FuelCell Energy designs, manufactures, installs, and operates carbonate fuel cell power plants that generate electricity and heat through an electrochemical process using natural gas, biogas, or other hydrogen-bearing fuels. FuelCell Energy stock (FCEL): Quarterly and annual results since 2023 from Quarterly Report and SEC filings: revenue, earnings, balance sheet, cash flow and management guidance, every figure with its source. As of 09/2026, quarterly reporting. Stock analysis by NadirAlpha. FuelCell Energy stock (FCEL): listed on Nasdaq. NadirAlpha has evaluated 47 original documents, cross-checked every figure automatically and linked each to its source; sources as of 09/2026. Revenue Q3 FY2026 (May to Jul 2026): USD 33 million (-29% year on year). Latest reported (Q3 FY2026 (May to Jul 2026)): Annualized production rate, sales pipeline, Torrington facility expansion target. Latest reading: Revenue decelerating, Net cash build, Guidance initiated, Partnership, New market.

Revenue decelerating Net cash build Guidance initiated strategy: Partnership strategy: New market

NadirAlpha editorial team · About us · Methodology

The new quarter, monitored by AI. · NadirAlpha follows every stock through its original filings: the latest figures against their history, guidance against actuals; neutral, continuously updated, every figure clickable with its source.
AI-generated report · not investment advice · figures extracted automatically; please verify against the linked original more
AI-generatedCreated with AI assistance from the company's linked original filings (transparency per Art. 50 EU AI Act). More about the tool: Claude Code.
Not investment adviceNeutral financial information, no recommendation, no investment research within the meaning of MiFID II.
Verify yourselfFigures are extracted automatically, errors are possible. Every figure is clickable with its source; the issuer's original documents are always authoritative.
EditorialThe texts (business model, current status, development and others) are written AI-editorially from the original reports alone, cross-checked automatically and backed with sources; the company's own account, no assessment of our own. Methodology
AI research · This page works as a source-backed data basis for further research with AI assistants such as Claude; every figure remains verifiable via the source links.

FuelCell Energy Current Status

Where FuelCell Energy stands after the report for Q3 FY2026: what changed in revenue, earnings and outlook, written editorially from the original report. NadirAlpha methodology

Assessment by NadirAlpha, as of Q3 FY2026 (May to Jul 2026).

FuelCell Energy reported revenue of 33 million for the third fiscal quarter of 2026, down 29% from the prior-year period, driven by lower delivery and commissioning of fuel cell modules for the GGE Platform 30. Diluted EPS was -0.64 for the quarter, and unrestricted cash and cash equivalents reached 658.1 million as of July 31, 2026, supported by an underwritten public offering in July that generated net proceeds of approximately $245.5 million 30 31. Committed Backlog stood at $1.30 billion as of July 31, 2026, and the company reported an Awarded Capacity Backlog of $2.4 billion related to Fit Energy's options for up to an additional 350 MW of capacity 31. The quarter included execution of a $2.6 billion Capital Equipment Purchase Agreement with Fit Energy USA LP for up to 380 MW of carbonate fuel cell systems and signing of a first Capacity Reservation Agreement with a major data center operator for a planned 75 MW project in Texas 30 31.
Management commentary on the 2026-Q3 results (8-K-EX99.1, 2026-09-02):

“The expansion of our Committed and Awarded Capacity Backlog to $3.6 billion reflects increasing customer demand for reliable, scalable infrastructure that reduces dependence on constrained transmission systems, simplifies permitting, and enables AI driven compute to be deployed faster.”

Jason Few, President and Chief Executive Officer 31

“Demand for electricity is accelerating, driven by AI, data centers, and the broader electrification of the economy. With a growing commercial pipeline, expanding manufacturing capacity, and differentiated technology, we believe FuelCell Energy is well positioned to capitalize on these long-term market tailwinds.”

Jason Few, President and Chief Executive Officer 31
Revenue · 2026-Q333$ million−29.3 % vs. 2025-Q3
Net profit · 2026-Q3-44$ million+51.5 % vs. 2025-Q3
EPS · 2026-Q3-0.64$+66.1 % vs. 2025-Q3
Revenue trend
Guidance
For FY2026, FuelCell Energy guides Company-funded R&D expenses 30 to 35 $ million (confirmed); Property, plant and equipment expenditures 20 to 30 $ million (initiated). 30 For 2026-Q4, FuelCell Energy guides EBITDA (adjusted) positive (initiated). 31
Profitability
Gross loss widened to $(24.5) million in Q3 2026 from $(5.1) million in Q3 2025, including approximately $4.0 million in inventory write-downs to net realizable value and $13.0 million in losses on firm purchase commitments related to Phase 0 of the CEPA with Fit Energy 30. Operating loss was 46.7 million, an improvement from 95.4 million in the prior-year quarter, which had included significant impairment and restructuring charges not repeated in Q3 2026 30. Net loss was 44.5 million for the quarter, with free cash flow of -13.5 million 31.
Leverage
As of July 31, 2026, FuelCell held a net cash position of 504.5 million (cash exceeding total debt obligations); cash, cash equivalents, restricted cash and restricted cash equivalents combined totaled $737.3 million 31. Operating cash outflow for Q3 2026 was 12.2 million 30. The 2026 EXIM Financing, closed during the quarter, requires the company to maintain a minimum unrestricted cash balance of $65.0 million, with potential reduction to $15.0 million upon satisfying specified debt service coverage and leverage conditions 30.
Management view
FuelCell Energy targets positive Adjusted EBITDA results in Q4 fiscal 2027, subject to conversion of Awarded Capacity Backlog and continued execution of cost reduction initiatives 31. Manufacturing capacity expansion at the Torrington, Connecticut facility is underway, targeting an annualized production rate of 500 MW by June 2028, with estimated investment of $200.0 to $275.0 million 30. FuelCell Energy's sales pipeline for fiscal year 2026 grew to approximately 10 GW, reflecting broad commercial interest in carbonate fuel cell technology 31.
Change
Generation revenues declined to $8.8 million in Q3 2026 from $12.4 million in Q3 2025, with the Groton Project (7.4 MW) contributing no operating revenue while undergoing an equipment upgrade 30. Impairment expense of $42.6 million was recorded during the nine months ended July 31, 2026 related to the Groton Project equipment upgrade, with estimated remaining investment of $20.0 to $30.0 million expected to be completed in fiscal 2027 30. FuelCell Energy had previously reduced its workforce by approximately 39% in aggregate through successive measures between September 2024 and June 2025 as part of cost-saving efforts 30.
Risks (current)
Product costs currently exceed CEPA pricing at the company's present production volume of 37.1 MW, creating a cost-recovery gap expected to narrow as manufacturing scale increases 31. The Groton Project's extended downtime has eliminated operating revenues from that asset and resulted in potential debt service coverage ratio covenant defaults under its back-leverage financing, for which waivers have been obtained from lenders 30. FuelCell Energy faces an estimated $2.1 million repayment obligation related to a Connecticut state loan for failure to meet employment requirements, and the solid oxide electrolysis platform's commercialization timeline remains uncertain and dependent on partners for deployment 30.
New this reporting period
During Q3 2026, FuelCell delivered its first two industrial-scale carbon capture modules to ExxonMobil Technology and Engineering Company in Rotterdam, Netherlands, marking the first demonstration of the jointly developed carbon capture technology at commercial scale 31. FuelCell Energy completed repowering of the Gyeonggi Green Energy fuel cell park in South Korea with delivery of six additional fuel cell modules, bringing total deliveries to 42 modules since 2024 31. FuelCell also signed an MOU with Siemens for design and supply of electrical balance of plant systems to support faster and lower-cost deployment of commercial fuel cell projects exceeding 100 MW 31.

FuelCell Energy Stock: Key Figures ($ million)

Revenue, margin, earnings and EPS of FuelCell Energy per fiscal year, half-year and quarter in $ million, as of Q3 FY2026, as reported in the filing; restatements show the most recent filing version. NadirAlpha extracts all values automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original. NadirAlpha methodology

All figures serve only to support your own investment decision and are not a recommendation; the company's original reports are authoritative.

Revenue ($ million) · annual basis, as reported
Net income ($ million) · annual basis, as reported
EPS ($) · annual basis, as reported
Operating cash flow ($ million) · annual basis, as reported
Revenue ($ million) · quarterly basis, as reported
Net income ($ million) · quarterly basis, as reported
EPS ($) · quarterly basis, as reported
Operating cash flow ($ million) · quarterly basis, as reported
Cash ($ million) · annual basis, as reported
Debt ($ million) · annual basis, as reported
Net Debt ($ million) · annual basis, as reported
Capex ($ million) · annual basis, as reported
FCF ($ million) · annual basis, as reported
D&A ($ million) · annual basis, as reported
Cash ($ million) · quarterly basis, as reported
Debt ($ million) · quarterly basis, as reported
Net Debt ($ million) · quarterly basis, as reported
Capex ($ million) · quarterly basis, as reported
FCF ($ million) · quarterly basis, as reported
D&A ($ million) · quarterly basis, as reported
Shown: the most recent fiscal years. Full history since FY2016 is on record.

Fiscal years

Amounts in $ million · EPS in $ per share · as reported
FuelCell Energy stock: key figures on annual basis, FY2023 to FY2025, in $ million. Compiled by NadirAlpha from SEC filings.
PeriodCalendar quarterRevenueOp. incomeNet incomeEPS ($)EBITDA (adj.)OCFSource
FY2025Q4/2024–Q4/2025158.2-192.3-187.9-3.71-74.44-125.325
FY2024Q4/2023–Q4/2024112.1-158.5-126-3.92-101.11-152.916
FY2023Q4/2022–Q4/2023123.4-136.1-107.6-3.96-102.88-140.27

Quarters

Amounts in $ million · EPS in $ per share · as reported
FuelCell Energy stock: key figures on quarterly basis, 2023-Q1 to 2026-Q3, in $ million. Compiled by NadirAlpha from SEC filings.
PeriodCalendar quarterPublishedRevenueOp. incomeNet incomeEPS ($)EPS adj. ($)EBITDA (adj.)FCFCashNet DebtSource
2026-Q3*Q2–Q3/20262026-09-0233-46.7-44.5-0.64-0.64°-36.7-13.5658.1-504.530
2026-Q2*Q1–Q2/20262026-06-0835.6-77.9-77.9-1.45–-17.1-29373.2-23928
2026-Q1*Q4/2025–Q1/20262026-03-0930.5-26.3-22.9-0.49–-17-34.7311.8-173.626
2025-Q4*Q3–Q4/20252025-12-1855-28.3-29.9-0.59*≈–-17.7-23.9278.1-158.524
2025-Q3*Q2–Q3/20252025-09-0946.7-95.4-91.7-1.89–-16.4-32.1174.7-51.622
2025-Q2*Q1–Q2/20252025-06-0637.4-35.8-38-0.90–-19.3-35.2116.110.420
2025-Q1*Q4/2024–Q1/20252025-03-1119-32.9-28.3-0.71–-21.1-52.898.131.118
2024-Q4*Q3–Q4/20242024-11-1549.3-41-41.4-1.28*≈–-25.3-4.7148.1-16.515
2024-Q3*Q2–Q3/20242024-09-0523.7-33.6-32.7-1.01*≈–-20.1-76.8159.3-34.413
2024-Q2*Q1–Q2/20242024-06-1022.4-41.4-32.1-1.00*≈–-26.5-50.3158.8-30.911
2024-Q1*Q4/2023–Q1/20242024-03-0716.7-42.5-19.8-0.61*≈–-29.1-68.8297.5-1809
2023-Q4*Q3–Q4/20232023-12-1922.5-36.4-30.4-1.12*≈–-30.8-27.1250-130.57
2023-Q3*Q2–Q3/20232023-09-1125.5-41.4-24.3-0.06–-0.03-47303.7-198.75
2023-Q2*Q1–Q2/20232023-06-0838.3-35.9-34.3-0.09–-26-44.4246.8-166.93
2023-Q1*Q4/2022–Q1/20232023-03-0937.1-22.5-18.6-0.05–-14.4-61.1315.2-2341
* derived: values with formula provenance (hover); Q4 = FY − 9M · H2 = FY − H1 · EPS via implied shares · net debt = financial debt − cash · FCF = OCF − |capex|.
EPS/EPS adj. before 2026-03-09 split-adjusted (÷2; stock split detected via implied diluted share count).
Columns not reported in this reporting cadence are hidden: Op. income (adj.) (not reported in any source for these periods).

FuelCell Energy Balance Sheet & Cash Flow ($ million)

NadirAlpha places cash, debt, operating cash flow and investments of FuelCell Energy side by side per period, balance sheet values as of the period end, flow items for the period. NadirAlpha extracts all values automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original. NadirAlpha methodology

Fiscal years

Amounts in $ million · as reported
FuelCell Energy stock: balance sheet and cash flow on annual basis, FY2023 to FY2025, in $ million. Compiled by NadirAlpha from SEC filings.
PeriodCalendar quarterPublishedCashDebtNet DebtD&AOCFCapexFCFSource
FY2025Q4/2024–Q4/20252025-12-18278.1119.6-158.540.4-125.318.6-143.924
FY2024Q4/2023–Q4/20242024-12-19148.1131.7-16.536.2-152.947.7-200.616
FY2023Q4/2022–Q4/20232023-12-19250119.5-130.525.4-140.239.4-179.67

Quarters

Amounts in $ million · as reported
FuelCell Energy stock: balance sheet and cash flow on quarterly basis, 2023-Q1 to 2026-Q3, in $ million. Compiled by NadirAlpha from SEC filings.
PeriodCalendar quarterPublishedCashDebtNet DebtD&AOCFCapexFCFSource
2026-Q3Q2–Q3/20262026-09-02658.1153.6-504.59.4-12.21.3-13.530
2026-Q2Q1–Q2/20262026-06-08373.2134.2-23910.8-27.31.7-2928
2026-Q1Q4/2025–Q1/20262026-03-09311.8138.2-173.610.5-33.90.8-34.726
2025-Q4Q3–Q4/20252025-12-18278.1119.6-158.59.8-22.91-23.924
2025-Q3Q2–Q3/20252025-09-09174.7123.1-51.69.7-26.85.2-32.122
2025-Q2Q1–Q2/20252025-06-06116.1126.510.410.9-29.95.3-35.220
2025-Q1Q4/2024–Q1/20252025-03-1198.1129.231.19.9-45.77.1-52.818
2024-Q4Q3–Q4/20242024-12-19148.1131.7-16.58.85.810.5-4.716
2024-Q3Q2–Q3/20242024-09-05159.3125-34.49.2-63.413.4-76.813
2024-Q2Q1–Q2/20242024-06-10158.8127.9-30.99.6-37.113.2-50.311
2024-Q1Q4/2023–Q1/20242024-03-07297.5117.4-1808.6-58.310.6-68.89
2023-Q4Q3–Q4/20232023-12-19250119.5-130.56.7-15.811.3-27.17
2023-Q3Q2–Q3/20232023-09-11303.7105-198.76.6-35.811.2-475
2023-Q2Q1–Q2/20232023-06-08246.879.9-166.96.6-35.39.1-44.43
2023-Q1Q4/2022–Q1/20232023-03-09315.281.1-2345.4-53.47.8-61.11
Debt = long-term + current · Net debt = debt − cash · FCF = OCF − capex.

FuelCell Energy Guidance Tracking (latest per metric/period · 8/14)

What FuelCell Energy guided for Q3 FY2026 and beyond and whether the targets were met; ranges count as met when the actual lies within. NadirAlpha methodology

Actuals: revenue in $m

Direction: confirmedcutinitiatedraised Verdict: pending

FuelCell Energy: guidance and actuals per metric and period, 14 entries. Compiled by NadirAlpha from SEC filings.
For periodGuided onMetricGuidedActualVerdictDirectionSource
FY20272026-06-08Groton Project upgrade cost20–30–28
FY20262026-06-08Company-funded R&D expenses30–35–30
FY20262026-06-08Property, plant and equipment expenditures20–30–28
2026-Q42026-09-02EBITDA (adjusted)positive–31
FY20252025-09-09Capex15–20––22
FY20252025-09-09Company-funded R&D expenses35–40––22
FY20252024-12-19Revenuematerial improvement158.2–16
FY20252024-12-19Operating costs~15%––16
FY20242024-09-05Project asset expenditures12–15––13
FY20242024-09-05Property, plant and equipment expenditures45–60––13
FY20242024-09-05Company-funded R&D expenses56–61––13
FY20232023-06-08Capex60–90––3
FY20232023-06-08Research and development expenses50–70––3
FY20232023-06-08Remaining investment in project assets45–65––3

FuelCell Energy Stock: Price & Chart

Interactive price chart of FuelCell Energy stock (TradingView) and the trend of key figures from the core tables; the chart loads only after a click and then connects to TradingView. NadirAlpha methodology

Daily candles with news and earnings markers. Loads only on click.

Advertisement · affiliate links; we may earn a commissionAffiliate partnerships help us keep these reports free and regularly updated.

FuelCell Energy Event Timeline

This timeline collects the material events of FuelCell Energy from the original reports: guidance changes, revenue and margin signals, strategy shifts, product and M&A announcements, grouped by quarter. NadirAlpha methodology

Overview: one dot per event · click jumps to the period
earningsrevenuemarginguidancestrategyfinancials2023-Q12023-Q22023-Q32023-Q42024-Q12024-Q22024-Q32024-Q42025-Q12025-Q22025-Q32025-Q42026-Q12026-Q22026-Q3
2026 · 13 events

Guidance initiated 2026-09-02
Targeting positive Adjusted EBITDA in Q4 fiscal year 2027, subject to conversion of awarded capacity backlog and continued execution of cost reduction initiatives 31
Partnership 2026-09-02
Signed Capital Equipment Purchase Agreement with Fit Energy USA LP for approximately $2.6 billion covering up to 380 MW across four phases; Fit Energy's options on additional 350 MW added $2.4 billion to awarded capacity backlog 30, 31
New market 2026-09-02
Signed first Capacity Reservation Agreement with a major data center operator for a planned 75 MW project in Texas, including an upfront reservation payment 31
Revenue decelerating 2026-09-02
Revenue growth decelerated to -29.3% YoY (prior period -4.8%). 30
Net cash build 2026-09-02
Net cash position expanded to USD 504.5 million from USD 239.0 million in 2026-Q2 (+111%, derived from reported financial debt minus cash). 30

“This past quarter also reflected progress toward expanding the capacity of our Torrington manufacturing facility to support an annualized production rate of up to 500 MW. We believe our balance sheet, including approximately $441 million in total cash and cash equivalents as of April 30, 2026, positions us well to execute on the pipeline opportunities, scale responsibly, and create long-term value for our shareholders and stakeholders.”

Jason Few, President and Chief Executive Officer 29
Operational disruption 2026-06-08
Recorded $42.6 million non-cash impairment charge for Groton Project due to performance issues with SureSource 4000 fuel cells; project not operating as of April 30, 2026 pending equipment upgrade estimated to cost $20.0 to $30.0 million, expected completion in fiscal year 2027 28
Strategic pivot 2026-06-08
Initiated manufacturing capacity expansion at Torrington, CT facility targeting 500 MW annualized production rate, requiring an estimated $200 to $275 million investment over 24 months 28
New market 2026-06-08
Announced standardized 12.5 MW FuelCell Energy Block for data center power; sales pipeline reached 4 gigawatts, described as a 267% increase from Q1 2026 29
Revenue decelerating 2026-06-08
Revenue growth decelerated to -4.8% YoY (prior period +60.5%). 28
Segment divergence 2026-06-08
Product revenue grew +39.2% to USD 18.1 million in 2026-Q2 (51% of group revenue) while group revenue changed -4.8%. 29

“During the first fiscal quarter, we delivered strong revenue growth, sharpened operating discipline, and strengthened our liquidity position, all while positioning FuelCell Energy to capture the defining opportunity of the AI era”

Jason Few, President and Chief Executive Officer 27
earnings 2026-03-09
Loss from operations improved to 26.3 million from $32.9 million in Q1 2025, primarily due to lower administrative, selling, and research and development expenses following restructuring actions 26
Revenue accelerating 2026-03-09
Revenue increased 61% to 30.5 million from $19.0 million in Q1 2025, driven by product revenues from GGE and CGN platform module deliveries in South Korea rising to $12.0 million from $0.1 million 27
Partnership 2026-03-09
Announced collaboration with Sustainable Development Capital LLP (SDCL) targeting up to 450 megawatts of identified projects 27
2025 · 16 events

“We believe that our fourth quarter performance and ongoing cost reductions have positioned us well to meet the accelerating demand for electricity and data center projects in the U.S. and internationally. Our strategy is deeply focused on the data center market where we see significant opportunities for our efficient, resilient power solutions. We've simplified our product line, advanced efficiency, and integrated absorption chilling to help manage thermal loads–critical for high-compute environments. Our sales and marketing focus is increasingly centered on data center opportunities, as we have taken deliberate steps to prepare for this market, and we are actively engaging with data center operators and infrastructure finance providers to deliver the message that we are ready to provide reliable, cost-competitive solutions for these energy-intensive applications. We will maintain our disciplined approach to growth and manufacturing capacity expansion, with the goal of leveraging our decades of utility-scale experience to deliver reliable, cost-competitive solutions for these energy-intensive applications in the future.”

Jason Few, President and Chief Executive Officer 25
revenue 2025-12-18
Q4 revenue +12% to $55.0M; full-year revenue +41% to $158.2M, with product revenues surging 169% to $69.1M from GGE LTSA module deliveries (25)
Margin expanding 2025-12-18
Full-year gross margin improved to (16.7)% from (32.0)%; Q4 gross loss narrowed to $(6.6)M from $(10.9)M prior year (25)
New market 2025-12-18
30% Investment Tax Credit reinstated for fuel cells through at least 2032 under One Big Beautiful Bill Act; Section 45Q incentives increased to $85 per metric ton for carbon capture and utilization (24)
Revenue decelerating 2025-12-18
Revenue growth decelerated to +11.6% YoY (prior period +97.0%). 24
Net cash build 2025-12-18
Net cash position expanded to USD 158.5 million from USD 51.6 million in 2025-Q3 (+207%, derived from reported financial debt minus cash). 24

“In our third fiscal quarter, we delivered meaningful revenue growth while advancing execution of our long-term strategy. We improved our core carbonate platform by increasing efficiency above 50% and focused on working to expand our opportunities in distributed generation and deepen our sales pipeline by leveraging our large-scale deployments to engage prospective data center customers. The decisive restructuring actions we implemented in June are already showing results -- lowering costs, sharpening our focus on distributed power generation, and positioning us for investment in technologies and partnerships that can unlock future growth.”

Jason Few, President and Chief Executive Officer 23
earnings 2025-09-09
$64.5M non-cash impairment of solid oxide technology assets (goodwill, IPR&D, PP&E, inventory) drove operating loss to $95.4M from $33.6M prior year; impairment and restructuring expenses are the primary drivers (22)
Revenue accelerating 2025-09-09
Revenue +97% to $46.7M driven by $24.0M from GGE LTSA for eight fuel cell module deliveries in Korea (23)
Net debt to net cash 2025-09-09
Unrestricted cash rose to $174.7M; net cash position of $51.6M achieved, reversing net debt of $10.4M at Q2 end, aided by $38.1M in ATM equity proceeds from 6.8M shares during the quarter (22)

“In our second fiscal quarter, we delivered sequential revenue growth and continued executing on the disciplined cost management strategy we initiated in late 2024, in recognition of the changing energy landscape.”

Jason Few, President and Chief Executive Officer 21
Revenue accelerating 2025-06-06
Revenue +67% to $37.4M; product revenues of $13.0M recognized for first time, driven by $12.0M from GGE LTSA module replacements and $1.1M from Ameresco contract (21)
Strategic pivot 2025-06-06
Board approved 22% global workforce reduction (122 employees) and cessation of majority of solid oxide development efforts; refocus on carbonate-based distributed generation for data center and grid resilience applications (20)
New market 2025-06-06
Dedicated Power Partners strategic partnership with Diversified Energy Co. and TESIAC Corp. formally launched to accelerate entry into data center power market (21)

“We've made measurable strides since our global restructuring was announced early in the first fiscal quarter. Our cost-saving initiatives are already yielding positive outcomes, and our commitment to uncovering and capitalizing on growth opportunities is paying off. Compared to the first quarter of last fiscal year, our revenue has grown while our expenses have declined, significantly narrowing our operating losses and accelerating our journey towards profitability. Looking ahead, we expect this quarter will be the low-water mark for our quarterly revenue for fiscal year 2025 based on our expected production and module shipment schedule, especially as it relates to our module deliveries to our customers in Korea.”

Jason Few, President and Chief Executive Officer 19
revenue 2025-03-11
Total revenue +14% to $19.0M from $16.7M; backlog grew 28% to $1.31B from $1.03B (18)
Margin expanding 2025-03-11
Gross loss improved to $(5.2)M from $(11.7)M; gross margin (27.4)% vs. (70.2)% prior year (18)
New market 2025-03-11
Strategic partnership formed with Diversified Energy Co. and TESIAC to develop integrated fuel cell energy assets for data centers; JDA with Malaysia Marine and Heavy Engineering for large-scale electrolysis systems in Asia, New Zealand, and Australia (18)
Net cash to net debt 2025-03-11
Net debt position flipped (-16.5 to +USD 31.1 million vs 2024-Q4). 18
Revenue decelerating 2025-03-11
Revenue growth decelerated to +13.8% YoY (prior period +119.1%). 18
2024 · 12 events

“In the fourth quarter, our revenue more than doubled, year over year, mainly driven by module sales to Gyeonggi Green Energy Co., Ltd. in South Korea. Looking ahead, we believe that global demand for energy remains strong in markets around the world, driven by data centers, AI, cryptocurrency growth, the need for more resilient and reliable grids, and carbon recovery and capture.”

Jason Few, President and Chief Executive Officer 16

“We have always known that the energy transition would not be linear, and we have built a portfolio of products and applications that allow FuelCell Energy to pivot when necessary. The steps announced today enable us to navigate the current market while maintaining the flexibility to capture tailwinds. These tailwinds are strengthened by power shortages in grids, high voltage transmission needs, and delays in centralized power projects due to lengthy permitting processes, which our distributed energy platforms do not experience. Additional power demand opportunities are driven by data centers, AI, cryptocurrency growth, more resilient and reliable grids, and carbon recovery and capture.”

Jason Few, President and Chief Executive Officer 15
Revenue accelerating 2024-12-19
Q4 revenue increased 120% to $49.3M, primarily driven by $18.0M from Gyeonggi Green Energy module sales agreement and $7.7M from Ameresco contract 16
Guidance cut 2024-12-19
Company disclosed it will not meet previously provided aspirational revenue targets for FY2025 and FY2030 due to slower-than-expected hydrogen adoption and delayed commercialization timelines for SOEC, SOFC, and carbon capture products 16
Strategic pivot 2024-11-15
Global restructuring announced with 17% total workforce reduction (4% in September 2024 plus 13% in November 2024), deferred Calgary capacity expansion, and reallocation of resources toward core molten carbonate distributed power solutions to address grid deficiencies and data center demand 15

“While we execute on our current opportunity set, we are also focused on building our sales pipeline. We believe we are positioned to capitalize on market opportunities, ranging from built-in fuel diversity which supports biogas applications and hydrogen blending, similar to our work with Ameresco in Sacramento, CA, to the growing power and absorption or electrical cooling needs of edge data centers. Our goal is to generate steady, predictable results now while keeping our focus on future growth.”

Jason Few, President and Chief Executive Officer 14
earnings 2024-09-05
Loss from operations improved to -$33.6M from -$41.4M in prior year quarter; adjusted EBITDA improved to -$20.1M from -$31.6M, driven by lower selling, administrative, and R&D expenses 14
Revenue decelerating 2024-09-05
Total Q3 revenue decreased 7% YoY to $23.7M; Service agreement revenue declined to $1.4M from $9.8M due to absence of module exchanges in the quarter, partially offset by Generation +22% to $13.4M and Advanced Technologies +84% to $8.6M 14
New market 2024-09-05
Signed long-term service agreement with Gyeonggi Green Energy for 58.8 MW facility in Korea valued at $159.6 million, adding $126.0M to product backlog; total backlog increased 12.6% to $1.20 billion 13

“Subsequent to the end of the quarter, we announced an agreement to supply Gyeonggi Green Energy Co., Ltd. (GGE) with 42 upgraded fuel cell modules, representing approximately $160 million in new backlog. In addition to the sale of these modules, under the agreement, we will also provide long term operations and maintenance services for GGE's Hwaseong Balan Industrial Complex, which is the world's largest fuel cell power platform site. Importantly, we continue to expand our manufacturing capacity and sales pipeline, while keeping a disciplined focus on cash management and the strength of our balance sheet.”

Jason Few, President and Chief Executive Officer 12
Revenue decelerating 2024-06-10
Revenue decreased 42% YoY to $22.4M, primarily due to no module exchanges during the service period compared to twelve module exchanges in the prior year; Generation revenue increased 67% to $14.1M driven by Toyota and Derby projects 12
guidance 2024-06-10
Capex guidance for FY2024 reduced to $45-60M from $60-75M due to deferral of certain Calgary expansion elements; R&D spending guidance reduced to $60-65M from $60-70M 11
Strategic pivot 2024-06-10
Nasdaq delisting notice received May 31, 2024 for non-compliance with minimum bid price requirement of $1.00 per share; company given until November 27, 2024 to regain compliance 11

“It's important to note that, during the comparable prior-year quarter, we reported a one-time revenue benefit from the expiration of a material right related to an extended warranty obligation and higher service revenues from required module replacements.”

Jason Few, President and Chief Executive Officer 10
Revenue decelerating 2024-03-07
Total revenues decreased 55% to $16.7M from $37.1M, primarily due to no product revenues and lower service agreement revenues reflecting completion of a prior-year multi-year fleet upgrade cycle 9
Margin compressing 2024-03-07
Gross loss of $11.7M versus gross profit of $5.2M in Q1 2023; margin shifted to -70.2% from +14.1%, driven by unfavorable Generation margins including $3.5M in expensed Toyota Project construction and gas costs and $1.9M derivative loss on natural gas contract 10
New market 2024-03-07
Operating generation portfolio reached 62.8 MW from 43.7 MW as Toyota Project, Derby 14.0 MW Project, and Derby 2.8 MW SCEF Project achieved commercial operations 9
2023 · 11 events

“We remain fully focused on our central purpose of enabling a world empowered by clean energy by decarbonizing power and generating hydrogen.”

Jason Few, President and CEO 8
Revenue decelerating 2023-12-19
Q4 revenues decreased 43% to $22.5 million from $39.2 million, primarily due to lower product revenues 8
Margin expanding 2023-12-19
Q4 gross loss improved to $(1.5) million from $(15.2) million in Q4 2022 8
New market 2023-12-19
ExxonMobil affiliate Esso Nederland BV announced plans to build a pilot plant in Rotterdam to test carbonate fuel cell technology for industrial carbon capture 8

“We continue to execute on our strategy, proving our technologies in critical applications and supporting decarbonization across the globe. We believe that strong and growing demand for clean energy technologies combined with government policy support has generated significant potential in our markets.”

Jason Few, President and Chief Executive Officer 6
Revenue decelerating 2023-09-11
Q3 revenues decreased 41% year-over-year to $25.5 million due to absence of module sales to Korea Fuel Cell Co., Ltd. compared to the prior year period 6
Margin compressing 2023-09-11
Q3 gross loss widened to $(8.2) million from $(4.2) million in the prior year quarter, primarily due to absence of higher-margin module sales 6
New market 2023-09-11
Entered 14-year long-term service agreement with Noeul Green Energy Co., Ltd. in Korea for 20 MW fuel cell park with contract value of approximately $73 million 6

“Commercially, we've seen a number of trends that drive our confidence in our strategy.”

Jason Few, President and Chief Executive Officer 4
Revenue accelerating 2023-06-08
Q2 revenues increased 134% year-over-year to $38.3 million, primarily driven by service agreements revenue from KOSPO module exchanges in Korea 4
New market 2023-06-08
Received order from ExxonMobil affiliate for fuel cell equipment and engineering support for carbon capture demonstration 4

“We remain focused on executing our project backlog and growing our generation operating portfolio and expect the Toyota and Derby projects to achieve commercial operation during calendar year 2023. Regarding our continued work with ExxonMobil Technology and Engineering Company, or EMTEC, we announced in December that we have extended the term of our Joint Development Agreement through August 31, 2023, and increased the maximum amount of contract consideration to be reimbursed by EMTEC by 20%, from $50 million to $60 million. This important, long-term partnership supports our efforts to commercialize large scale fuel cell carbon capture and storage technology.”

Jason Few, President and Chief Executive Officer 2
revenue 2023-03-09
Q1 revenues rose 17% to $37.1 million, with service agreements revenues up 541% to $13.9 million driven by new module exchanges in Woodbridge, CT and Korea 1
Margin expanding 2023-03-09
Gross result turned to profit of $5.2 million from a gross loss of $2.9 million in Q1 2022, reflecting favorable product margins and lower manufacturing variances 2
Revenue decelerating 2023-03-09
Revenue growth decelerated to +16.7% YoY (prior period +182.0%). 1

FuelCell Energy Business Model

The FuelCell Energy business model in brief: products, customers and revenue sources as the company itself describes them in its reports. NadirAlpha methodology

FuelCell Energy designs, manufactures, installs, and operates carbonate fuel cell power plants that generate electricity and heat through an electrochemical process using natural gas, biogas, or other hydrogen-bearing fuels. FuelCell Energy's revenues flow from three channels: product sales covering delivery of fuel cell modules and systems to third-party customers including utilities and industrial buyers in the United States, South Korea, and other international markets; generation revenues from ownership and operation of power plants under long-term power purchase agreements; and long-term service agreements covering maintenance and operation of installed customer systems. FuelCell is also developing adjacent technologies, including an industrial-scale carbon capture system co-developed with ExxonMobil that uses carbonate fuel cell chemistry to capture CO2 from industrial exhaust streams, and a solid oxide electrolysis platform for hydrogen production. FuelCell Energy's growth strategy is anchored on a $2.6 billion Capital Equipment Purchase Agreement with Fit Energy USA LP for up to 380 MW of generating capacity and the broader conversion of contracted and awarded backlog into delivered product revenue, while scaling its Torrington, Connecticut manufacturing facility toward a 500 MW annualized production rate by June 2028.

FuelCell Energy Stock: Share-Price Drivers

What determines the business trajectory of FuelCell Energy according to management, summarised from the reports up to Q3 FY2026. NadirAlpha methodology

Commercialisation of new fuel-cell projects and product deliveries while operating losses and cash burn persist
Product revenues reached USD 69.1 million in FY2025 (up 169%, margin 19.9%), 24, yet the operating result was still a loss of 46.7 million in 2026-Q3, 31, so the pace of project wins against a deep loss position drives the equity story.
Product revenue and delivery ramp
Product revenues rose to USD 69.1 million in FY2025 (up 169%, margin 19.9%), 24; quarterly revenue was 33 million in 2026-Q3, 31.
Service agreements base
Service agreements revenues were USD 20.4 million in FY2025 (up 105%, margin 11.0%), 24; supported by long-term service agreements such as the Gyeonggi Green Energy 58.8 MW LTSA, 23.
Advanced Technologies and carbon capture traction
Advanced Technologies contract revenues were USD 20.6 million in FY2025 (up 22%, margin 26.7%), 24; ExxonMobil carbon capture module deployment launched in Q3 2026, 31.
Large-scale project pipeline and partnerships
Phase 0 delivery to Fit Energy (30 MW) planned for Q4 2026, Siemens MOU for electrical balance-of-plant systems and Torrington facility expansion to 500 MW, 31; Gyeonggi Green Energy fuel cell park repowering completed in Q3 2026, 31.
Manufacturing scale-up
Achievement of a 100 MW annualized production rate reported for October 2026, 31.
Operating losses and cash burn
Operating loss of 46.7 million and free cash outflow of 13.5 million in 2026-Q3, 31; profitability flagged as negative.
Liquidity position
Cash of 658.1 million at 2026-Q3, higher than 373.2 million at 2026-Q2, 31.
Forward guidance
Guidance was initiated, with several projects such as the Hartford 7.4 MW system expected December 2026, 20, and Torrington 500 MW expansion targeted for June 2028, 31.

Sector trend: Fuel-cell demand is broadening across power generation, distributed power, carbon capture and electrolysis, with segment revenues and margins moving higher in FY2025 (Product margin 19.9%, Advanced Technologies margin 26.7%), 24. Sector-wide profitability remains negative as companies scale manufacturing, with FuelCell still reporting operating losses in 2026-Q3, 31.

FuelCell Energy Revenue by Type (as of 2026-Q3 · USD million · 7/7)

The segments of FuelCell Energy in the company's own definition, each row with its basis (3, 6 or 12 months), rows in grey are no longer reported separately. NadirAlpha methodology

FuelCell Energy: revenue by segment, as of 2026-Q3, in USD million. Compiled by NadirAlpha from SEC filings.
SegmentSinceRevenueGrowthMarginSource
Period 2026-Q1 (3M)
Product2022-Q412––27
Generation2022-Q411––27
Advanced Technologies2022-Q44.3––27
Service2022-Q43.2––27
Period FY2025 (12M)
Product revenuesFY202369.1169%19.9%24
Advanced Technologies contract revenuesFY202320.622%26.7%24
Service agreements revenuesFY202320.4105%11%24

FuelCell Energy Products & announcements (39/119 active+recent)

Product announcements of FuelCell Energy from the reports: market launches, approvals, partnerships, with first mention and source; discontinued products are shown in grey. NadirAlpha methodology

Status: PlannedLaunchedStable

FuelCell Energy: product announcements from the filings, 116 entries. Compiled by NadirAlpha from SEC filings.
Product/LineSinceStatusSource
2027
UConn Project commercial operations expected2027-1230
UConn Project - 1.125 MW molten carbonate fuel cell system2027-1228
UConn 1.125 MW Project2027-1226
Hartford Project - 7.4 MW fuel cell system2027-1228
Hart Project commercial operations expected2027-1230
Groton Project Equipment Upgrade - SureSource 4000 to standard 2.5 MW power blocks2027-1228
Hartford 7.4 MW Project2027-0926
Groton Project equipment upgrade202730
2026
Phase 0 of CEPA with Fit Energy - 30 MW generating capacity2026-1230
Phase 0 delivery to Fit Energy (30 MW)2026-1231
Hartford Project 7.4 MW carbonate fuel cell system2026-1220
Achievement of 100 MW annualized production rate2026-1031
Solid oxide electrolysis platform demonstration2026-0930
Gyeonggi Green Energy fuel cell park repowering completion2026-0931
Torrington facility expansion to 500 MW (4x)2026-0631
Standardized 12.5 MW FuelCell Energy Block2026-0629
Solid Oxide Electrolysis Platform Demonstration at INL2026-0326
Gyeonggi Green Energy 58.8 MW fuel cell power plant platform commissioning202622
Generation 2 Technology fuel cell module commercialization202617
Esso Rotterdam refinery pilot carbon capture project202624
2025
Remaining 16 1.4-MW replacement fuel cell modules for GGE Agreement expected to be commissioned in FY2026 (2x)2025-0621
7.4 MW fuel cell power plant in Hartford, CT2025-0621
Korea repowering project module replacements2025-0421
Solid oxide electrolysis cell demonstration unit delivered to U.S. Department of Energy Idaho National Laboratory2025-0319
7.4 MW Hartford, CT fuel cell power plant2025-0319
Eversource/United Illuminating Hartford 7.4 MW fuel cell power plant2025-0122
University of Connecticut four 250 kW solid oxide systems202513
University of Connecticut 1 MW Solid Oxide Fuel Cell202511
Trinity College solid oxide fuel cell project202513
Toyota Motor North America Tri-gen system hydrogen generation project202524
Solid oxide electrolyzer demonstration at Idaho National Laboratory202515
Solid oxide electrolysis system demonstration at Idaho National Laboratory202520
Solid oxide electrolysis pilot program - 150 kg/day system at Idaho National Laboratory202517
Solid oxide electrolysis field demonstration at Idaho National Laboratory202524
Malaysia Marine and Heavy Engineering collaboration for low-carbon fuel production facility202524
Idaho National Laboratory Electrolysis Platform202513
Calgary manufacturing capacity expansion202513
2024
Trinity College 250 kW Solid Oxide Fuel Cell2024-0711
2023
ExxonMobil Carbon Capture Demonstration (3x)2023-0631
2024
Trinity College 250 kW Solid Oxide Fuel Cell Power Generation System2024-129
Carbon capture technology demonstration at Port of Rotterdam2024-1215
Solid oxide fuel cell platform development2024-0914
Rotterdam project supplies via Esso Nederland B.V.2024-0914
Electrolysis platform development2024-0914
Calgary Solid Oxide Manufacturing Expansion2024-063
University of Connecticut SOFC installation2024-0310
UConn 1 MW solid oxide fuel cell power generation projects modification2024-0322
U.S. Department of State solid oxide electrolysis project in Ukraine2024-0310
Toyota and Derby generation projects2024-0316
Toyota Project commercial operation2024-0318
Toyota Project2024-0313
Toyota Long Beach Project2024-0317
Solid oxide electrolysis platform delivery to Idaho National Laboratory2024-038
SCEF Derby 2.8 MW Project2024-0317
Groton Project reached design rated output of 7.4 MW2024-0317
Groton Project rated capacity achievement2024-0313
University of Connecticut (UConn) 1 MW SOFC Project (four 250 kW units)202417
Trinity College solid oxide fuel cell system installation20247
Trinity College 250 kW SOFC Project202417
Solid oxide manufacturing capacity expansion to 40 MW in Calgary20247
Idaho National Laboratory Solid Oxide Electrolysis Platform20249
Derby, Connecticut projects202410
Delivery of distributed power platform to Trinity College20247
Delivery of SOEC electrolysis platform to Idaho National Laboratory20247
Completion and delivery of other two SOEC production units20247
Calgary facility solid oxide production capacity expansion20247
Additional on-site fuel cell demonstration and test unit construction in Torrington20247
2023
Rotterdam Pilot Plant Project2023-127
INL electrolysis platform delivery2023-125
Groton Project Technical Improvement Plan2023-1211
ExxonMobil pilot plant for carbon capture in Rotterdam2023-128
Derby, Connecticut fuel cell park (14.0 MW)2023-128
Derby, Connecticut 2.8 MW fuel cell project2023-128
Derby Projects commercial operation2023-1218
Derby Fuel Cell Projects (14.0 MW and 2.8 MW)2023-1213
Derby Connecticut 2.8 MW Project2023-126
Derby Connecticut 14.0 MW Project2023-126
Derby Connecticut 14 MW Project2023-124
Derby CT 2.8 MW Project2023-123
Derby CT 14.0 MW Project2023-1217
Derby 2.8 MW SCEF project commissioning2023-127
Derby 2.8 MW SCEF Fuel Cell Project2023-129
Derby 14.0 MW project placement in service2023-127
Derby 14.0 MW Fuel Cell Project2023-1219
Derby 14 MW project with United Illuminating2023-122
2.8 MW carbonate power generation project (California municipality)2023-128
2.8 MW SCEF Fuel Cell Project2023-1219
1 MW solid oxide power generation project (Northeast U.S. university)2023-128
Toyota Project BioMAT program placement2023-117
Long Beach Tri-gen platform for Toyota2023-118
Toyota Project Port of Long Beach2023-103
Technology Demonstration - Carbon Capture Test Completion2023-107
U.S. solid oxide manufacturing facility expansion2023-095
Toyota Tri-generation Platform at Port of Long Beach2023-072
Toyota Project Commissioning2023-071
Toyota Long Beach Tri-gen Project2023-076
Noeul Green Energy 14-year Service Agreement2023-0713
United States Solid Oxide Manufacturing Facility2023-063
Third Amendment to Connecticut Assistance Agreement2023-053
Third Amended and Restated 2018 Omnibus Incentive Plan2023-053
Amended and Restated Employee Stock Purchase Plan2023-053
U.S. Navy Submarine Base Groton Project2023-032
Trinity College Distributed Power Platform Delivery2023-035
Derby Project Commercial Operations2023-031
Trinity College Hartford Solid Oxide Power Platform20234
Trinity College Hartford Distributed Power Platform Delivery20233
Pilot program award for 150 kg/day solid oxide electrolysis system at Idaho National Laboratory20237
Idaho National Laboratory Solid Oxide Electrolysis Unit20234
Idaho National Laboratory Electrolysis Platform Delivery20233
Groton Project20233
Electrolysis platform delivery to Idaho National Laboratory20232
Distributed power platform delivery to Trinity College Hartford20232
Calgary capacity expansion - four units construction and delivery20235
250 kW Power Generation Platform (2×)20237
1 MW High-Efficiency Electrolysis Platform (4×)20237
2022
Groton Project Commercial Operations2022-127

FuelCell Energy Transactions & Events (45)

45 transactions and events of FuelCell Energy from the original reports, financing measures and management changes are not listed here, cancelled items in grey. NadirAlpha methodology

Acquisitions · 19Partnerships/contracts · 22Divestitures/exits · 3older: 1 (in the table)
202420252026

Acquisitions by FuelCell Energy

FuelCell Energy: Acquisitions, 19 entries. Compiled by NadirAlpha from SEC filings.
Transaction / stakeDateTypeSource
2025
2026 EXIM Financing (2×)2025-11Completed30
2025 EXIM Financing with Export-Import Bank (3×)2025-11Completed25
2024
Gyeonggi Green Energy Co., Ltd. Hwaseong Balan Industrial Complex repowering project2024-09Completed14
Ameresco Sacramento, CA fuel cell and biogas project2024-06Completed14
Ameresco Sacramento Sewer District 2.8 MW project (4×)2024-06Completed22
GGE LTSA Module Deliveries and Commissioning (7×)2024-05Completed20
ExxonMobil Technology and Engineering Company carbon capture joint development (2×)2024-04Completed19
Amended Open Market Sale Agreement with Jefferies and other agents2024-04Announced11
Esso purchase order (2×)2024-03Completed10
EMTEC Rotterdam project2024Completed16
2023
Open Market Share Sale Agreement (2×)2023-12Announced25
Franklin Park tax equity financing for Derby Projects (2×)2023-10Completed8
Groton Back Leverage Senior and Subordinated Loans (3×)2023-08Completed7
Derby Back Leverage Financing (2×)2023-08Completed30
OpCo Financing Facility (3×)2023-05Completed30
$87 million Non-Recourse Project Financing Facility2023-05Completed4
Planned 400 MW U.S. Solid Oxide Manufacturing Facility2023-03Completed1
Calgary Facility Phase 1 Completion - 40 MW Annual Solid Oxide Production Capacity2023-03Completed1
Versa Ltd. Calgary Facility Expansion2023-02Completed1

Divestitures and exits by FuelCell Energy

FuelCell Energy: Divestitures / exits, 3 entries. Compiled by NadirAlpha from SEC filings.
Transaction / stakeDateTypeSource
2025
Trinity College 250 kW solid oxide fuel cell project termination2025-05Divested20
Trinity College 250 kW solid oxide fuel cell power generation project termination2025-05Divested22
2024
Solid oxide platform development discontinuation; focus shift to electrolysis technology demonstration2024-11Divested24

Partnerships and contracts of FuelCell Energy

FuelCell Energy: Partnerships & contracts, 23 entries. Compiled by NadirAlpha from SEC filings.
Transaction / stakeDateTypeSource
2026
Siemens MOU for electrical balance of plant systems2026-09Agreement31
Data Center Capacity Reservation Agreement with major operator2026-09Agreement31
Fit Energy Capital Equipment Purchase Agreement (2x)2026-06Agreement31
Collaboration with Sustainable Development Capital LLP (SDCL)2026-03Agreement27
2025
UConn Project PPA amendment for 1.125 MW system2025-12Agreement30
CGN-Yulchon Generation Co., Ltd. long-term service agreement (3×)2025-07Agreement25
Termination of PPA with Trinity College for 250 kW solid oxide fuel cell project2025-05Agreement24
Joint Development Agreement with Malaysia Marine and Heavy Engineering Sdn Bhd (2×)2025-03Agreement18
Diversified Energy Co. PLC and TESIAC data center partnership (3×)2025-03Agreement18
Power Purchase Agreement with Eversource and United Illuminating for Hartford Project (7.4 MW, Hartford Connecticut)2025-01Agreement24
Hartford Project PPA execution with Eversource and United Illuminating2025-01Agreement30
Hartford Project 7.4 MW PPA2025-01Agreement18
Power purchase agreement with Eversource and United Illuminating for Hartford Project2025Agreement23
Eversource and United Illuminating 20-year power purchase agreement for 7.4 MW Hartford, Connecticut fuel cell plant2025Agreement25
2024
Gyeonggi Green Energy Co., Ltd. - Module Replacement Agreement2024-09Agreement16
Agreement to supply Gyeonggi Green Energy Co., Ltd. with 42 upgraded fuel cell modules and long-term operations and maintenance services2024-05Agreement12
Agreement with Ameresco, Inc. for Sacramento Sewer district energy delivery platform2024-04Agreement12
Long-Term Service Agreement with Gyeonggi Green Energy for GGE Hwaseong Baran facility replacement (22 fuel cell modules)2024Agreement24
2023
EMTEC Joint Development Agreement (8×)2023-08Agreement7
Chart Industries Memorandum of Understanding for Carbon Capture and Hydrogen Solutions2023-06Agreement4
Collaboration agreement with Malaysia Marine and Heavy Engineering on large-scale electrolyzer facilities2023-03Agreement2
Gyeonggi Green Energy Long-Term Service Agreement (5x)2023Agreement17
2019
EMTEC License Agreement2019-06Agreement7

FuelCell Energy Risks (154 since the annual report of 2025-12-18, 377 tracked in total)

Which risks FuelCell Energy has named since the annual report, company-specific first, generic standard risks in the expandable part; first mention refers to the document base from 2023. NadirAlpha methodology

Category: FinancialCustomersTechnologyGeopoliticsRegulatoryStrategyPeopleSupply chainMacroLegalMarketCompetitionESG

FuelCell Energy: risk factors as reported, 154 since the last annual report, 377 tracked. Compiled by NadirAlpha from SEC filings.
RiskCategoryLast reported
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2026-09-02 (2026-Q3), source 31
Product costs exceed CEPA pricing at current production volumes of 37.1 MW.=
Awarded Capacity Backlog of $2.4 billion may not convert to Committed Backlog or revenue.=
Ability to reduce levelized cost of energy to competitive levels uncertain.=
FuelCell Energy: first mention in 10-Q quarterly report of 2026-09-02 (2026-Q3), source 30
Multiple EXIM Financings require minimum cash balance of $65.0 million with potential reduction to $15.0 million upon satisfying debt service coverage and debt-to-EBITDA ratios=
Company failed to meet employment obligation under Connecticut loan, subject to $14,225 penalty per position shortfall=
Company must service long-term debt obligations; ability to generate positive cash flow impacts debt servicing.=
Groton Project extended down-time resulted in lack of operating revenue and potential covenant defaults under back leverage financing=
Company markets products internationally in EU, UK, South Korea, Singapore, Malaysia and Thailand; exposure to international risks.=
Company has not paid federal or state income taxes for several years due to net operating losses; uncertain tax matters.=
Solid oxide electrolysis platform commercialization timeline uncertain; dependent on partners for deployment=
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2026-06-08 (2026-Q2), source 29
Company must successfully expand Torrington facility to 500 MW by June 2028 to meet customer demands.2026-Q3
2026-09-02 31
FuelCell Energy: first mention in 10-K annual report of 2025-12-18 (FY2025), source 24
Restructuring actions in November 2024 and June 2025 resulted in workforce reductions affecting operations.2026-Q3
2026-09-02 30
Risk that commercialization of carbon capture and solid oxide platforms will not occur when anticipated.2026-Q3
2026-09-02 30
Government and third parties may terminate development contracts at any time.2026-Q3
2026-09-02 31
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2024-09-05 (2024-Q3), source 14
Rapid technological change and competition in fuel cell and clean energy markets.2026-Q3
2026-09-02 31
FuelCell Energy: first mention in 10-Q quarterly report of 2024-06-10 (2024-Q2), source 11
Unable to secure fuel on favorable terms may result in impairment charges to project assets2026-Q3
2026-09-02 30
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2024-03-07 (2024-Q1), source 10
Company must comply with utility regulatory environment and changing laws; risk of non-compliance with Nasdaq listing rules.2026-Q3
2026-09-02 30
FuelCell Energy: first mention in 10-K annual report of 2023-12-19 (FY2023), source 7
Company requires substantial outside financing for projects; risk financing not available on acceptable terms if and when needed.2026-Q3
2026-09-02 30
Four projects expose company to fluctuating fuel price risks and inability to procure required fuel amounts.2026-Q3
2026-09-02 30
International deployments subject to foreign regulatory and geopolitical risks.2026-Q3
2026-09-02 31
Government can terminate development contracts at any time and exercise march-in rights on certain patents.2026-Q3
2026-09-02 30
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2023-09-11 (2023-Q3), source 6
Company has history of net losses; ability to generate positive cash flow remains unproven.2026-Q3
2026-09-02 31
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2023-06-08 (2023-Q2), source 4
General economic conditions and changes in interest rates may impact project financing and market demand.2026-Q3
2026-09-02 30
Supply chain disruptions could impact fuel cell production and delivery schedules.2026-Q3
2026-09-02 31
FuelCell Energy: first mention in 10-Q quarterly report of 2023-06-08 (2023-Q2), source 3
Fit Energy represents significant portion of backlog through 380 MW CEPA with four potential phases and options.2026-Q3
2026-09-02 31
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2023-03-09 (2023-Q1), source 2
Potential volatility of commodity prices may adversely affect fuel cell projects, particularly for projects with fuel sourcing risk.2026-Q3
2026-09-02 30
Company subject to various lawsuits and legal proceedings; forward-looking statements involve risks related to litigation.2026-Q3
2026-09-02 30
Risk that new products will not be commercialized as anticipated or with adequate capacity to satisfy demand.2026-Q3
2026-09-02 30
Availability of government subsidies and economic incentives for alternative energy technologies may change.2026-Q3
2026-09-02 31
FuelCell Energy: first mention in 10-Q quarterly report of 2023-03-09 (2023-Q1), source 1
Company has not achieved profitable operations or sustained positive cash flow from operations.2026-Q3
2026-09-02 30
Risk that new carbon capture technology will not perform as expected in industrial applications.2026-Q3
2026-09-02 31
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2026-06-08 (2026-Q2), source 29
Company may not complete construction of projects covered by PPAs, forgoing revenue and incurring penalties=
FuelCell Energy: first mention in 10-Q quarterly report of 2026-06-08 (2026-Q2), source 28
Company failed to meet State of Connecticut employment obligation, resulting in $2.1 million penalty assessed against loan balance.=
$1/MMBtu increase in natural gas pricing would result in approximately $26,000 annual cost impact; $10/MMBtu increase in renewable natural gas would impact approximately $2.0 million annually.=
Risk that commercialization of new products will not occur as anticipated or capacity will be insufficient=
$67.7 million restricted cash primarily reserved for lease obligations, debt service, and operational reserves.=
Government contracts can be terminated at any time by government agencies=
Litigation and other proceedings could adversely affect business operations=
Risk that government may exercise march-in rights with respect to certain patents=
Advanced Technologies contracts dependent on year-by-year congressional authorization of incremental funding.=
Risk that newly developed products will not be commercially successful=
FuelCell Energy: first mention in 10-Q quarterly report of 2026-03-09 (2026-Q1), source 26
Covenants require 1.20:1.00 minimum debt service coverage ratio.=
Company may be unable to obtain financing for project construction and deployment on acceptable terms; lack of financing could materially impact operations=
$67.8M restricted cash pledged limits liquidity availability.=
Prior workforce reductions of approximately 39% in aggregate and potential for additional reductions; restructuring actions may result in unanticipated costs and workforce impacts=
PPA customer default risk including CMEEC for Groton Project.=
Company has four projects with fuel sourcing risk lacking pass-through mechanisms; inability to secure fuel on favorable terms may result in impairment charges=
Fuel supply contracts expire requiring renegotiation Toyota 2026, Derby 2029, Yaphank 2028.=
Commercialization of solid oxide platforms dependent on partnership development and market acceptance; solid oxide electrolysis demonstration ongoing at Idaho National Laboratory=
Exposure to interest rate movements on Term Loan and Back Leverage Loans.=
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2025-12-18 (FY2025), source 25
Economic downturns may reduce demand for power generation and capital projects=
FuelCell Energy: first mention in 10-K annual report of 2025-12-18 (FY2025), source 24
Will need to raise additional capital; may dilute existing stockholders if equity issued=
Equity capital raises may dilute existing stockholders=
Impairment of goodwill and in-process research and development assets identified July 2025.=
Company has not been profitable since October 31, 1997; expects continued net losses=
Series B Preferred Stock ranks senior to common stock; liquidation preference of $1,000 per share plus accumulated dividends=
Series B Preferred Stock holders entitled to $50 per share cumulative annual dividends=
Expected project costs for Trinity College and UConn PPAs exceeded expected cash flows; Trinity PPA terminated May 2025=
Project awards may not convert to contracts; cancelable or revocable prior to contract execution=
Long-term service contracts up to 20 years subject to warranty and performance risks=
Maximum annualized capacity 100 MW under current Torrington facility configuration=
Company unable to secure fuel on favorable terms could result in impairment charges to Derby and Yaphank project assets=
Weakness in customer economy could negatively impact sales=
U.S. government has march-in rights relating to certain patents=
Licensed carbonate technology to POSCO Energy non-exclusively for module replacement only=
As of October 31, 2025: 152 U.S. patents and 319 international patents for fuel cell technology=
Extended product warranties for complex products could result in claims=
Delaware Court forum provision could limit stockholders' dispute options=
Environmental and governmental regulation may impact operations=
Product exports subject to various export control regulations and licensing=
Federal ITC ineligibility after December 31, 2024 for natural gas fuel cells except safe harbored projects=
OBBBA enacted July 4, 2025 restored 30% federal ITC for fuel cell projects beginning construction after December 31, 2025=
Unanticipated increases or decreases in business growth may harm financial condition=
Slower-than-expected market investments in clean energy resulted in restructuring, deferral and cancellation of capital expenditures=
Success depends on implementing capacity expansion for carbonate products and solid oxide commercialization partnerships=
Timeline for solid oxide electrolysis market entry subject to external conditions=
Implemented 22% workforce reduction (122 employees) on June 5, 2025=
Solid oxide electrolysis commercialization paced by market adoption and third-party partnerships=
Signed contracts subject to contractual, technology, operating and commodity risks=
Currency translation and transaction risk from operations in local currencies of foreign countries=
U.S.-China tariff measures, Russia-Ukraine war, and sanctions impact global economy=
Financial market volatility affects debt, equity, and project finance markets availability=
New products and technologies may not be commercially successful=
Interest rate swap derivative remeasured quarterly with resulting losses to other income/expense.=
Uncertain regulatory environment in emerging markets, particularly currency policy affecting exchange rate exposure=
Ability to meet sales plans and production rate increases not assured=
Information technology security threats increasing in frequency and sophistication=
FuelCell Energy: first mention in 10-Q quarterly report of 2025-09-09 (2025-Q3), source 22
Connecticut loan penalty $2.1M if 538 FT position minimum not maintained.2026-Q1
2026-03-09 26
Government and third parties retain ability to terminate development contracts at any time=
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2025-06-06 (2025-Q2), source 21
Global restructuring in November 2024 and June 2025; ceased solid oxide power generation developmentFY2025
2025-12-18 24
FuelCell Energy: first mention in 10-Q quarterly report of 2025-06-06 (2025-Q2), source 20
Workforce reduction may increase employment litigation risk and employee attrition to competitors.2025-Q3
2025-09-09 22
Eliminated employees may seek employment with competitors; confidentiality agreements may not ensure proprietary information protection.=
Approximately 1% of cash and cash equivalents in non-USD currencies; no significant foreign exchange losses to date.2026-Q2
2026-06-08 28
1% change in interest rates would not have material impact on results based on overall exposure as of April 30, 2026.2026-Q2
2026-06-08 28
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2025-03-11 (2025-Q1), source 19
Need for and availability of additional financing for operations and expansion2026-Q2
2026-06-08 29
FuelCell Energy: first mention in 10-Q quarterly report of 2025-03-11 (2025-Q1), source 18
Multiple credit agreements contain debt service coverage ratio covenants and default triggers including change of control events.2026-Q2
2026-06-08 28
Change of Control trigger on Derby and Groton financing could cause immediate acceleration of debt.2025-Q3
2025-09-09 22
Trinity College and UConn projects deferred; no assurance schedule changes can be mutually agreed, may result in termination=
Changes in utility regulatory environment may adversely affect operations2026-Q2
2026-06-08 29
Risk that new product commercialization will not occur when anticipated or with adequate capacityFY2025
2025-12-18 25
FuelCell Energy: first mention in 10-K annual report of 2024-12-27 (FY2024), source 17
Intangible assets and long-lived assets may become impaired requiring chargesFY2025
2025-12-18 24
U.S. government has march-in rights for patents developed under government-funded researchFY2025
2025-12-18 24
Received written notice during FY2024 of non-compliance with Nasdaq continued listing standardsFY2025
2025-12-18 24
Products lack maturity; warranty claims and module replacement costs may exceed estimatesFY2025
2025-12-18 24
Approximately 1% of cash in non-USD currencies with no repatriation plans.FY2025
2025-12-18 24
Change in interest rates of 1% would not materially impact results of operations.FY2025
2025-12-18 24
Russia-Ukraine crisis, tariffs, and geopolitical events could negatively affect U.S./international commerce and supply chainsFY2025
2025-12-18 24
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2024-11-15 (2024-Q4), source 15
Cost reduction strategy for manufacturing may not succeed or be delayedFY2025
2025-12-18 24
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2024-06-10 (2024-Q2), source 12
Risk of inability to protect intellectual property2026-Q2
2026-06-08 29
Ability to remain in compliance with U.S. federal, state and foreign laws and regulationsFY2025
2025-12-18 25
FuelCell Energy: first mention in 10-Q quarterly report of 2024-06-10 (2024-Q2), source 11
Risk that bid awards will not convert to contracts, contracts will not convert to revenue, or commercialization will not occur when anticipated2026-Q1
2026-03-09 26
Future liquidity dependent on completing projects on budget, generation portfolio cash flows, project financing, revenue growthFY2025
2025-12-18 24
Litigation and other legal proceedings2025-Q1
2025-03-11 19
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2024-03-07 (2024-Q1), source 10
Company dependent on additional financing; ability to generate positive cash flow uncertainFY2025
2025-12-18 25
Risk of inability to service long-term debt obligations2026-Q2
2026-06-08 29
FuelCell Energy: first mention in 10-K annual report of 2023-12-19 (FY2023), source 7
Company has not achieved profitable operations or sustained positive cash flow from operations2026-Q2
2026-06-08 28
Failure to meet ESG expectations could adversely affect stock price and operationsFY2025
2025-12-18 24
Manufacturing cost reduction strategy dependent on economies of scale and process improvementsFY2025
2025-12-18 24
Total consolidated debt and finance obligations of $122.9 million as of October 31, 2025FY2025
2025-12-18 24
Recorded $65.8 million, $1.3 million, $2.4 million impairment charges FY2025, 2024, 2023FY2025
2025-12-18 24
Prior fiscal year material weakness in internal control over financial reporting (remediated)FY2025
2025-12-18 24
Utility companies may resist distributed generation adoption and impose feesFY2025
2025-12-18 24
Depends on third party suppliers for key raw materials and componentsFY2025
2025-12-18 24
Increase in energy costs may materially adversely affect businessFY2025
2025-12-18 24
Granted EMTEC non-exclusive, perpetual license for carbon capture and hydrogen applicationsFY2025
2025-12-18 24
Delaware law and certificate provisions may make takeover more difficultFY2025
2025-12-18 24
Subject to federal, state, local laws on emissions, hazardous substances, and carbon dioxideFY2025
2025-12-18 24
Exports subject to various export control regulations; requires license from U.S. State or Energy departmentsFY2025
2025-12-18 24
Subject to Defense Contract Audit Agency audits; improper cost allocation results in non-reimbursementFY2025
2025-12-18 24
Products use flammable fuels, operate at high temperatures, use corrosive carbonate materialFY2025
2025-12-18 24
Government ability to exercise march-in rights with respect to certain patents2026-Q2
2026-06-08 29
Potential volatility of commodity prices may adversely affect projects and operational profitability2026-Q1
2026-03-09 26
Government and third parties have ability to terminate development contracts at any time; government may exercise march-in rights on certain patents2026-Q1
2026-03-09 26
Ability to protect intellectual property and litigation risks2026-Q1
2026-03-09 27
Ability to successfully market and sell products internationally subject to risksFY2025
2025-12-18 25
Stock price subject to extreme price and volume fluctuations from various market factorsFY2025
2025-12-18 24
Future success depends on attracting and retaining qualified management, technical and operating personnelFY2025
2025-12-18 24
FuelCell Energy: first mention in 10-Q quarterly report of 2023-09-11 (2023-Q3), source 5
Need for additional capital may not be available on acceptable termsFY2025
2025-12-18 24
Company has not achieved profitable operations or sustained positive cash flow from operations to dateFY2025
2025-12-18 24
Ability of government and third parties to terminate development contracts at any time2025-Q1
2025-03-11 19
Risk that commercialization of new products will not occur as anticipated2026-Q2
2026-06-08 29
Risk of market acceptance of products and services2026-Q2
2026-06-08 28
Rapid technological change and increased competition in fuel cell sector2026-Q2
2026-06-08 29
Government retains ability to exercise march-in rights with respect to certain company patents2025-Q3
2025-09-09 22
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2023-06-08 (2023-Q2), source 4
Rapid technological change and increased competition in fuel cell and clean energy markets2026-Q2
2026-06-08 28
FuelCell Energy: first mention in 10-Q quarterly report of 2023-06-08 (2023-Q2), source 3
Company requires substantial outside financing and has not achieved profitable operations or sustained positive cash flow; future liquidity depends on multiple factors including project completion and market access2026-Q1
2026-03-09 26
Unable to secure fuel on favorable economic terms may result in impairment charges.FY2025
2025-12-18 24
Not currently engaged in material intellectual property litigationFY2025
2025-12-18 24
FuelCell Energy: first mention in 8-K-EX99.1 earnings release of 2023-03-09 (2023-Q1), source 2
General risks associated with product development and manufacturing; supply chain disruptions could impact operations2026-Q1
2026-03-09 26
Changes in utility regulatory environment and industry structure could impact market demand for distributed generation2026-Q1
2026-03-09 26
Rapid technological change and competition present risks to market position and product competitiveness2026-Q1
2026-03-09 26
Changes in interest rates may impact project financing and financial resultsFY2025
2025-12-18 24
FuelCell Energy: first mention in 10-Q quarterly report of 2023-03-09 (2023-Q1), source 1
Substantial outside financing arrangements required; failure to obtain acceptable financing terms could materially affect operationsFY2025
2025-12-18 24
Four projects exposed to natural gas sourcing risk without pass-through mechanisms.FY2025
2025-12-18 24
= last mention identical with the first mention (same source)

FuelCell Energy Reported KPIs (as disclosed) (717)

Figures FuelCell Energy discloses itself in addition to the standard financials, such as order intake, recurring revenue or unit counts, as reported and with no calculation of our own. NadirAlpha methodology

Company-specific KPIs verbatim from the filings (English, as disclosed; not normalised). Balance-sheet and boilerplate items filtered.
FuelCell Energy: reported KPIs as disclosed, 717 entries. Compiled by NadirAlpha from SEC filings.
KPIValue / changeSource
FuelCell Energy, published 2026-09-02, period 2026-Q3
Unrestricted cash and cash equivalents658.1 million30
Total project assets166.6 million30
Other income, net0.7 million30
Other income, net1.8 million30
Net loss per common share0.6430
Net loss per common share3.7830
Net loss per common share2.5630
Net loss per common share7.2230
Net debt outstanding related to project assets97.5 million30
Interest income3.6 million30
Interest income8.6 million30
Interest expense2.9 million30
Interest expense8.5 million30
generation portfolio MW62.8 MW30
committed service agreements backlog263.6 million30
committed product backlog108.9 million30
committed generation backlog915.7 million30
committed advanced technologies contract backlog7.8 million30
awarded capacity service agreements backlog1.3 billion30
annualized production rate37.1 MW30
annualized production rate33.2 MW30
annualized production rate35.4 MW30
annualized production rate30.5 MW30
unrestricted cash and cash equivalents658.1 million30
unrestricted cash and cash equivalents$658.1 million31
Torrington facility expansion target500 MW31
sales pipeline10 gigawatts31
restricted cash and cash equivalents79.2 million30
restricted cash and cash equivalents$79.2 million31
pledged cash and cash equivalents for performance security79.2 million30
outstanding letters of credit12.7 million30
generation portfolio62.8 MW30
company-funded R&D expenses incurred23.2 million30
committed backlog$1.3 billion31
committed advanced technologies contract backlog7.8 million30
Cash, cash equivalents, restricted cash and restricted cash equivalents$737.3 million31
Cash and cash equivalents and restricted cash737.3 million30
Awarded Capacity Backlog$2.4 billion31
Annualized production rate100 MW31
FuelCell Energy, published 2026-06-08, period 2026-Q2
US government funded backlog$4.9 million28
Restricted cash$67.7 million28
Non-US government funded backlog$10.5 million28
Letters of credit outstanding$12.7 million28
Generation portfolio62.8 MW28
Advanced technologies contract backlog$15.4 million28
unrestricted cash and cash equivalents373.2 million28
Total project assets167.5 million28
Total backlog1.14 billion28
Torrington facility current maximum capacity100 MW per year28
Service agreements backlog155.4 million28
sales pipeline4 gigawatts29
restricted cash and cash equivalents67.7 million28
Projects in development assets1.1 million28
Projects in development8.5 MW28
Product backlog36.1 million28
Pledged cash collateral67.7 million28
Non-current restricted cash51.1 million28
Net debt outstanding related to project assets99.8 million28
Hub and spoke model target capacity1.5 to 2.0 GW28
Generation portfolio capacity62.8 MW28
Generation backlog928.5 million28
Current restricted cash16.6 million28
Completed, operating installations166.4 million28
Cash and cash equivalentsapproximately $441 million29
Backlog$1.14 billion29
Annualized production rate36.4 MW28
Annualized production rate34.5 MW28
Advanced Technologies contract backlog15.4 million28
FuelCell Energy, published 2026-03-09, period 2026-Q1
U.S. government funded backlog$5.1 million26
Total project assets211,00026
Total backlog1,171,20026
Service agreements backlog159,40026
Restricted cash pledged$67.8 million26
Restricted cash OpCo obligations$25.3 million26
Restricted cash Groton senior obligations$12.8 million26
Restricted cash Derby obligations$3.0 million26
Restricted cash Crestmark obligations$2.9 million26
Restricted cash and cash equivalents67,80026
Product backlog54,10026
Outstanding Letters of Credit$12.7 million26
Operating Power Plants Capacity62.8 MW26
Non-U.S. Government Funded Backlog$13.1 million26
Net Debt Related to Project Assets102,70026
Gross Margin Service Agreements11.5%26
Gross Margin Product-36.1%26
Gross Margin Generation-28.2%26
Gross Margin Advanced Technologies28.6%26
Generation Operating Portfolio62.8 MW26
Generation Backlog939,50026
Finance Obligation Balance$18.8 million26
Depreciation of Project Assets and Generation Intangible8,70026
D&A10,50026
Cash and Cash Equivalents Pledged as Collateral67,80026
Annualized Production Rate32.6 MW26
Advanced technologies contract backlog18,20026
Restricted Cash and Cash Equivalents Short-Term$17,67527
Restricted Cash and Cash Equivalents Long-Term$50,14727
Cash and Cash Equivalents Unrestricted$311,77827
Backlog Service$159,39327
Backlog Product$54,11327
Backlog Generation$939,52527
Backlog Advanced Technologies$18,21027
Backlog$1,171,24127
FuelCell Energy, published 2025-12-18, period FY2025
Versa US Patents1924
Versa Pending US Applications1324
Versa Pending International Applications2424
Versa International Patents6324
US Patents15224
Unrestricted Cash and Equivalents278.124
Total backlog1.1924
Torrington Facility Maximum Capacity100 MW24
Torrington Facility Estimated Capacity with Investments350 MW24
Torrington Facility Annualized Production Rate41 MW24
System Target Design Life25-30 years24
South Korea Clean Hydrogen Portfolio Standard Hydrogen Share7.1%24
South Korea Clean Hydrogen Portfolio Standard Hydrogen Share2.1%24
Solid Oxide Electrolysis System Efficiency40-45 kWh/kg24
Solid Oxide Electrolysis Stack Efficiency34 kWh/kg24
Service agreements backlog162.424
Section 45Q Carbon Capture Credit$8524
Safety Experience Modification Rate0.8424
Safety Experience Modification Rate0.8324
Safety Experience Modification Rate0.8924
safety experience modification rate0.08824
safety experience modification rate0.6824
safety experience modification rate0.5924
safety experience modification rate0.6524
Product backlog66.224
power plant recyclable percentage93%24
power density33 MW24
pending US patent applications2924
pending international patent applications7924
net debt from project assets106.124
manufacturing facility size Torrington167,00024
loss accruals service agreements8.4 million24
joint development agreement expected annual budget$10.0 million24
ITA throughput at least$10.0 million24
investment tax credit rate30%24
international patents31924
hydrogen purity99.85%24
government funding percentage2%24
government funding percentage4%24
government funding percentage3%24
Generation Operating Portfolio62.824
Generation Backlog945.224
FuelCell Energy Solutions licensed US patents224
FuelCell Energy Solutions licensed international patents724
fuel cell modules target design life5-7 years24
European facility capacity20 MW24
Esso purchase order value$11.6 million24
Emtec license agreement payment$10 million24
data center electricity demand projection945 terawatt-hours24
CHP system efficiency80%24
carbonate fuel cell electrical efficiency50%24
carbonate fuel cell average efficiency47%24
carbon capture NOx reduction70%24
annualized production rate MW31.524
Advanced technologies contract backlog19.524
unrestricted cash and cash equivalents$278.1 million25
Total cash, restricted cash and short-term investments$341.8 million25
Backlog$1.19 billion25
3TG minerals percentage0.001207%24
FuelCell Energy, published 2025-09-09, period 2025-Q3
sale leaseback finance obligations outstanding balance18.8 million22
sale leaseback finance obligations imputed interest11.6 million22
Restricted cash pledged62.2 million22
restricted cash OpCo Financing20.9 million22
restricted cash Groton Senior Back Leverage14.0 million22
restricted cash Derby Back Leverage1.8 million22
restricted cash Crestmark sale leaseback2.9 million22
natural gas gains1.0 million22
natural gas gains2.0 million22
Letters of credit outstanding14.2 million22
letters of credit expire throughOctober 202922
interest rate swap fixed rate3.716%22
Generation Operating Portfolio62.8 MW22
fuel price sensitivity renewable natural gas2.0 million22
fuel price sensitivity natural gas26,00022
Total project assets224.522
Total backlog1.2422
Total Cash, Restricted Cash and Short-Term Investments$236.9 million23
Service agreements backlog169.422
Service Agreements Backlog$169.4 million23
restricted cash and cash equivalents62.222
Restricted Cash and Cash Equivalents - Short-term16,09223
Restricted Cash and Cash Equivalents - Long-term46,10023
Projects in development7.422
Product backlog96.222
Product Backlog$96.2 million23
Pledged cash and cash equivalents (performance security)62.222
Outstanding finance obligations under sale-leaseback18.822
Operating portfolio capacity (MW)62.822
OpCo Financing swap fixed rate3.716%22
OpCo Financing net interest rate thereafter6.866%22
OpCo Financing net interest rate first four years6.366%22
OpCo Financing letter of credit issued6.5 million22
OpCo Financing hedge notional minimum75%22
OpCo Financing hedge notional maximum105%22
OpCo Financing fair value adjustment0.6 million22
OpCo Financing fair value adjustment-0.2 million22
OpCo Financing debt service reserve minimumsix months22
OpCo Financing capital expenditures reserve total29.0 million22
OpCo Financing capital expenditures reserve funded at closing14.5 million22
OpCo Financing Term Loan maturityMay 19, 203022
OpCo Financing Term Loan drawn80.5 million22
OpCo Financing Term Loan Facility amount80.5 million22
OpCo Financing LC Facility amount6.5 million22
OpCo Financing DSCR requirement1.20:1.0022
OpCo Financing Applicable Margin SOFR thereafter3%22
OpCo Financing Applicable Margin SOFR first four years2.5%22
OpCo Financing Applicable Margin Base Rate thereafter2%22
OpCo Financing Applicable Margin Base Rate first four years1.5%22
Net debt outstanding related to project assets109.022
Groton Total DSCR requirement1.10:1.0022
Groton Subordinated Back Leverage maturitySeptember 30, 203822
Groton Subordinated Back Leverage interest rate before Step Down Date8%22
Groton Subordinated Back Leverage Loan Facility amount8.0 million22
Groton Senior Back Leverage maturityAugust 18, 203022
Groton Senior Back Leverage Loan Facility amount12.0 million22
Groton Senior Back Leverage Liberty Lender interest rate6.75%22
Groton Senior Back Leverage DSCR requirement1.20:1.0022
Groton Senior Back Leverage Amalgamated Lender interest rate with Carbon Offset Event7.32%22
Groton Senior Back Leverage Amalgamated Lender interest rate no Carbon Offset Event6.07%22
Groton Interest Only Period84 months or until Groton Senior Back Leverage Loan fully repaid22
Groton Back Leverage total drawn20.0 million22
Generation backlog955.022
Generation Backlog$955.0 million23
Future required payments (principal and interest)126.522
EXIM Financing term7 years22
EXIM Financing net proceeds9.2 million22
EXIM Financing interest rate5.81%22
EXIM Financing gross proceeds10.1 million22
Derby Subordinated Back Leverage maturityMarch 31, 203822
Derby Subordinated Back Leverage interest rate8%22
Derby Subordinated Back Leverage Loan Facility amount3.5 million22
Derby Senior Back Leverage maturityMarch 31, 203122
Derby Senior Back Leverage interest rate7.25%22
Derby Senior Back Leverage Loan Facility amount9.5 million22
Derby Back Leverage total drawn13.0 million22
Connecticut Loan term15 years22
Connecticut Loan repayment penalty2.1 million22
Connecticut Loan penalty per position below Employment Obligation14,225.0022
Connecticut Loan interest rate2.0%22
Connecticut Loan forgiveness amount if Employment Obligation met2.0 million22
Connecticut Loan amount10.0 million22
Cash and Cash Equivalents, Unrestricted174,66223
Backlog$1.24 billion23
Annualized production rate30.522
Annualized production rate31.122
Annualized production rate33.222
Annualized production rate29.322
Advanced Technologies contract backlog non US Government17.5 million22
Advanced Technologies contract backlog US Government6.8 million22
Advanced Technologies contract backlog24.322
Advanced Technologies contract backlog24.3 million22
Advanced Technologies Backlog$24.3 million23
FuelCell Energy, published 2025-06-06, period 2025-Q2
Restricted cash63.1 million20
Outstanding Letters of Credit14.2 million20
Non-U.S. Government funded backlog22.0 million20
Generation Operating Portfolio62.8 MW20
Finance obligation sale leaseback18.8 million20
unrestricted cash and cash equivalents116.1 million20
U.S. Treasury Securities carrying value60.9 million20
U.S. Treasury Securities60.9 million20
U.S. Government funded backlog7.6 million20
Total project assets228.2 million20
Total cash and restricted cash179.1 million20
Total backlog1.26 billion20
Service agreements backlog164.4 million20
Product backlog98.2 million20
Operating MW capacity62.8 MW20
Net debt related to project assets112.1 million20
Generation backlog967.4 million20
Backlog1,259,59721
Annualized production rate30.6 MW20
Advanced Technologies contract backlog29.6 million20
Advanced Technologies contract backlog29.6 million20
FuelCell Energy, published 2025-03-11, period 2025-Q1
US Treasury Securities Weighted Average Yield4.30%18
US Treasury Securities Carrying Value110.3 million18
Restricted Cash Total62.4 million18
Restricted Cash OpCo Financing25.5 million18
Restricted Cash Groton Senior Back Leverage10.8 million18
Restricted Cash Derby Back Leverage2.3 million18
Restricted Cash Crestmark Sale Leaseback2.9 million18
Outstanding Letters of Credit14.2 million18
OpCo Financing SOFR Margin Thereafter3%18
OpCo Financing SOFR Margin First Four Years2.5%18
OpCo Financing Quarterly Principal Amortization Periodquarter ending June 2025 through quarter ending March 202618
OpCo Financing Quarterly Principal Amortization675,000 per quarter18
OpCo Financing Net Interest Rate Thereafter6.866%18
OpCo Financing Net Interest Rate Four Years6.366%18
OpCo Financing Fixed Rate Swap3.716%18
OpCo Financing Facility Total Net Proceeds Company46.1 million18
OpCo Financing Facility Total Capital Expenditure Reserve Target29.0 million18
OpCo Financing Facility Term Loan80.5 million18
OpCo Financing Facility Net Proceeds77.6 million18
OpCo Financing Facility LC Facility6.5 million18
OpCo Financing Facility Fees and Transaction Costs2.9 million18
opco financing facility capital expenditure reserve14.5 million18
opco financing debt service coverage ratio1.20:1.0018
opco financing base rate margin thereafter2%18
opco financing base rate margin first four years1.5%18
interest rate swap fair value loss$(3.5) million18
interest rate swap fair value gain0.9 million18
Groton unrestricted cash6.8 million18
Groton total debt service coverage ratio1.10:1.0018
Groton subordinated principal payment excess cash flow50%18
Groton subordinated interest rate step down8%18
Groton subordinated interest rate post step down floor5%18
Groton subordinated DSCR reserve0.3 million18
Groton subordinated back leverage loan facility8.0 million18
Groton senior operations maintenance reserve6.5 million18
Groton senior interest rate Liberty6.75%18
Groton senior interest rate Amalgamated no carbon offset6.07%18
Groton senior interest rate Amalgamated carbon offset7.32%18
Groton senior DSCR reserve accounts1.7 million18
Groton senior debt service coverage ratio1.20:1.0018
Groton senior back leverage loan facility12.0 million18
Groton Released to Parent11.1 million18
Groton Output Shortfall Payments1.3 million18
Groton Back Leverage Total Drawn20.0 million18
Groton Back Leverage Net Proceeds19.6 million18
Groton Back Leverage Fees and Transaction Costs0.4 million18
Generation Operating Portfolio62.8 MW18
Finance Obligation Imputed Interest10.9 million18
Finance Obligation Balance18.8 million18
Connecticut State Loan Penalty per Position14,225.0018
Connecticut State Loan Interest Rate2.0%18
Connecticut State Loan Initial Disbursement10.0 million18
Connecticut State Loan Forgiveness Eligible5.0 million18
Connecticut State Loan Estimated Penalty2.1 million18
Connecticut State Loan Employment Obligation Third Amendment538 retained18
Connecticut State Loan Employment Obligation Second Amendment538 continuously maintained18
Connecticut State Loan Employment Obligation Original165 created and 538 retained18
Connecticut State Loan Credit Second Amendment2.0 million18
Advanced Technologies US Government Funded8.2 million18
Advanced Technologies Non-US Government Funded23.4 million18
Advanced technologies contract backlog31.6 million18
Unrestricted Cash and Cash Equivalents$98.1 million18
Unrestricted Cash and Cash Equivalents$98,07019
US Treasury Securities$110.3 million18
Total Project Assets$236.7 million18
Total Backlog$1.31 billion18
Short-term Investments$110,29819
Service Backlog$172,32619
Service Agreements Backlog$172.3 million18
Restricted Cash and Cash Equivalents$62,35219
Restricted Cash$62.4 million18
Product Backlog$111.2 million18
Product Backlog$111,21119
Net Debt Project Assets$114.3 million18
Generation MW Operating62.818
Generation Backlog$997.4 million18
Generation Backlog$997,39719
Backlog$1,312,50019
Advanced Technologies Backlog$31.6 million18
Advanced Technologies Backlog$31,56619
FuelCell Energy, published 2024-12-27, period FY2024
Loss Accruals on Service Agreements$9.0 million17
Foreign Currency Portion of Cash and Cash Equivalentsapproximately 1%17
Versa Pending U.S. Patent Applications1317
Versa Patent Applications Pending in Other Jurisdictions3017
Versa International Patents6817
Versa U.S. Patents1917
U.S. Patents Held (Excluding Subsidiaries)14817
U.S. Grid Transmission Line Losses Averageabout 5%17
U.S. Treasury Securities Weighted Average Yield to Maturity4.78%17
U.S. Treasury Securities carrying value$109.1 million17
Torrington Facility Sized for Eventual Capacityup to 200 MW per year17
Torrington Facility Size167,000 square feet17
Torrington Facility Maximum Annualized Capacity100 MW per year17
Torrington Facility Annualized Production Rate27.7 MW per year17
Taufkirchen facility module assembly capabilityup to 20 MW per year17
Solid Oxide SOEC Manufacturing Capacity Potentialup to 80 MW per year17
Service Agreements Weighted Average Termapproximately 16 years17
Property Plant Equipment Expected20.0 to 25.0 million17
Projects In Development1.3 MW17
Product warranty term in U.S.15 months after shipment or 12 months after acceptance17
Patents in other jurisdictions (excluding subsidiaries)30717
Patent applications pending in other jurisdictions8617
Patent applications pending in U.S.2817
New carbon capture projects CO2 capture limitno more than 250,000 tons of CO2 on a cumulative annual basis17
Long Term Project Assets Expected3.0 to 6.0 million17
Legacy fuel cell modules target design life5-year17
LTSA and PPA expiration rangethrough 204217
Initial maximum Joint Development Agreement research cost reimbursement45.0 million17
Industry average experience modification rate1.017
Hourly rates increase in Amendment No. 515%17
Government funding percentage of revenue4%17
Government funding percentage of revenue3%17
Government funding percentage of revenue6%17
Generation Operating Portfolio62.8 MW17
FuelCell Energy Solutions GmbH licensed patents outside U.S.717
FuelCell Energy Solutions GmbH licensed U.S. patents217
Fuel cell stack module design life25-to-30 years17
Extended maximum Joint Development Agreement research cost reimbursement67.0 million17
Experience modification rate0.8317
Experience modification rate0.8917
Experience modification rate0.08817
Experience modification rate0.6817
Experience modification rate0.5917
Experience modification rate0.6517
Experience modification rate0.6217
EMTEC license agreement payment10 million17
Diverse team member population increase5%17
Current production fuel cell modules target design life7-year17
Conflict minerals (3TG) in fiscal year 2023 shipments14.0 pounds out of 4.6 million pounds (0.000299%)17
Company funded R&D expected40.0 to 45.0 million17
Carbonate fuel cell electrical efficiency rangeapproximately 47% to 60%17
Carbonate Platform maximum annualized capacity100 MW17
Carbonate Platform future capacity200 MW17
Carbon capture demonstrationup to 95%17
Calgary facility total leased spaceapproximately 100,000 square feet17
Calgary facility potential total annualized SOEC manufacturing capacityup to 80 MW per year17
Calgary facility current annualized SOEC production capacity6 MW17
Calgary facility additional leased space from fiscal 2024 andapproximately 68,000 square feet17
CHP system efficiency potentialup to 90%17
Annual hourly rates increase beginning March 313%17
Amendment No. 5 expected annual budget for JDAat least 10.0 million per year17
FuelCell Energy, published 2024-12-19, period FY2024
unrestricted cash and cash equivalents$148.1 million16
Cash and short-term investments$318.0 million16
Backlog$1,162,83316
FuelCell Energy, published 2024-09-05, period 2024-Q3
unrestricted cash and cash equivalents159.3 million13
U.S. Treasury Securities107.8 million13
Total project assets248.8 million13
Total backlog1.20 billion13
Short-term investments107,81714
Service agreements backlog178.4 million13
restricted cash and cash equivalents58.8 million13
restricted cash and cash equivalents58,84814
Product backlog136.7 million13
Pledged cash for performance security58.8 million13
outstanding letters of credit14.2 million13
Net debt related to project assets118.7 million13
Generation operating portfolio capacity62.8 MW13
Generation operating portfolio62.8 MW13
Generation backlog839.5 million13
Cash and cash equivalents, unrestricted159,34714
Cash and cash equivalents218.2 million13
Backlog$1,197,10714
Advanced Technologies contract backlog42.5 million13
FuelCell Energy, published 2024-06-10, period 2024-Q2
Unrestricted cash and equivalents158.8 million11
Unrestricted Cash158.8 million12
U.S. Government funded backlog12.7 million11
Total backlog1.06 billion11
Short-term Investments101.3 million12
Service agreements backlog145.1 million11
Service Backlog145,10012
Restricted cash pledged53.1 million11
Product backlog12.3 million11
Product Backlog12,30712
outstanding letters of credit14.2 million11
Operating MW62.8 MW11
Non U.S. Government funded backlog38.4 million11
Net debt from project assets121.5 million11
Generation operating portfolio62.8 MW11
Generation backlog852.9 million11
Generation Backlog852,93312
GGE LTSA contract value159.6 million USD11
Cash and Short-term Investments313.2 million12
Backlog1,061,45212
Advanced Technologies contract backlog51.1 million11
Advanced Technologies backlog51.1 million11
Advanced Technologies Backlog51,11212
FuelCell Energy, published 2024-03-07, period 2024-Q1
Tulare biomat fuel contract duration20 years9
Toyota hydrogen PPA through dateMay 20259
Toyota hydrogen PPA fuel contract duration2 years9
Total debt service coverage ratio minimum1.10:1.009
Subordinated back leverage loan step-down rate8%9
Subordinated back leverage loan rate after step-downlesser of 8% or 10 year U.S. Treasury Note plus 275 basis points (minimum 5% per annum)9
Subordinated back leverage loan maturity dateSeptember 30, 20389
Subordinated back leverage loan interest-only period max84 months9
Senior debt service coverage ratio minimum1.20:1.009
Senior back leverage loans prepayment fee years 4-71%9
Senior back leverage loans prepayment fee years 2-42%9
Senior back leverage loans prepayment fee years 0-23%9
Senior back leverage loans maturity dateAugust 18, 20309
Senior back leverage loans amortization period10 years9
RNG pricing sensitivity analysis annual impact$2.0 million9
Restricted cash performance security and letters of credit$51.3 million9
Restricted cash OpCo financing facility$21.6 million9
Restricted Cash Crestmark Sale Leaseback$2.9 million9
Restricted cash back leverage loan facility$9.0 million9
opco financing facility net rate thereafter6.866%9
opco financing facility net rate first four years6.366%9
opco financing facility fixed swap rate3.716%9
natural gas sensitivity analysis annual impact$26,0009
lipa yaphank ppa through dateSeptember 20289
lipa yaphank fixed price fuel contract duration7 years9
Letters of credit outstanding$14.2 million9
interest rate swap fair value loss q1$3.5 million9
Generation Operating Portfolio62.8 MW9
foreign currency cash percentage0.5%9
derivative loss natural gas q1$1.9 million9
derby projects capacity14.0 MW and 2.8 MW9
derby ppa through dateOctober 20299
derby fixed price fuel contract duration6 years9
connecticut loan principal amount$10.0 million9
connecticut loan penalty per position$14,225.009
connecticut loan interest rate2.0%9
connecticut loan forgiveness eligible amount$5.0 million9
connecticut loan employment obligation positions5389
connecticut loan credit eligible amount$2.0 million9
connecticut loan additional positions for credit919
bridgeport project capacity14.9 MW9
Bishop Rule 10b5-1 Plan share sale64,853 shares9
Bishop Rule 10b5-1 Plan expiration dateJanuary 7, 20259
Advanced Technologies US government-funded backlog$3.7 million9
Advanced Technologies non-US government-funded backlog$19.7 million9
Advanced technologies contract backlog$23.4 million9
Unrestricted cash and cash equivalents as of October 31250.0 million9
Total project assets260.8 million9
Service agreements backlog140.4 million9
restricted cash and cash equivalents51.3 million9
Projects in development0.7 million9
Pledged cash collateral for performance security51.3 million9
Overall backlog1.03 billion9
Operating power plants capacity62.8 MW9
Operating installations260.1 million9
Net debt outstanding related to project assets110.7 million9
Generation backlog0.86 billion9
Generation Operating Portfolio62.8 MW10
Future required payments (principal and interest)134.8 million9
Finance obligations under sale-leaseback transactions18.8 million9
Depreciation of project assets6.8 million9
Depreciation and amortization8.6 million9
Backlog1,025,54910
Annualized production rate33.2 MW9
Advanced Technologies contract backlog23.4 million9
FuelCell Energy, published 2023-12-19, period FY2023
Unrestricted cash and cash equivalents250.0 million7
Total backlog1.03 billion7
Short-term investments US Treasury securities103.8 million7
Service and generation backlog weighted average termapproximately 17 years7
Service agreements backlog140.8 million7
Projects under development19.4 MW7
Project assets258.1 million7
Product backlog07
Operating portfolio of retained projects43.7 MW7
Operating generation portfolio43.7 MW7
Net debt outstanding related to project assets112.6 million7
Government funding percentage of revenue3%7
Government funding percentage of revenue6%7
government funding percentage of revenue9%7
Generation Backlog872.1 million7
carbonate platforms installed and operatingmore than 220 MW7
Annualized Production Rate32.7 MW7
Advanced technologies contract backlog15.3 million7
additional projects under development or construction19.4 MW7
unrestricted cash and cash equivalents250.0 million7
U.S. Treasury Securities carrying value103.8 million7
U.S. Government unfunded Advanced Technologies backlog0.3 million7
U.S. Government funded Advanced Technologies backlog4.3 million7
Torrington maximum annualized capacity100 MW per year7
Torrington Facility Annualized Production Rate32.7 MW per year7
Torrington eventual annualized production capacityup to 200 MW per year7
Taufkirchen Germany capabilityup to 20 MW per year7
South Korea installed base additional MWmore than 100 MW7
South Korea Noeul Green Energy long term service agreement term14 years7
South Korea KOSPO power plant project MW20 MW7
restricted cash and cash equivalents49.6 million7
pledged cash for performance security and letters of credit49.6 million7
outstanding letters of credit14.2 million7
Non U.S. Government funded Advanced Technologies backlog10.7 million7
loss accruals on service agreements October 319.5 million7
loss accruals on service agreements October 317.3 million7
Groton Project design rated output7.4 MW7
Groton Project current output6.0 MW7
Generation operating portfolio43.7 MW7
derivative gain from natural gas settling fiscal year4.1 million7
derivative fair value adjustment fiscal year3.3 million gain7
derivative fair value adjustment fiscal year0.9 million gain7
Depreciation of project assets20.3 million7
Depreciation of project assets15.5 million7
D&A25.4 million7
D&A21.3 million7
Company-funded R&D expenses60.0 million to 70.0 million7
Company-funded R&D expenses61.0 million7
Cash and cash equivalents and restricted cash299.6 million7
Calgary solid oxide production capacity expected10 MW SOFC or 40 MW SOEC per year7
Calgary solid oxide production capacity current1 MW SOFC or 4 MW SOEC per year7
Calgary manufacturing facility expected capacity40 MW per year7
Calgary manufacturing facility current capacity4 MW per year7
Advanced Technologies contract backlog15.3 million7
FuelCell Energy, published 2023-12-19, period 2023-Q4
unrestricted cash and cash equivalents$250.0 million8
Short-term investments (U.S. Treasury Securities)$103.8 million8
restricted cash and cash equivalents$49.6 million8
Portfolio of generation assetsover 60 MW8
Backlog$1.028 billion8
Annualized production rate (Carbonate Platform)32.7 MW8
FuelCell Energy, published 2023-09-11, period 2023-Q3
Unrestricted cash and equivalents$303.7 million5
unrestricted cash and cash equivalents$303.7 million5
Unrestricted Cash and Cash Equivalents303.76
U.S. Treasury Securities Weighted Average Yield to Maturity5.09%5
U.S. Treasury Securities carrying value$77.4 million5
Total space leased in Calgaryapproximately 80,000 square feet5
Total net proceeds to Company$46.1 million5
Total backlog$1.06 billion5
Torrington Facility Maximum Annualized Capacity100 MW per year5
Torrington facility eventual production capacityup to 200 MW per year5
Term Loan principal amount$80.5 million5
Short-term investments (U.S. Treasury Securities)$77.4 million5
Shares reserved for issuance54,655,306 shares5
Shares available for issuance55,295,919 shares5
Service agreements backlog$136.6 million5
Service Backlog136.66
restricted cash and cash equivalents$32.7 million5
RNG pricing sensitivity impact$2.0 million per $10/MMBtu increase5
Purchase of U.S. Treasury Securities$195.8 million5
Projects in Development19.4 MW5
Project asset expenditures$35.4 million5
Project asset expenditures$23.7 million5
Proceeds from debt$80.5 million5
Potential total annualized SOEC manufacturing capacityup to 80 MW per year5
Potential additional SOEC manufacturing capacity at Calgaryup to an additional 40 MW per year5
Payments of debt issuance costs$2.9 million5
Payments for preferred dividends and distribution to noncontrolling interest$2.8 million5
Payments for preferred dividends and distribution to noncontrolling interest$2.6 million5
outstanding letters of credit$7.3 million5
Net proceeds from sales of common stock$85.9 million5
Net proceeds from sales of common stock$145.4 million5
Net proceeds distributed to Parent$34.9 million5
Net interest rate (thereafter, new facility)6.866%5
Net interest rate (first four years, new facility)6.366%5
Net debt project assets$94.9 million5
Net contributions received from sale of noncontrolling interest in LIPA Yaphank Project$11.9 million5
Natural gas price sensitivity impact$200,000 per $1/MMBtu increase5
Letter of credit facility amount$6.5 million5
Interest rate swap fixed rate (new facility)3.716%5
Green Bank Loan balance as of July 31$3.0 million5
Generation operating portfolio capacity43.7 MW5
Generation backlog$915.1 million5
Generation Operating Portfolio43.7 MW5
Generation Backlog915.16
Funds received from maturity of U.S. Treasury Securities$120.9 million5
Depreciation and amortization of project assets$5.4 million5
Depreciation and amortization of project assets$4.1 million5
Depreciation and amortization of project assets$14.9 million5
Depreciation and amortization of project assets$11.8 million5
Depreciation and amortization$6.6 million5
Depreciation and amortization$5.3 million5
Depreciation and amortization$18.7 million5
Depreciation and amortization$16.4 million5
Debt repayments$42.2 million5
Debt repayments$7.2 million5
Connecticut State Loan term15 years5
Connecticut State Loan principal$10.0 million5
Connecticut State Loan interest rate2.0%5
Company-funded research and development expenses$43.0 million5
Cash and cash equivalents and restricted cash$336.4 million5
Cash and Short-term Investments413.96
Capital expenditures reserve required$29.0 million5
Capital expenditures reserve funded from closing$14.5 million5
Capital expenditures$28.0 million5
Capital expenditures$15.8 million5
Calgary facility capacity expansion (current to planned)4 MW to 10 MW per year (SOFC) or 4 MW to 40 MW per year (SOEC)5
Backlog1,063.36
Authorized shares of common stock500,000,000 shares5
Advanced Technologies contract backlog$11.6 million5
Advanced Technologies contract backlog$11.6 million5
Advanced Technologies Backlog11.66
Additional space leased in Calgaryapproximately 48,000 square feet5
FuelCell Energy, published 2023-06-08, period 2023-Q2
Unrestricted cash246.8 million3
Total backlog1.02 billion3
Short-term investments treasury76.4 million3
Service agreements backlog73.7 million3
Product backlog26 thousand3
Operating MW capacity43.7 MW3
MW in process19.4 MW3
Generation Backlog926.0 million3
Advanced technologies backlog22.6 million3
unrestricted cash and cash equivalents$246.8 million3
Unrestricted cash246.8 million4
U.S. Treasury Securities carrying value$76.4 million3
Toyota project expensed costs$11.6 million3
Total project assets$237.2 million3
restricted cash and cash equivalents$30.2 million3
Projects under development and construction19.4 MW3
pledged cash and cash equivalents for performance security$30.2 million3
outstanding letters of credit$9.1 million3
Operating project assets revenue$18.0 million3
Operating project assets43.7 MW3
D&A$6.6 million3
D&A$5.3 million3
D&A$12.0 million3
D&A$11.1 million3
Company-funded R&D expenses$27.4 million3
Cash and short-term investments353.5 million4
Cash and cash equivalents and restricted cash$277.1 million3
Capitalized project asset expenditures$19.8 million3
Backlog1,022,2964
Advanced Technologies contract backlog$22.6 million3
FuelCell Energy, published 2023-03-09, period 2023-Q1
unrestricted cash and cash equivalents315.2 million1
unrestricted cash and cash equivalents315.2 million2
Total project assets229.9 million1
Total backlog1.06 billion1
Total Backlog1,061,1072
Solid Oxide Platform planned additional U.S. capacity400 MW2
Solid Oxide Platform expected annualized electrolysis production capacity after Calgary expansion40 MWs2
Solid Oxide Platform Calgary facility expansion spaceapproximately 80,000 square feet2
Short-term investments in U.S. Treasury Securities75.7 million1
Short-term investments in U.S. Treasury Securities75.7 million2
Service agreements backlog99.9 million1
restricted cash and cash equivalents24.6 million1
restricted cash and cash equivalents24.6 million2
Projects in development capacity19.4 MW1
outstanding letters of credit5.0 million1
Operating power plants capacity43.7 MW1
Net debt outstanding related to project assets68.7 million1
Generation backlog0.9 billion1
Cash, Restricted Cash and Short-Term Investments415.4 million2
Carbonate Platform planned annualized production rate for fiscal year45 MW2
Carbonate Platform maximum annualized capacity100 MW2
Carbonate Platform eventual capacity with additional investment200 MW2
Carbonate Platform annualized production rate38.2 MW2
Backlog - Service99,8522
Backlog - Product02
Backlog - Generation934,4842
Backlog - Advanced Technologies26,7712
Advanced Technologies contract backlog26.8 million1

FuelCell Energy Development

How FuelCell Energy has developed since 2023: one paragraph per period on revenue, earnings, cash flow and drivers, most recent period first, grouped by year. NadirAlpha methodology

FY2026: FuelCell Energy

FuelCell Energy reported revenue of 30.5 million, 35.6 million, and 33 million in Q1, Q2, and Q3 of fiscal year 2026, respectively, with operating losses in all three quarters 26, 28, 30. In Q1, product revenue increased significantly to $12.0 million from $0.1 million in the prior-year period, driven by module deliveries under long-term service agreements with GGE and CGN in South Korea 26, 27. In Q2, the company recorded a $42.6 million non-cash impairment charge related to performance issues with SureSource 4000 fuel cells at the Groton Project, which was not operating as of April 30, 2026 pending an equipment upgrade estimated to cost $20.0 to $30.0 million and expected to be completed in fiscal year 2027 28, 29. In Q3, FuelCell Energy signed a Capital Equipment Purchase Agreement with Fit Energy USA LP for approximately $2.6 billion to supply up to 380 MW of carbonate fuel cell block systems, and committed backlog increased 4.1% to $1.30 billion 30, 31. FuelCell Energy raised net proceeds of $453.6 million from equity issuances during the first nine months of fiscal 2026, ending Q3 with unrestricted cash of 658.1 million, and initiated a manufacturing capacity expansion at its Torrington, Connecticut facility targeting an annualized production rate of 500 MW by June 2028 30.

FY2025: FuelCell Energy

FuelCell Energy reported total revenues of $158.2 million in fiscal year 2025, a 41% increase from $112.1 million in fiscal 2024, driven primarily by a 169% surge in product revenues to $69.1 million, with $66.0 million recognized under the long-term service agreement with Gyeonggi Green Energy Co., Ltd. for delivery of 22 replacement fuel cell modules at its 58.8 MW facility in South Korea (24). Gross margin improved to (16.7)% from (32.0)%, reflecting better cost absorption as production volumes increased at the Torrington manufacturing facility (24). FuelCell Energy recorded a $65.8 million non-cash impairment charge related to prior investments in solid oxide technology, including goodwill, in-process research and development, property, plant and equipment, and inventory, and conducted two global restructuring actions in November 2024 and June 2025, reducing the global workforce by approximately 35% in aggregate (24). Net loss attributable to common stockholders widened to $191.1 million ($7.42 per share) from $129.2 million, largely due to the impairment charges (24). Unrestricted cash increased to $278.1 million from $148.1 million at fiscal year-start, supported by at-the-market equity issuances of approximately 25.6 million shares at an average price of $7.44 per share and a new $25.0 million EXIM financing closed in November 2025 (24).

FY2024: FuelCell Energy

FuelCell Energy's total revenues for fiscal year 2024 declined 9% to $112.1 million from $123.4 million in FY2023, as an 80% drop in Service agreements revenues to $10.0 million, driven by only 2 module exchanges versus 15 in the prior year, more than offset a 33% increase in Generation revenues to $50.0 million and a 54% rise in Advanced Technologies contract revenues to $26.5 million 17. The operating generation portfolio expanded from 43.7 MW to 62.8 MW as the Toyota Project, Derby 14.0 MW Project, and Derby 2.8 MW SCEF Project achieved commercial operations in Q1 2024 9. Gross loss widened to $35.9 million with a negative 32.0% gross margin, and the operating loss increased to $158.5 million from $136.1 million in FY2023 17. The Gyeonggi Green Energy long-term service agreement for 58.8 MW, valued at $159.6 million, drove total backlog 13.1% higher to $1.16 billion as of October 31, 2024 16. In November 2024, the company announced a global restructuring with a 17% total workforce reduction, deferred the Calgary capacity expansion, and disclosed it would not meet previously provided aspirational revenue targets for FY2025 and FY2030 due to slower-than-expected hydrogen adoption and delayed commercialization timelines for SOEC, SOFC, and carbon capture products 16.

FY2023: FuelCell Energy

FuelCell Energy reported total revenues of $123.4 million in fiscal year 2023, a 5% decline from $130.5 million in fiscal year 2022, as a 284% increase in service agreements revenues to $49.1 million from 15 new module exchanges -- primarily at Korea Southern Power Company facilities -- was more than offset by lower product revenues and a 20% decline in Advanced Technologies contract revenues 7. Gross margin improved to (8.5)% from (22.7)% in the prior fiscal year, driven by higher-margin service agreement activity, while the loss from operations narrowed to $136.1 million from $143.7 million 7. The net loss attributable to common stockholders decreased to $110.8 million from $145.9 million in fiscal year 2022, though adjusted EBITDA deteriorated to $(102.9) million from $(91.7) million in the prior year 8. Company-funded research and development expenses increased to $61.0 million from $34.5 million, reflecting accelerated investment in solid oxide platform commercialization and carbon capture technology development 7. Unrestricted cash ended the fiscal year at $250.0 million, with total cash and restricted cash declining from $481.0 million to $299.6 million, partly reflecting the purchase of U.S. Treasury Securities classified outside unrestricted cash 7.

Glossary

  • Revenue: Revenue from contracts with customers, net of sales deductions, as the company itself reports it; not total output, gross revenue, GMV or order intake.
  • Op. income: The operating line of the income statement; EBIT only as a marked fallback, never pre-tax or ordinary income.
  • EBITDA (adj.): Adjusted EBITDA, verbatim and company-defined (non-GAAP), never derived.
  • Net income: Net income attributable to the shareholders of the parent, after discontinued operations; not the result including minority interests, not comprehensive income.
  • EPS: Diluted earnings per share attributable to the shareholders of the parent; a printed figure always beats a calculated one, calculated values are marked.
  • EPS adj.: Adjusted earnings per share, verbatim and company-defined (non-GAAP).
  • FCF: Free cash flow = operating cash flow minus capital expenditure on property, plant and equipment; the company's own free cash flow figure is shown separately.
  • OCF: Cash flow from operating activities as reported; IFRS companies may show interest paid in financing cash flow, so the figure is not always comparable.
  • Cash: Cash and cash equivalents, without securities unless the company reports them as part of the position.
  • Net Debt: Net debt = financial debt excluding lease liabilities minus cash at the same reporting date; the company's own net position may differ.
  • *: derived, the formula is in the hover
  • ≈: calculated, approximation
  • ~: uncertain; the value stays visible, verdicts do not use it
  • °: repaired by a targeted query against the document, or curated with documentary evidence
  • EBIT: EBIT as a fallback: the income statement carries no operating line
  • basic: basic earnings per share as a fallback when diluted is missing

Sources: quarterly reports, annual reports and investor relations documents

The evidence base for FuelCell Energy stock: every document with type and date, every figure in the report leads here by number and to the original by link. NadirAlpha methodology

47 documents · 2016 to 2026 · SEC EDGAR (USA)
Sources for FuelCell Energy stock: 47 original documents, 2016 to 2026. Compiled by NadirAlpha.
#Document typePublished
#110-Q quarterly report2023-03-09
#28-K-EX99.1 earnings release2023-03-09
#310-Q quarterly report2023-06-08
#48-K-EX99.1 earnings release2023-06-08
#510-Q quarterly report2023-09-11
#68-K-EX99.1 earnings release2023-09-11
#710-K annual report2023-12-19
#88-K-EX99.1 earnings release2023-12-19
#910-Q quarterly report2024-03-07
#108-K-EX99.1 earnings release2024-03-07
#1110-Q quarterly report2024-06-10
#128-K-EX99.1 earnings release2024-06-10
#1310-Q quarterly report2024-09-05
#148-K-EX99.1 earnings release2024-09-05
#158-K-EX99.1 earnings release2024-11-15
#168-K-EX99.1 earnings release2024-12-19
#1710-K annual report2024-12-27
#1810-Q quarterly report2025-03-11
#198-K-EX99.1 earnings release2025-03-11
#2010-Q quarterly report2025-06-06
#218-K-EX99.1 earnings release2025-06-06
#2210-Q quarterly report2025-09-09
#238-K-EX99.1 earnings release2025-09-09
#2410-K annual report2025-12-18
#258-K-EX99.1 earnings release2025-12-18
#2610-Q quarterly report2026-03-09
#278-K-EX99.1 earnings release2026-03-09
#2810-Q quarterly report2026-06-08
#298-K-EX99.1 earnings release2026-06-08
#3010-Q quarterly report2026-09-02
#318-K-EX99.1 earnings release2026-09-02
Older sources (+16)
Older sources for FuelCell Energy, 16 documents
#Document typePublished
#20910-K annual report2016-03-10
#20810-Q quarterly report2016-06-09
#21110-K annual report2017-01-12
#21010-Q quarterly report2017-06-08
#21310-K annual report2018-01-11
#21210-Q quarterly report2018-06-07
#21510-K annual report2019-01-10
#21410-Q quarterly report2019-06-17
#20310-K annual report2020-01-22
#21610-Q quarterly report2020-03-16
#20110-Q quarterly report2020-06-12
#20210-Q quarterly report2020-09-10
#20710-K annual report2021-01-21
#20410-Q quarterly report2021-03-16
#20510-Q quarterly report2021-06-10
#20610-Q quarterly report2021-09-14

FuelCell Energy Stock FAQ

Is there a management forecast (guidance) for FY2027?

Yes. Management has issued targets for FY2027, including Groton Project upgrade cost. The guidance tracking chapter shows all targets and checks them against the actuals reported later; neutral, with no estimate of our own.

Which additional key figures does FuelCell Energy report?

As reported for Q3 FY2026 (May to Jul 2026): Annualized production rate, sales pipeline, Torrington facility expansion target, generation portfolio, committed backlog, committed advanced technologies contract backlog. The chapter Reported KPIs lists every value with its source. Revenue is broken down by Product, Generation, Advanced Technologies, Service.

Does FuelCell Energy pay a dividend?

The filings report on the dividend; most recent entry: dividends paid $2.8 million (2023-Q3) (as reported, no assessment of our own). Details with source links are in the report chapters.

Where can I find the official investor relations documents of FuelCell Energy?

NadirAlpha links all 47 original filings used (SEC filings) in the sources chapter: quarterly report, earnings release, annual report, each with type, publication date and a direct link; every figure in the report carries a source number.

More reports by NadirAlpha

All reports · US Stocks (43)