required | $29.0 million | 5 |
| 2023-09-11 | 2023-Q3 | Capital expenditures reserve funded from closing | $14.5 million | 5 |
| 2023-09-11 | 2023-Q3 | Capital expenditures (nine months ended July 31, 2023) | $28.0 million | 5 |
| 2023-09-11 | 2023-Q3 | Capital expenditures (nine months ended July 31, 2022) | $15.8 million | 5 |
| 2023-09-11 | 2023-Q3 | Calgary facility capacity expansion (current to planned) | 4 MW to 10 MW per year (SOFC) or 4 MW to 40 MW per year (SOEC) | 5 |
| 2023-09-11 | 2023-Q3 | Backlog | 1,063.3 (USD in thousands) | 6 |
| 2023-09-11 | 2023-Q3 | Authorized shares of common stock | 500,000,000 shares | 5 |
| 2023-09-11 | 2023-Q3 | Advanced Technologies contract backlog | $11.6 million | 5 |
| 2023-09-11 | 2023-Q3 | Advanced Technologies contract backlog | $11.6 million | 5 |
| 2023-09-11 | 2023-Q3 | Advanced Technologies Backlog | 11.6 (USD in thousands) | 6 |
| 2023-09-11 | 2023-Q3 | Additional space leased in Calgary | approximately 48,000 square feet | 5 |
| 2023-06-08 | 2023-Q2 | Unrestricted cash | 246.8 million | 3 |
| 2023-06-08 | 2023-Q2 | Total backlog | 1.02 billion | 3 |
| 2023-06-08 | 2023-Q2 | Short-term investments treasury | 76.4 million | 3 |
| 2023-06-08 | 2023-Q2 | Service agreements backlog | 73.7 million | 3 |
| 2023-06-08 | 2023-Q2 | Product backlog | 26 thousand | 3 |
| 2023-06-08 | 2023-Q2 | Operating MW capacity | 43.7 MW | 3 |
| 2023-06-08 | 2023-Q2 | MW in process | 19.4 MW | 3 |
| 2023-06-08 | 2023-Q2 | Generation Backlog | 926.0 million | 3 |
| 2023-06-08 | 2023-Q2 | Advanced technologies backlog | 22.6 million | 3 |
| 2023-06-08 | 2023-Q2 | unrestricted cash and cash equivalents | $246.8 million | 3 |
| 2023-06-08 | 2023-Q2 | Unrestricted cash | 246.8 million | 4 |
| 2023-06-08 | 2023-Q2 | U.S. Treasury Securities carrying value | $76.4 million | 3 |
| 2023-06-08 | 2023-Q2 | Toyota project expensed costs | $11.6 million | 3 |
| 2023-06-08 | 2023-Q2 | Total project assets | $237.2 million | 3 |
| 2023-06-08 | 2023-Q2 | restricted cash and cash equivalents | $30.2 million | 3 |
| 2023-06-08 | 2023-Q2 | Projects under development and construction | 19.4 MW | 3 |
| 2023-06-08 | 2023-Q2 | pledged cash and cash equivalents for performance security | $30.2 million | 3 |
| 2023-06-08 | 2023-Q2 | outstanding letters of credit | $9.1 million | 3 |
| 2023-06-08 | 2023-Q2 | Operating project assets revenue | $18.0 million | 3 |
| 2023-06-08 | 2023-Q2 | Operating project assets | 43.7 MW | 3 |
| 2023-06-08 | 2023-Q2 | D&A (three months ended April 30, 2023) | $6.6 million | 3 |
| 2023-06-08 | 2023-Q2 | D&A (three months ended April 30, 2022) | $5.3 million | 3 |
| 2023-06-08 | 2023-Q2 | D&A (six months ended April 30, 2023) | $12.0 million | 3 |
| 2023-06-08 | 2023-Q2 | D&A (six months ended April 30, 2022) | $11.1 million | 3 |
| 2023-06-08 | 2023-Q2 | Company-funded R&D expenses | $27.4 million | 3 |
| 2023-06-08 | 2023-Q2 | Cash and short-term investments | 353.5 million | 4 |
| 2023-06-08 | 2023-Q2 | Cash and cash equivalents and restricted cash | $277.1 million | 3 |
| 2023-06-08 | 2023-Q2 | Capitalized project asset expenditures | $19.8 million | 3 |
| 2023-06-08 | 2023-Q2 | Backlog | 1,022,296 (USD in thousands) | 4 |
| 2023-06-08 | 2023-Q2 | Advanced Technologies contract backlog | $22.6 million | 3 |
| 2023-03-09 | 2023-Q1 | unrestricted cash and cash equivalents | 315.2 million | 1 |
| 2023-03-09 | 2023-Q1 | unrestricted cash and cash equivalents | 315.2 million | 2 |
| 2023-03-09 | 2023-Q1 | Total project assets | 229.9 million | 1 |
| 2023-03-09 | 2023-Q1 | Total backlog | 1.06 billion | 1 |
| 2023-03-09 | 2023-Q1 | Total Backlog | 1,061,107 (USD in thousands) | 2 |
| 2023-03-09 | 2023-Q1 | Solid Oxide Platform planned additional U.S. capacity | 400 MW | 2 |
| 2023-03-09 | 2023-Q1 | Solid Oxide Platform expected annualized electrolysis production capacity after Calgary expansion | 40 MWs | 2 |
| 2023-03-09 | 2023-Q1 | Solid Oxide Platform Calgary facility expansion space | approximately 80,000 square feet | 2 |
| 2023-03-09 | 2023-Q1 | Short-term investments in U.S. Treasury Securities | 75.7 million | 1 |
| 2023-03-09 | 2023-Q1 | Short-term investments in U.S. Treasury Securities | 75.7 million | 2 |
| 2023-03-09 | 2023-Q1 | Service agreements backlog | 99.9 million | 1 |
| 2023-03-09 | 2023-Q1 | restricted cash and cash equivalents | 24.6 million | 1 |
| 2023-03-09 | 2023-Q1 | restricted cash and cash equivalents | 24.6 million | 2 |
| 2023-03-09 | 2023-Q1 | Projects in development capacity | 19.4 MW | 1 |
| 2023-03-09 | 2023-Q1 | outstanding letters of credit | 5.0 million | 1 |
| 2023-03-09 | 2023-Q1 | Operating power plants capacity | 43.7 MW | 1 |
| 2023-03-09 | 2023-Q1 | Net debt outstanding related to project assets | 68.7 million | 1 |
| 2023-03-09 | 2023-Q1 | Generation backlog | 0.9 billion | 1 |
| 2023-03-09 | 2023-Q1 | Cash, Restricted Cash and Short-Term Investments | 415.4 million | 2 |
| 2023-03-09 | 2023-Q1 | Carbonate Platform planned annualized production rate for fiscal year 2023 | 45 MW | 2 |
| 2023-03-09 | 2023-Q1 | Carbonate Platform maximum annualized capacity | 100 MW | 2 |
| 2023-03-09 | 2023-Q1 | Carbonate Platform eventual capacity with additional investment | 200 MW | 2 |
| 2023-03-09 | 2023-Q1 | Carbonate Platform annualized production rate | 38.2 MW | 2 |
| 2023-03-09 | 2023-Q1 | Backlog - Service | 99,852 (USD in thousands) | 2 |
| 2023-03-09 | 2023-Q1 | Backlog - Product | 0 (USD in thousands) | 2 |
| 2023-03-09 | 2023-Q1 | Backlog - Generation | 934,484 | 2 |
| 2023-03-09 | 2023-Q1 | Backlog - Advanced Technologies | 26,771 (USD in thousands) | 2 |
| 2023-03-09 | 2023-Q1 | Advanced Technologies contract backlog | 26.8 million | 1 |
Guidance Tracking (latest per metric/period · 8/14)#
All management forecasts (guidance) and their later outcome. Types: fiscal-year targets as well as quarterly/half-year targets; per metric and period the most recent statement applies, older versions can be expanded. The status is checked automatically against the actuals reported later: open (period still running), met, beaten, missed. For ranges (“X to Y”) reaching the range counts. Logged neutrally, no estimate of our own, no assessment.
Actuals: revenue in $m
| For period | Guided on | Metric | Guided | Actual | Verdict | Direction | Source |
|---|---|---|---|---|---|---|---|
| FY2027 | 2026-06-08 | Groton Project upgrade cost | 20–30 | – | pending | initiated | 28 |
| FY2026 | 2026-06-08 | Company-funded R&D expenses | 30–35 | – | pending | initiated | 30 |
| FY2026 | 2026-06-08 | Property, plant and equipment expenditures | 20–30 | – | pending | initiated | 28 |
| 2026-Q4 | 2026-09-02 | EBITDA (adjusted) | positive | – | pending | initiated | 31 |
| FY2025 | 2025-09-09 | Capex | 15–20 | – | – | confirmed | 22 |
| FY2025 | 2025-09-09 | Company-funded R&D expenses | 35–40 | – | – | confirmed | 22 |
| FY2025 | 2024-12-19 | Revenue | material improvement | 158.2 | – | raised | 16 |
| FY2025 | 2024-12-19 | Operating costs | ~15% | – | – | confirmed | 16 |
| FY2024 | 2024-09-05 | Project asset expenditures | 12–15 | – | – | cut | 13 |
| FY2024 | 2024-09-05 | Property, plant and equipment expenditures | 45–60 | – | – | cut | 13 |
| FY2024 | 2024-09-05 | Company-funded R&D expenses | 56–61 | – | – | cut | 13 |
| FY2023 | 2023-06-08 | Capex | 60–90 | – | – | confirmed | 3 |
| FY2023 | 2023-06-08 | Research and development expenses | 50–70 | – | – | confirmed | 3 |
| FY2023 | 2023-06-08 | Remaining investment in project assets | 45–65 | – | – | confirmed | 3 |
Development#
A condensed summary per reporting period as running text: what changed operationally, which drivers management names, how earnings and cash flow developed. Most recent period first, grouped by year; each text is written from the original report of that period, superscript numbers lead to the source.
FY2026
FuelCell Energy recorded total revenue of $99.1 million across the first three quarters of fiscal year 2026 (November 2025 through July 2026), compared with approximately $103.1 million in the equivalent prior-year period, as strong Q1 growth driven by GGE and CGN Platform module deliveries was followed by a 29% year-over-year revenue decline in Q3 as GGE module shipments moderated (26, 30). Operating losses across the nine-month period were materially influenced by a $42.6 million non-cash impairment charge in Q2, recorded after performance issues with SureSource 4000 fuel cells at the Groton Project led the company to elect an upgrade to standard 2.5 MW power blocks at an estimated cost of $20 to $30 million, with completion expected in fiscal year 2027 (28). Unrestricted cash and cash equivalents rose to $658.1 million by July 31, 2026, from $278.1 million at the start of the fiscal year, supported by $453.6 million in net equity proceeds over nine months including a $245.5 million underwritten public offering completed in July 2026 (30). In Q3, the company entered a Capital Equipment Purchase Agreement with Fit Energy USA LP for approximately $2.6 billion to supply up to 380 MW of carbonate fuel cell systems, increasing Committed Backlog 4.1% to $1.30 billion and generating a $2.4 billion Awarded Capacity Backlog for an optional additional 350 MW (30, 31). The company also initiated guidance targeting positive Adjusted EBITDA in Q4 fiscal year 2027, contingent on conversion of the Awarded Capacity Backlog and continued execution of cost reduction initiatives (31).
FY2025
FuelCell Energy reported total revenues of $158.2 million in fiscal year 2025, a 41% increase from $112.1 million in fiscal 2024, driven primarily by a 169% surge in product revenues to $69.1 million, with $66.0 million recognized under the long-term service agreement with Gyeonggi Green Energy Co., Ltd. for delivery of 22 replacement fuel cell modules at its 58.8 MW facility in South Korea (24). Gross margin improved to (16.7)% from (32.0)%, reflecting better cost absorption as production volumes increased at the Torrington manufacturing facility (24). The company recorded a $65.8 million non-cash impairment charge related to prior investments in solid oxide technology, including goodwill, in-process research and development, property, plant and equipment, and inventory, and conducted two global restructuring actions in November 2024 and June 2025, reducing the global workforce by approximately 35% in aggregate (24). Net loss attributable to common stockholders widened to $191.1 million ($7.42 per share) from $129.2 million, largely due to the impairment charges (24). Unrestricted cash increased to $278.1 million from $148.1 million at fiscal year-start, supported by at-the-market equity issuances of approximately 25.6 million shares at an average price of $7.44 per share and a new $25.0 million EXIM financing closed in November 2025 (24).
FY2024
FuelCell Energy's total revenues for fiscal year 2024 declined 9% to $112.1 million from $123.4 million in FY2023, as an 80% drop in Service agreements revenues to $10.0 million – driven by only 2 module exchanges versus 15 in the prior year – more than offset a 33% increase in Generation revenues to $50.0 million and a 54% rise in Advanced Technologies contract revenues to $26.5 million 17. The operating generation portfolio expanded from 43.7 MW to 62.8 MW as the Toyota Project, Derby 14.0 MW Project, and Derby 2.8 MW SCEF Project achieved commercial operations in Q1 2024 9. Gross loss widened to $35.9 million with a negative 32.0% gross margin, and the operating loss increased to $158.5 million from $136.1 million in FY2023 17. The Gyeonggi Green Energy long-term service agreement for 58.8 MW, valued at $159.6 million, drove total backlog 13.1% higher to $1.16 billion as of October 31, 2024 16. In November 2024, the company announced a global restructuring with a 17% total workforce reduction, deferred the Calgary capacity expansion, and disclosed it would not meet previously provided aspirational revenue targets for FY2025 and FY2030 due to slower-than-expected hydrogen adoption and delayed commercialization timelines for SOEC, SOFC, and carbon capture products 16.
FY2023
FuelCell Energy reported total revenues of $123.4 million in fiscal year 2023, a 5% decline from $130.5 million in fiscal year 2022, as a 284% increase in service agreements revenues to $49.1 million from 15 new module exchanges -- primarily at Korea Southern Power Company facilities -- was more than offset by lower product revenues and a 20% decline in Advanced Technologies contract revenues 7. Gross margin improved to (8.5)% from (22.7)% in the prior fiscal year, driven by higher-margin service agreement activity, while the loss from operations narrowed to $136.1 million from $143.7 million 7. The net loss attributable to common stockholders decreased to $110.8 million from $145.9 million in fiscal year 2022, though adjusted EBITDA deteriorated to $(102.9) million from $(91.7) million in the prior year 8. Company-funded research and development expenses increased to $61.0 million from $34.5 million, reflecting accelerated investment in solid oxide platform commercialization and carbon capture technology development 7. Unrestricted cash ended the fiscal year at $250.0 million, with total cash and restricted cash declining from $481.0 million to $299.6 million, partly reflecting the purchase of U.S. Treasury Securities classified outside unrestricted cash 7.
Sources: official investor relations documents#
All original documents used, with type (e.g. quarterly, half-year, annual report), publication date and a direct link to the filing (EDINET/SEC/IR). Every superscript number in the report points to an entry in this list; so every figure can be traced back to its place in the original.
| # | Document type | Published | Link |
|---|---|---|---|
| #1 | 10-Q | 2023-03-09 | Open |
| #2 | 8-K-EX99.1 | 2023-03-09 | Open |
| #3 | 10-Q | 2023-06-08 | Open |
| #4 | 8-K-EX99.1 | 2023-06-08 | Open |
| #5 | 10-Q | 2023-09-11 | Open |
| #6 | 8-K-EX99.1 | 2023-09-11 | Open |
| #7 | 10-K | 2023-12-19 | Open |
| #8 | 8-K-EX99.1 | 2023-12-19 | Open |
| #9 | 10-Q | 2024-03-07 | Open |
| #10 | 8-K-EX99.1 | 2024-03-07 | Open |
| #11 | 10-Q | 2024-06-10 | Open |
| #12 | 8-K-EX99.1 | 2024-06-10 | Open |
| #13 | 10-Q | 2024-09-05 | Open |
| #14 | 8-K-EX99.1 | 2024-09-05 | Open |
| #15 | 8-K-EX99.1 | 2024-11-15 | Open |
| #16 | 8-K-EX99.1 | 2024-12-19 | Open |
| #17 | 10-K | 2024-12-27 | Open |
| #18 | 10-Q | 2025-03-11 | Open |
| #19 | 8-K-EX99.1 | 2025-03-11 | Open |
| #20 | 10-Q | 2025-06-06 | Open |
| #21 | 8-K-EX99.1 | 2025-06-06 | Open |
| #22 | 10-Q | 2025-09-09 | Open |
| #23 | 8-K-EX99.1 | 2025-09-09 | Open |
| #24 | 10-K | 2025-12-18 | Open |
| #25 | 8-K-EX99.1 | 2025-12-18 | Open |
| #26 | 10-Q | 2026-03-09 | Open |
| #27 | 8-K-EX99.1 | 2026-03-09 | Open |
| #28 | 10-Q | 2026-06-08 | Open |
| #29 | 8-K-EX99.1 | 2026-06-08 | Open |
| #30 | 10-Q | 2026-09-02 | Open |
| #31 | 8-K-EX99.1 | 2026-09-02 | Open |
Older sources (+16)
| # | Document type | Published | Link |
|---|---|---|---|
| #209 | 10-K | 2016-03-10 | Open |
| #208 | 10-Q | 2016-06-09 | Open |
| #211 | 10-K | 2017-01-12 | Open |
| #210 | 10-Q | 2017-06-08 | Open |
| #213 | 10-K | 2018-01-11 | Open |
| #212 | 10-Q | 2018-06-07 | Open |
| #215 | 10-K | 2019-01-10 | Open |
| #214 | 10-Q | 2019-06-17 | Open |
| #203 | 10-K | 2020-01-22 | Open |
| #216 | 10-Q | 2020-03-16 | Open |
| #201 | 10-Q | 2020-06-12 | Open |
| #202 | 10-Q | 2020-09-10 | Open |
| #207 | 10-K | 2021-01-21 | Open |
| #204 | 10-Q | 2021-03-16 | Open |
| #205 | 10-Q | 2021-06-10 | Open |
| #206 | 10-Q | 2021-09-14 | Open |
FAQ#
Is there a management forecast (guidance) for FY2027?
Yes. Management has issued targets for FY2027, including Groton Project upgrade cost. The guidance tracking chapter shows all targets and checks them against the actuals reported later; neutral, with no estimate of our own.
Does FuelCell Energy, Inc. pay a dividend?
The filings report on the dividend; most recent entry: dividends paid $2.8 million (2023-Q3) (as reported, no assessment of our own). Details with source links are in the report chapters.
Where can I find the official investor relations documents of FuelCell Energy, Inc.?
The sources chapter links all 47 original filings used (SEC filings) with type, publication date and a direct link; every figure in the report carries a source number.