FuelCell Energy, Inc. FCEL

SEC filings · Reporting currency USD · Quarterly reporting · Figures as of 2026-Q3 · updated 2026-09-06 · ISIN US35952H7008
Revenue decelerating Margin compressing Net cash build Guidance initiated strategy: New market
The new quarter, monitored by AI. · We follow every stock through its original filings: the latest figures against their history, guidance against actuals; neutral, continuously updated, every figure clickable with its source.
AI-generated report · not investment advice · figures extracted automatically; please verify against the linked original more
AI-generatedCreated with AI assistance from the company's linked original filings (transparency per Art. 50 EU AI Act). More about the tool: Claude Code.
Not investment adviceNeutral financial information, no recommendation, no investment research within the meaning of MiFID II.
Verify yourselfFigures are extracted automatically, errors are possible. Every figure is clickable with its source; the issuer's original documents are always authoritative.
EditorialThe texts (business model, current status, development and others) are written AI-editorially from the original reports alone, cross-checked automatically and backed with sources; the company's own account, no assessment of our own. Methodology
AI research · This page works as a source-backed data basis for further research with AI assistants such as Claude; every figure remains verifiable via the source links.
Advertisement

Business Model#

What the company does and how it earns its money; written AI-editorially, exclusively from the company's original reports, without any assessment of our own.

FuelCell Energy designs, manufactures, installs, and operates carbonate fuel cell power plants that generate electricity and heat through an electrochemical process using natural gas, biogas, or other hydrogen-bearing fuels. The company's revenues flow from three channels: product sales covering delivery of fuel cell modules and systems to third-party customers including utilities and industrial buyers in the United States, South Korea, and other international markets; generation revenues from ownership and operation of power plants under long-term power purchase agreements; and long-term service agreements covering maintenance and operation of installed customer systems. FuelCell is also developing adjacent technologies, including an industrial-scale carbon capture system co-developed with ExxonMobil that uses carbonate fuel cell chemistry to capture CO2 from industrial exhaust streams, and a solid oxide electrolysis platform for hydrogen production. The company's growth strategy is anchored on converting a large contracted and awarded backlog into delivered product revenue while scaling its Torrington, Connecticut manufacturing facility toward a 500 MW annualized production rate by June 2028.

Advertisement

Current Status#

Summary of the most recent reporting period: core figures, drivers and management statements; written editorially from the current original report, every figure backed by a source number.

FuelCell Energy reported Q3 2026 revenue of $33.0 million, down 29% from $46.7 million in Q3 2025, as net loss narrowed to $44.5 million and diluted loss per share improved to $0.64 from $3.78 in the prior-year quarter 30 31. Operating loss was $46.7 million and unrestricted cash stood at $658.1 million as of July 31, 2026, following an underwritten equity offering that closed during the quarter 30. On June 22, 2026, the company entered a Capital Equipment Purchase Agreement with Fit Energy USA LP for approximately $2.6 billion to manufacture and deliver carbonate fuel cell systems with up to 380 MW of generating capacity across four phases, lifting Committed Backlog to $1.30 billion 30. The company also signed its first Capacity Reservation Agreement with a major data center operator and completed delivery of the first industrial-scale carbon capture modules to ExxonMobil in Rotterdam 31.
Management commentary on the 2026-Q3 results (8-K-EX99.1, 2026-09-02):
„The expansion of our Committed and Awarded Capacity Backlog to $3.6 billion reflects increasing customer demand for reliable, scalable infrastructure that reduces dependence on constrained transmission systems, simplifies permitting, and enables AI driven compute to be deployed faster.“ – Jason Few, President and Chief Executive Officer 31
„Demand for electricity is accelerating, driven by AI, data centers, and the broader electrification of the economy. With a growing commercial pipeline, expanding manufacturing capacity, and differentiated technology, we believe FuelCell Energy is well positioned to capitalize on these long-term market tailwinds.“ – Jason Few, President and Chief Executive Officer 31
Revenue · 2026-Q333$m−29.3 % vs. 2025-Q3
Net profit · 2026-Q3-44$m+51.5 % vs. 2025-Q3
EPS · 2026-Q3-0.64$+66.1 % vs. 2025-Q3
Revenue trend
Guidance
For FY2027, the company guides Groton Project upgrade cost to $20.0 to $30.0 million (initiated). 28.
Profitability
Operating loss was $46.7 million in Q3 2026, an improvement from $95.4 million in Q3 2025 driven by the absence of impairment and restructuring charges recorded in the prior-year period 30. Gross loss widened to $24.5 million from $5.1 million, reflecting approximately $4.0 million of inventory write-downs to net realizable value and $13.0 million in losses on firm purchase commitments related to Phase 0 of the Fit Energy CEPA 30. Net loss was $44.5 million and free cash flow was negative $13.5 million for the quarter 31.
Leverage
Unrestricted cash and cash equivalents stood at $658.1 million as of July 31, 2026, up from $278.1 million as of October 31, 2025, with net debt at negative $504.5 million, representing a net cash position 30. The cash increase was supported by the underwritten public offering completed July 9, 2026, which generated net proceeds of approximately $245.5 million from the sale of 12,321,429 shares at $21.00 per share, and by the 2026 EXIM Financing yielding net proceeds of approximately $22.9 million 30. The EXIM Financing requires maintenance of a minimum unrestricted cash balance of $65.0 million, with potential reduction to $15.0 million upon satisfying specified debt service coverage and debt-to-EBITDA ratios 30.
Recurring
Generation revenues, earned from FuelCell Energy's owned power plant portfolio operating under long-term power purchase agreements, were $8.8 million in Q3 2026 30. The 62.8 MW generation portfolio as of July 31, 2026 included 7.4 MW from the Groton Project, which was not operating during the quarter and contributed to the year-over-year revenue decline from $12.4 million in Q3 2025 30. The company also services long-term service agreements with installed-base customers; the 2026 EXIM Financing of approximately $49.0 million in aggregate principal was structured specifically to support these LTSA obligations 30.
Management view
The Capital Equipment Purchase Agreement with Fit Energy USA LP covers up to 380 MW of carbonate fuel cell systems across four phases; Fit Energy holds an option for an additional 350 MW represented by $2.4 billion in Awarded Capacity Backlog, and the company's sales pipeline reached approximately 10 GW for fiscal year 2026 30 31. FuelCell signed an MOU with Siemens for the design and supply of electrical balance of plant systems to support faster deployment of 100+ MW commercial projects, and executed its first Capacity Reservation Agreement with a major data center operator for a planned 75 MW project in Texas including an upfront reservation payment 31. The Torrington, Connecticut manufacturing facility is being expanded to a 500 MW annualized production rate by June 2028 at an estimated investment of $200 to $275 million, and the company targets positive Adjusted EBITDA in Q4 fiscal 2027 30 31.
Change
Product revenues declined 29% to $33.0 million in Q3 2026 from $46.7 million in Q3 2025, driven by lower delivery and commissioning of fuel cell modules for the GGE Platform, while generation revenues fell to $8.8 million from $12.4 million as the non-operating Groton Project reduced portfolio output 30. Cumulative impairment of $42.6 million related to the Groton Project equipment upgrade was recorded over the nine months ended July 31, 2026, with an estimated $20.0 to $30.0 million of remaining investment required before the project resumes operations 30. The company acknowledged that product costs currently exceed CEPA contract pricing at its current 37.1 MW production volume, a condition expected to persist until manufacturing scale increases 31.
Risks (current)
Product costs exceed CEPA contract pricing at the current 37.1 MW production scale, creating gross margin pressure until manufacturing volumes increase sufficiently 31. The Groton Project's extended downtime has generated potential debt service coverage ratio defaults under its back leverage financing, for which lender waivers have been obtained, while the estimated remaining upgrade investment of $20.0 to $30.0 million represents continued capital commitment with uncertain timing 30. The EXIM Financings impose a $65.0 million minimum cash covenant, the company has an estimated $2.1 million repayment obligation to the State of Connecticut for failure to meet an employment obligation, and operations across the EU, UK, South Korea, Singapore, Malaysia and Thailand expose the business to international market risks 30.
New this reporting period
FuelCell Energy entered into the Capital Equipment Purchase Agreement with Fit Energy USA LP on June 22, 2026 for approximately $2.6 billion covering up to 380 MW of carbonate fuel cell systems across four phases, and closed the 2026 EXIM Financing with the Export-Import Bank of the United States for approximately $49.0 million in aggregate principal to support LTSA obligations 30. During Q3 2026, the company delivered its first two industrial-scale carbon capture modules to ExxonMobil Technology and Engineering Company in Rotterdam, and completed repowering of the Gyeonggi Green Energy fuel cell park in South Korea with delivery of six fuel cell modules, bringing the cumulative total to 42 modules delivered since 2024 31. The company signed an MOU with Siemens for electrical balance of plant systems for large commercial projects and executed its first Capacity Reservation Agreement with a major data center operator for a planned 75 MW project in Texas 31.
Advertisement

Price & Chart#

Interactive price chart (TradingView) and the trend of key figures from the core tables. The price chart loads only after a click; at that point a connection to TradingView is established.

Daily candles with news and earnings markers. Loads only on click.

Advertisement · affiliate links; we may earn a commissionAffiliate partnerships help us keep these reports free and regularly updated.
Advertisement

Share-Price Drivers#

Factors the company itself names as material for its business development (IR-based); reproduced neutrally, no price forecast and no assessment of our own.

Commercial traction of the Product line and new platform orders amid sustained cash burn
Product revenues reached FY2025 69.1 (+169%, margin 19.9%) and remained the largest reported segment in 2026-Q1 at 12.0, making product delivery the central swing factor for the top line (24, 27)
Product/platform deliveries
Product revenues FY2025 69.1 up 169% at 19.9% margin; latest quarterly Product segment 12.0 in 2026-Q1 (24, 27)
New order pipeline (stationary power, carbon capture)
Fit Energy 30 MW Phase 0 delivery planned Q4 2026 with Capital Equipment Purchase Agreement, Siemens MOU for balance-of-plant systems, and ExxonMobil carbon capture module deployment (31)
Manufacturing capacity ramp
Achievement of 100 MW annualized production rate targeted October 2026 and Torrington facility expansion to 500 MW planned June 2028 (31)
Korean fuel-cell park (Gyeonggi Green Energy)
58.8 MW long-term service agreement and repowering completion recorded in Q3 2026 (23, 31)
Advanced Technologies / SOEC electrolysis & R&D contracts
Advanced Technologies contract revenues FY2025 20.6 up 22% at 26.7% margin; SOEC platform deliveries to Idaho National Laboratory (24, 7)
Service agreements traction
Service agreements revenues FY2025 20.4 up 105% at 11.0% margin (24)

Sector trend: Demand indicators for stationary fuel-cell power and carbon-capture platforms are broadening across new counterparties (Fit Energy, Siemens, ExxonMobil), while capacity utilisation is scaling toward a 100 MW annualized rate; segment revenue growth is decelerating and reported margins remain modest (31, 24).

Advertisement

Event Timeline#

This timeline collects the material events from the original reports: guidance changes, revenue and margin signals, strategy shifts, product and M&A announcements. Events are grouped by quarter (most recent first); the grey tag before each event names the event type, the date is the publication date of the source. Management quotes open the quarter block as direct quotes. Per quarter we show the three most defining events; more can be expanded per quarter, older years are collapsed. Every event carries its source as a superscript, clickable number.

Overview: one dot per event · click jumps to the period
earningsrevenuemarginguidancestrategyfinancials2023-Q12023-Q22023-Q32023-Q42024-Q12024-Q22024-Q32024-Q42025-Q12025-Q22025-Q32025-Q42026-Q12026-Q22026-Q3
2026 · 12 events

2026-Q3 · May – Jul 2026

„The expansion of our Committed and Awarded Capacity Backlog to $3.6 billion reflects increasing customer demand for reliable, scalable infrastructure that reduces dependence on constrained transmission systems, simplifies permitting, and enables AI driven compute to be deployed faster.“ – Jason Few, President and Chief Executive Officer 31
Margin compressing 2026-09-02
Gross loss widened to $(24.5)M from $(5.1)M in Q3 2025, reflecting approximately $4.0M in inventory write-downs to net realizable value and $13.0M in losses on firm purchase commitments related to Phase 0 of the Fit Energy CEPA (30)
Guidance initiated 2026-09-02
Company targeted positive Adjusted EBITDA in Q4 fiscal 2027, subject to conversion of Awarded Capacity Backlog and continued execution of cost reduction initiatives (31)
New market 2026-09-02
Entered $2.6B Capital Equipment Purchase Agreement with Fit Energy USA LP for up to 380 MW of carbonate fuel cell systems across four phases; signed first Capacity Reservation Agreement with a major data center operator for a planned 75 MW project in Texas (30, 31)
Revenue decelerating 2026-09-02
Revenue growth decelerated to -29.3% YoY (prior period -4.8%). 30
Net cash build 2026-09-02
Net cash position expanded to 504.5 USDm from 239.0 USDm in 2026-Q2 (+111%, derived from reported financial debt minus cash). 30

2026-Q2 · Feb – Apr 2026

„This past quarter also reflected progress toward expanding the capacity of our Torrington manufacturing facility to support an annualized production rate of up to 500 MW. We believe our balance sheet, including approximately $441 million in total cash and cash equivalents as of April 30, 2026, positions us well to execute on the pipeline opportunities, scale responsibly, and create long-term value for our shareholders and stakeholders.“ – Jason Few, President and Chief Executive Officer 29
earnings 2026-06-08
Loss from operations widened to $(77.9)M from $(35.8)M in Q2 2025, driven by a $42.6M non-cash impairment charge on Groton Project equipment following SureSource 4000 performance issues requiring upgrade to standard 2.5 MW power blocks (28, 29)
Revenue decelerating 2026-06-08
Revenue declined 5% to $35.6M from $37.4M in Q2 2025; Generation revenues decreased 16% over the six-month period due to lower output from routine and non-routine maintenance and the non-operating Groton Project (28, 29)
Strategic pivot 2026-06-08
Initiated manufacturing capacity expansion at Torrington, CT facility targeting annualized production rate of 100 MW by October 2026 and 500 MW by June 2028, requiring an estimated $200 to $275 million investment over 24 months (28, 29)
Segment divergence 2026-06-08
Product revenue grew +39.2% to 18.1 USDm in 2026-Q2 (51% of group revenue) while group revenue changed -4.8%. 29

2026-Q1 · Nov 2025 – Jan 2026

„During the first fiscal quarter, we delivered strong revenue growth, sharpened operating discipline, and strengthened our liquidity position – all while positioning FuelCell Energy to capture the defining opportunity of the AI era“ – Jason Few, President and Chief Executive Officer 27 (translation – original on hover)
earnings 2026-03-09
Loss from operations improved to $(26.3)M from $(32.9)M, driven by restructuring-related reductions in administrative, selling, and R&D expenses following workforce actions in November 2024 and June 2025 (26)
Revenue accelerating 2026-03-09
Revenue increased 61% to $30.5M from $19.0M; product revenues surged from $0.1M to $12.0M driven by GGE Platform and CGN Platform module delivery and commissioning (26, 27)
New market 2026-03-09
Announced collaboration with SDCL targeting up to 450 MW of identified projects and delivered over 1.5 GW of new commercial proposals in the data center segment during the quarter (27)
2025 · 16 events

2025-Q4 · Aug – Oct 2025

„We believe that our fourth quarter performance and ongoing cost reductions have positioned us well to meet the accelerating demand for electricity and data center projects in the U.S. and internationally. Our strategy is deeply focused on the data center market where we see significant opportunities for our efficient, resilient power solutions. We've simplified our product line, advanced efficiency, and integrated absorption chilling to help manage thermal loads–critical for high-compute environments. Our sales and marketing focus is increasingly centered on data center opportunities, as we have taken deliberate steps to prepare for this market, and we are actively engaging with data center operators and infrastructure finance providers to deliver the message that we are ready to provide reliable, cost-competitive solutions for these energy-intensive applications. We will maintain our disciplined approach to growth and manufacturing capacity expansion, with the goal of leveraging our decades of utility-scale experience to deliver reliable, cost-competitive solutions for these energy-intensive applications in the future.“ – Jason Few, President and Chief Executive Officer 25 (translation – original on hover)
revenue 2025-12-18
Q4 revenue +12% to $55.0M; full-year revenue +41% to $158.2M, with product revenues surging 169% to $69.1M from GGE LTSA module deliveries (25)
Margin expanding 2025-12-18
Full-year gross margin improved to (16.7)% from (32.0)%; Q4 gross loss narrowed to $(6.6)M from $(10.9)M prior year (25)
New market 2025-12-18
30% Investment Tax Credit reinstated for fuel cells through at least 2032 under One Big Beautiful Bill Act; Section 45Q incentives increased to $85 per metric ton for carbon capture and utilization (24)
Revenue decelerating 2025-12-18
Revenue growth decelerated to +11.6% YoY (prior period +97.0%). 24
Net cash build 2025-12-18
Net cash position expanded to 158.5 USDm from 51.6 USDm in 2025-Q3 (+207%, derived from reported financial debt minus cash). 24

2025-Q3 · May – Jul 2025

„In our third fiscal quarter, we delivered meaningful revenue growth while advancing execution of our long-term strategy. We improved our core carbonate platform by increasing efficiency above 50% and focused on working to expand our opportunities in distributed generation and deepen our sales pipeline by leveraging our large-scale deployments to engage prospective data center customers. The decisive restructuring actions we implemented in June are already showing results -- lowering costs, sharpening our focus on distributed power generation, and positioning us for investment in technologies and partnerships that can unlock future growth.“ – Jason Few, President and Chief Executive Officer 23
earnings 2025-09-09
$64.5M non-cash impairment of solid oxide technology assets (goodwill, IPR&D, PP&E, inventory) drove operating loss to $95.4M from $33.6M prior year; impairment and restructuring expenses are the primary drivers (22)
Revenue accelerating 2025-09-09
Revenue +97% to $46.7M driven by $24.0M from GGE LTSA for eight fuel cell module deliveries in Korea (23)
Net debt to net cash 2025-09-09
Unrestricted cash rose to $174.7M; net cash position of $51.6M achieved, reversing net debt of $10.4M at Q2 end, aided by $38.1M in ATM equity proceeds from 6.8M shares during the quarter (22)

2025-Q2 · Feb – Apr 2025

„In our second fiscal quarter, we delivered sequential revenue growth and continued executing on the disciplined cost management strategy we initiated in late 2024, in recognition of the changing energy landscape.“ – Jason Few, President and Chief Executive Officer 21
Revenue accelerating 2025-06-06
Revenue +67% to $37.4M; product revenues of $13.0M recognized for first time, driven by $12.0M from GGE LTSA module replacements and $1.1M from Ameresco contract (21)
Strategic pivot 2025-06-06
Board approved 22% global workforce reduction (122 employees) and cessation of majority of solid oxide development efforts; refocus on carbonate-based distributed generation for data center and grid resilience applications (20)
New market 2025-06-06
Dedicated Power Partners strategic partnership with Diversified Energy Co. and TESIAC Corp. formally launched to accelerate entry into data center power market (21)

2025-Q1 · Nov 2024 – Jan 2025

„We've made measurable strides since our global restructuring was announced early in the first fiscal quarter. Our cost-saving initiatives are already yielding positive outcomes, and our commitment to uncovering and capitalizing on growth opportunities is paying off. Compared to the first quarter of last fiscal year, our revenue has grown while our expenses have declined, significantly narrowing our operating losses and accelerating our journey towards profitability. Looking ahead, we expect this quarter will be the low-water mark for our quarterly revenue for fiscal year 2025 based on our expected production and module shipment schedule, especially as it relates to our module deliveries to our customers in Korea.“ – Jason Few, President and Chief Executive Officer 19
revenue 2025-03-11
Total revenue +14% to $19.0M from $16.7M; backlog grew 28% to $1.31B from $1.03B (18)
Margin expanding 2025-03-11
Gross loss improved to $(5.2)M from $(11.7)M; gross margin (27.4)% vs. (70.2)% prior year (18)
New market 2025-03-11
Strategic partnership formed with Diversified Energy Co. and TESIAC to develop integrated fuel cell energy assets for data centers; JDA with Malaysia Marine and Heavy Engineering for large-scale electrolysis systems in Asia, New Zealand, and Australia (18)
Net cash to net debt 2025-03-11
Net debt position flipped (-16.5 to +31.1 USDm vs 2024-Q4). 18
Revenue decelerating 2025-03-11
Revenue growth decelerated to +13.8% YoY (prior period +119.1%). 18
2024 · 12 events

2024-Q4 · Aug – Oct 2024

„In the fourth quarter, our revenue more than doubled, year over year, mainly driven by module sales to Gyeonggi Green Energy Co., Ltd. in South Korea. Looking ahead, we believe that global demand for energy remains strong in markets around the world, driven by data centers, AI, cryptocurrency growth, the need for more resilient and reliable grids, and carbon recovery and capture.“ – Jason Few, President and Chief Executive Officer 16
„We have always known that the energy transition would not be linear, and we have built a portfolio of products and applications that allow FuelCell Energy to pivot when necessary. The steps announced today enable us to navigate the current market while maintaining the flexibility to capture tailwinds. These tailwinds are strengthened by power shortages in grids, high voltage transmission needs, and delays in centralized power projects due to lengthy permitting processes, which our distributed energy platforms do not experience. Additional power demand opportunities are driven by data centers, AI, cryptocurrency growth, more resilient and reliable grids, and carbon recovery and capture.“ – Jason Few, President and Chief Executive Officer 15
Revenue accelerating 2024-12-19
Q4 revenue increased 120% to $49.3M, primarily driven by $18.0M from Gyeonggi Green Energy module sales agreement and $7.7M from Ameresco contract 16
Guidance cut 2024-12-19
Company disclosed it will not meet previously provided aspirational revenue targets for FY2025 and FY2030 due to slower-than-expected hydrogen adoption and delayed commercialization timelines for SOEC, SOFC, and carbon capture products 16
Strategic pivot 2024-11-15
Global restructuring announced with 17% total workforce reduction (4% in September 2024 plus 13% in November 2024), deferred Calgary capacity expansion, and reallocation of resources toward core molten carbonate distributed power solutions to address grid deficiencies and data center demand 15

2024-Q3 · May – Jul 2024

„While we execute on our current opportunity set, we are also focused on building our sales pipeline. We believe we are positioned to capitalize on market opportunities, ranging from built-in fuel diversity which supports biogas applications and hydrogen blending, similar to our work with Ameresco in Sacramento, CA, to the growing power and absorption or electrical cooling needs of edge data centers. Our goal is to generate steady, predictable results now while keeping our focus on future growth.“ – Jason Few, President and Chief Executive Officer 14
earnings 2024-09-05
Loss from operations improved to -$33.6M from -$41.4M in prior year quarter; adjusted EBITDA improved to -$20.1M from -$31.6M, driven by lower selling, administrative, and R&D expenses 14
Revenue decelerating 2024-09-05
Total Q3 revenue decreased 7% YoY to $23.7M; Service agreement revenue declined to $1.4M from $9.8M due to absence of module exchanges in the quarter, partially offset by Generation +22% to $13.4M and Advanced Technologies +84% to $8.6M 14
New market 2024-09-05
Signed long-term service agreement with Gyeonggi Green Energy for 58.8 MW facility in Korea valued at $159.6 million, adding $126.0M to product backlog; total backlog increased 12.6% to $1.20 billion 13

2024-Q2 · Feb – Apr 2024

„Subsequent to the end of the quarter, we announced an agreement to supply Gyeonggi Green Energy Co., Ltd. (GGE) with 42 upgraded fuel cell modules, representing approximately $160 million in new backlog. In addition to the sale of these modules, under the agreement, we will also provide long term operations and maintenance services for GGE's Hwaseong Balan Industrial Complex, which is the world's largest fuel cell power platform site. Importantly, we continue to expand our manufacturing capacity and sales pipeline, while keeping a disciplined focus on cash management and the strength of our balance sheet.“ – Jason Few, President and Chief Executive Officer 12
Revenue decelerating 2024-06-10
Revenue decreased 42% YoY to $22.4M, primarily due to no module exchanges during the service period compared to twelve module exchanges in the prior year; Generation revenue increased 67% to $14.1M driven by Toyota and Derby projects 12
Guidance cut 2024-06-10
Capex guidance for FY2024 reduced to $45-60M from $60-75M due to deferral of certain Calgary expansion elements; R&D spending guidance reduced to $60-65M from $60-70M 11
Strategic pivot 2024-06-10
Nasdaq delisting notice received May 31, 2024 for non-compliance with minimum bid price requirement of $1.00 per share; company given until November 27, 2024 to regain compliance 11

2024-Q1 · Nov 2023 – Jan 2024

„It's important to note that, during the comparable prior-year quarter, we reported a one-time revenue benefit from the expiration of a material right related to an extended warranty obligation and higher service revenues from required module replacements.“ – Jason Few, President and Chief Executive Officer 10
Revenue decelerating 2024-03-07
Total revenues decreased 55% to $16.7M from $37.1M, primarily due to no product revenues and lower service agreement revenues reflecting completion of a prior-year multi-year fleet upgrade cycle 9
Margin compressing 2024-03-07
Gross loss of $11.7M versus gross profit of $5.2M in Q1 2023; margin shifted to -70.2% from +14.1%, driven by unfavorable Generation margins including $3.5M in expensed Toyota Project construction and gas costs and $1.9M derivative loss on natural gas contract 10
New market 2024-03-07
Operating generation portfolio reached 62.8 MW from 43.7 MW as Toyota Project, Derby 14.0 MW Project, and Derby 2.8 MW SCEF Project achieved commercial operations 9
2023 · 11 events

2023-Q4 · Aug – Oct 2023

„We remain fully focused on our central purpose of enabling a world empowered by clean energy by decarbonizing power and generating hydrogen.“ – Jason Few, President and CEO 8
Revenue decelerating 2023-12-19
Q4 revenues decreased 43% to $22.5 million from $39.2 million, primarily due to lower product revenues 8
Margin expanding 2023-12-19
Q4 gross loss improved to $(1.5) million from $(15.2) million in Q4 2022 8
New market 2023-12-19
ExxonMobil affiliate Esso Nederland BV announced plans to build a pilot plant in Rotterdam to test carbonate fuel cell technology for industrial carbon capture 8

2023-Q3 · May – Jul 2023

„We continue to execute on our strategy, proving our technologies in critical applications and supporting decarbonization across the globe. We believe that strong and growing demand for clean energy technologies combined with government policy support has generated significant potential in our markets.“ – Jason Few, President and Chief Executive Officer 6
Revenue decelerating 2023-09-11
Q3 revenues decreased 41% year-over-year to $25.5 million due to absence of module sales to Korea Fuel Cell Co., Ltd. compared to the prior year period 6
Margin compressing 2023-09-11
Q3 gross loss widened to $(8.2) million from $(4.2) million in the prior year quarter, primarily due to absence of higher-margin module sales 6
New market 2023-09-11
Entered 14-year long-term service agreement with Noeul Green Energy Co., Ltd. in Korea for 20 MW fuel cell park with contract value of approximately $73 million 6

2023-Q2 · Feb – Apr 2023

„Commercially, we've seen a number of trends that drive our confidence in our strategy.“ – Jason Few, President and Chief Executive Officer 4
Revenue accelerating 2023-06-08
Q2 revenues increased 134% year-over-year to $38.3 million, primarily driven by service agreements revenue from KOSPO module exchanges in Korea 4
New market 2023-06-08
Received order from ExxonMobil affiliate for fuel cell equipment and engineering support for carbon capture demonstration 4

2023-Q1 · Nov 2022 – Jan 2023

„We remain focused on executing our project backlog and growing our generation operating portfolio and expect the Toyota and Derby projects to achieve commercial operation during calendar year 2023. Regarding our continued work with ExxonMobil Technology and Engineering Company, or EMTEC, we announced in December that we have extended the term of our Joint Development Agreement through August 31, 2023, and increased the maximum amount of contract consideration to be reimbursed by EMTEC by 20%, from $50 million to $60 million. This important, long-term partnership supports our efforts to commercialize large scale fuel cell carbon capture and storage technology.“ – Jason Few, President and Chief Executive Officer 2
revenue 2023-03-09
Q1 revenues rose 17% to $37.1 million, with service agreements revenues up 541% to $13.9 million driven by new module exchanges in Woodbridge, CT and Korea 1
Margin expanding 2023-03-09
Gross result turned to profit of $5.2 million from a gross loss of $2.9 million in Q1 2022, reflecting favorable product margins and lower manufacturing variances 2
Revenue decelerating 2023-03-09
Revenue growth decelerated to +16.7% YoY (prior period +182.0%). 1
Advertisement

Key Figures ($m)#

The company's core financial figures in three views, one below the other: fiscal years (as reported; after restatements the table shows the most recent filing version, marked), half-years (6-month basis, H2 = second half on its own) and quarters (3-month basis, not cumulative). Each row is one period, most recent first. Values with a dotted underline are clickable and show the raw value, the exact source location, the scale evidence and the source; derived values additionally show their formula and inputs. All values are extracted automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original.

All figures serve only to support your own investment decision and are not a recommendation; the company's original reports are authoritative.

Revenue ($m) · annual basis, as reported
FY2023FY2023: 123123FY2024FY2024: 112112FY2025FY2025: 158158
Net income ($m) · annual basis, as reported
FY2023FY2023: -108-108FY2024FY2024: -126-126FY2025FY2025: -188-188
EPS ($) · annual basis, as reported
FY2023FY2023: -3.96-3.96FY2024FY2024: -3.92-3.92FY2025FY2025: -3.71-3.71
Operating cash flow ($m) · annual basis, as reported
FY2023FY2023: -140-140FY2024FY2024: -153-153FY2025FY2025: -125-125
Revenue ($m) · quarterly basis, as reported
2024-Q42024-Q4: 49492025-Q12025-Q1: 19192025-Q22025-Q2: 37372025-Q32025-Q3: 47472025-Q42025-Q4: 55552026-Q12026-Q1: 30302026-Q22026-Q2: 36362026-Q32026-Q3: 3333
Net income ($m) · quarterly basis, as reported
2024-Q42024-Q4: -41-412025-Q12025-Q1: -28-282025-Q22025-Q2: -38-382025-Q32025-Q3: -92-922025-Q42025-Q4: -30-302026-Q12026-Q1: -23-232026-Q22026-Q2: -78-782026-Q32026-Q3: -44-44
EPS ($) · quarterly basis, as reported
2024-Q42024-Q4: -1.28-1.282025-Q12025-Q1: -0.71-0.712025-Q22025-Q2: -0.90-0.902025-Q32025-Q3: -1.89-1.892025-Q42025-Q4: -0.59-0.592026-Q12026-Q1: -0.49-0.492026-Q22026-Q2: -1.45-1.452026-Q32026-Q3: -0.64-0.64
Operating cash flow ($m) · quarterly basis, as reported
2024-Q42024-Q4: 662025-Q12025-Q1: -46-462025-Q22025-Q2: -30-302025-Q32025-Q3: -27-272025-Q42025-Q4: -23-232026-Q12026-Q1: -34-342026-Q22026-Q2: -27-272026-Q32026-Q3: -12-12
Cash ($m) · annual basis, as reported
FY2023FY2023: 250250FY2024FY2024: 148148FY2025FY2025: 278278
Debt ($m) · annual basis, as reported
FY2023FY2023: 120120FY2024FY2024: 132132FY2025FY2025: 120120
Net Debt ($m) · annual basis, as reported
FY2023FY2023: -130-130FY2024FY2024: -16-16FY2025FY2025: -158-158
Capex ($m) · annual basis, as reported
FY2023FY2023: 3939FY2024FY2024: 4848FY2025FY2025: 1919
FCF ($m) · annual basis, as reported
FY2023FY2023: -180-180FY2024FY2024: -201-201FY2025FY2025: -144-144
D&A ($m) · annual basis, as reported
FY2023FY2023: 2525FY2024FY2024: 3636FY2025FY2025: 4040
Cash ($m) · quarterly basis, as reported
2024-Q42024-Q4: 1481482025-Q12025-Q1: 98982025-Q22025-Q2: 1161162025-Q32025-Q3: 1751752025-Q42025-Q4: 2782782026-Q12026-Q1: 3123122026-Q22026-Q2: 3733732026-Q32026-Q3: 658658
Debt ($m) · quarterly basis, as reported
2024-Q42024-Q4: 1321322025-Q12025-Q1: 1291292025-Q22025-Q2: 1261262025-Q32025-Q3: 1231232025-Q42025-Q4: 1201202026-Q12026-Q1: 1381382026-Q22026-Q2: 1341342026-Q32026-Q3: 154154
Net Debt ($m) · quarterly basis, as reported
2024-Q42024-Q4: -16-162025-Q12025-Q1: 31312025-Q22025-Q2: 10102025-Q32025-Q3: -52-522025-Q42025-Q4: -158-1582026-Q12026-Q1: -174-1742026-Q22026-Q2: -239-2392026-Q32026-Q3: -504-504
Capex ($m) · quarterly basis, as reported
2024-Q42024-Q4: 10102025-Q12025-Q1: 772025-Q22025-Q2: 552025-Q32025-Q3: 552025-Q42025-Q4: 112026-Q12026-Q1: 112026-Q22026-Q2: 222026-Q32026-Q3: 11
FCF ($m) · quarterly basis, as reported
2024-Q42024-Q4: -5-52025-Q12025-Q1: -53-532025-Q22025-Q2: -35-352025-Q32025-Q3: -32-322025-Q42025-Q4: -24-242026-Q12026-Q1: -35-352026-Q22026-Q2: -29-292026-Q32026-Q3: -14-14
D&A ($m) · quarterly basis, as reported
2024-Q42024-Q4: 992025-Q12025-Q1: 10102025-Q22025-Q2: 11112025-Q32025-Q3: 10102025-Q42025-Q4: 10102026-Q12026-Q1: 10102026-Q22026-Q2: 11112026-Q32026-Q3: 99
Shown: the most recent fiscal years. Full history since FY2016 is on record.

Fiscal years

Amounts in $m · EPS in $ per share · as reported
PeriodCalendar quarterRevenueOp. incomeNet incomeEPS ($)EBITDA (adj.)OCFSource
FY2025Q4/2024–Q4/2025158.2-192.3-187.9-3.71-74.44-125.325
FY2024Q4/2023–Q4/2024112.1-158.5-126-3.92-101.11-152.916
FY2023Q4/2022–Q4/2023123.4-136.1-107.6-3.96-102.88-140.27

Quarters

Amounts in $m · EPS in $ per share · as reported
PeriodCalendar quarterPublishedRevenueOp. incomeNet incomeEPS ($)EPS adj. ($)EBITDA (adj.)FCFCashNet DebtSource
2026-Q3*Q2–Q3/20262026-09-0233-46.7-44.5-0.64-0.64-36.7-13.5658.1-504.530
2026-Q2*Q1–Q2/20262026-06-0835.6-77.9-77.9-1.45-17.1-29373.2-23928
2026-Q1*Q4/2025–Q1/20262026-03-0930.5-26.3-22.9-0.49-17-34.7311.8-173.626
2025-Q4*Q3–Q4/20252025-12-1855-28.3-29.9-0.59*-17.7-23.9278.1-158.524
2025-Q3*Q2–Q3/20252025-09-0946.7-95.4-91.7-1.89-16.4-32.1174.7-51.622
2025-Q2*Q1–Q2/20252025-06-0637.4-35.8-38-0.90-19.3-35.2116.110.420
2025-Q1*Q4/2024–Q1/20252025-03-1119-32.9-28.3-0.71-21.1-52.898.131.118
2024-Q4*Q3–Q4/20242024-12-1949.3-41-41.4-1.28*-25.3-4.7148.1-16.516
2024-Q3*Q2–Q3/20242024-09-0523.7-33.6-32.7-1.01*-20.1-76.8159.3-34.413
2024-Q2*Q1–Q2/20242024-06-1022.4-41.4-32.1-1.19*-26.5-50.3158.8-30.911
2024-Q1*Q4/2023–Q1/20242024-03-0716.7-42.5-19.8-0.73*-29.1-68.8297.5-1809
2023-Q4*Q3–Q4/20232023-12-1922.5-36.4-30.4-1.12*-30.8-27.1250-130.57
2023-Q3*Q2–Q3/20232023-09-1125.5-41.4-24.3-0.06-0.03-47303.7-198.75
2023-Q2*Q1–Q2/20232023-06-0838.3-35.9-34.3-0.09-26-44.4246.8-166.93
2023-Q1*Q4/2022–Q1/20232023-03-0937.1-22.5-18.6-0.05-14.4-61.1315.2-2341
* derived: values with formula provenance (hover); Q4 = FY − 9M · H2 = FY − H1 · EPS via implied shares · net debt = financial debt − cash · FCF = OCF − |capex|.
EPS/EPS adj. before 2026-03-09 split-adjusted (÷2; stock split detected via implied diluted share count).
Columns not reported in this reporting cadence are hidden: Op. income (adj.), Net Debt/EBITDA (not reported in any source for these periods).
Advertisement

Balance Sheet & Cash Flow ($m)#

Point-in-time balance sheet items (e.g. cash, financial debt) and cash flow items (operating cash flow, investments/capex) per fiscal year, half-year and quarter. Balance sheet values are as of the period end, flow items cover the period. Derived values are marked and are calculated, for example, as: net debt = financial debt − cash; free cash flow = operating cash flow − capex; the click popover shows formula and inputs. All values are extracted automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original.

Fiscal years

Amounts in $m · as reported
PeriodCalendar quarterPublishedCashDebtNet DebtD&AOCFCapexFCFSource
FY2025Q4/2024–Q4/20252025-12-18278.1119.6-158.540.4-125.318.6-143.924
FY2024Q4/2023–Q4/20242024-12-19148.1131.7-16.536.2-152.947.7-200.616
FY2023Q4/2022–Q4/20232023-12-19250119.5-130.525.4-140.239.4-179.67

Quarters

Amounts in $m · as reported
PeriodCalendar quarterPublishedCashDebtNet DebtD&AOCFCapexFCFSource
2026-Q3Q2–Q3/20262026-09-02658.1153.6-504.59.4-12.21.3-13.530
2026-Q2Q1–Q2/20262026-06-08373.2134.2-23910.8-27.31.7-2928
2026-Q1Q4/2025–Q1/20262026-03-09311.8138.2-173.610.5-33.90.8-34.726
2025-Q4Q3–Q4/20252025-12-18278.1119.6-158.59.8-22.91-23.924
2025-Q3Q2–Q3/20252025-09-09174.7123.1-51.69.7-26.85.2-32.122
2025-Q2Q1–Q2/20252025-06-06116.1126.510.410.9-29.95.3-35.220
2025-Q1Q4/2024–Q1/20252025-03-1198.1129.231.19.9-45.77.1-52.818
2024-Q4Q3–Q4/20242024-12-19148.1131.7-16.58.85.810.5-4.716
2024-Q3Q2–Q3/20242024-09-05159.3125-34.49.2-63.413.4-76.813
2024-Q2Q1–Q2/20242024-06-10158.8127.9-30.99.6-37.113.2-50.311
2024-Q1Q4/2023–Q1/20242024-03-07297.5117.4-1808.6-58.310.6-68.89
2023-Q4Q3–Q4/20232023-12-19250119.5-130.56.7-15.811.3-27.17
2023-Q3Q2–Q3/20232023-09-11303.7105-198.76.6-35.811.2-475
2023-Q2Q1–Q2/20232023-06-08246.879.9-166.96.6-35.39.1-44.43
2023-Q1Q4/2022–Q1/20232023-03-09315.281.1-2345.4-53.47.8-61.11
Debt = long-term + current · Net debt = debt − cash · FCF = OCF − capex.
Advertisement

Revenue by Type (as of 2026-Q3 · USDm · 7/7)#

Revenue split by segment or product type, exactly as the company itself reports it. The basis is stated next to each value (3, 6 or 12 months); segment totals can deviate from group revenue (reconciliation/consolidation items). If the company changes its segment structure, older structures are kept in the expandable part. Rows in grey are no longer reported separately by the company; they show the last available figures and are never extrapolated.

SegmentSincePeriodBasisRevenueGrowthMarginSource
Product2022-Q42026-Q13M1227
Generation2022-Q42026-Q13M1127
Advanced Technologies2022-Q42026-Q13M4.327
Service2022-Q42026-Q13M3.227
Product revenuesFY2023FY202512M69.1169%19.9%24
Advanced Technologies contract revenuesFY2023FY202512M20.622%26.7%24
Service agreements revenuesFY2023FY202512M20.4105%11%24
Advertisement

Products & M&A (42/122 active+recent)#

Product announcements from the reports; market launches, approvals, partnerships; with first mention (date) and source. “Active/current” means: still mentioned in the most recent reports; what the company no longer mentions moves to the expandable part but is never deleted. Rows in grey are discontinued products.

Product/LineSinceStatusSource
UConn Project commercial operations expected2027-12Planned30
UConn Project - 1.125 MW molten carbonate fuel cell system2027-12Launched28
UConn 1.125 MW Project2027-12Launched26
Hartford Project - 7.4 MW fuel cell system2027-12Launched28
Hart Project commercial operations expected2027-12Planned30
Groton Project Equipment Upgrade - SureSource 4000 to standard 2.5 MW power blocks2027-12Launched28
Hartford 7.4 MW Project2027-09Launched26
Groton Project equipment upgrade2027Launched30
Phase 0 of CEPA with Fit Energy - 30 MW generating capacity2026-12Launched30
Phase 0 delivery to Fit Energy (30 MW)2026-12Launched31
Hartford Project 7.4 MW carbonate fuel cell system2026-12Planned20
Achievement of 100 MW annualized production rate2026-10Launched31
Solid oxide electrolysis platform demonstration2026-09Launched30
Gyeonggi Green Energy fuel cell park repowering completion2026-09Launched31
Torrington facility expansion to 500 MW (4x)2026-06Launched31
Standardized 12.5 MW FuelCell Energy Block2026-06Launched29
Solid Oxide Electrolysis Platform Demonstration at INL2026-03Launched26
Gyeonggi Green Energy 58.8 MW fuel cell power plant platform commissioning2026Launched22
Generation 2 Technology fuel cell module commercialization2026Launched17
Esso Rotterdam refinery pilot carbon capture project2026Launched24
UConn Project PPA amendment for 1.125 MW system2025-12Launched30
Remaining 16 1.4-MW replacement fuel cell modules for GGE Agreement expected to be commissioned in FY2026 (2x)2025-06Planned21
7.4 MW fuel cell power plant in Hartford, CT2025-06Launched21
Korea repowering project module replacements2025-04Launched21
Solid oxide electrolysis cell demonstration unit delivered to U.S. Department of Energy Idaho National Laboratory2025-03Launched19
7.4 MW Hartford, CT fuel cell power plant2025-03Launched19
Hartford Project PPA execution with Eversource and United Illuminating2025-01Launched30
Hartford Project 7.4 MW PPA2025-01Launched18
Eversource/United Illuminating Hartford 7.4 MW fuel cell power plant2025-01Planned22
University of Connecticut four 250 kW solid oxide systems2025Launched13
University of Connecticut 1 MW Solid Oxide Fuel Cell2025Launched11
Trinity College solid oxide fuel cell project2025Launched13
Toyota Motor North America Tri-gen system hydrogen generation project2025Launched24
Solid oxide electrolyzer demonstration at Idaho National Laboratory2025Launched15
Solid oxide electrolysis system demonstration at Idaho National Laboratory2025Launched20
Solid oxide electrolysis pilot program - 150 kg/day system at Idaho National Laboratory2025Launched17
Solid oxide electrolysis field demonstration at Idaho National Laboratory2025Launched24
Malaysia Marine and Heavy Engineering collaboration for low-carbon fuel production facility2025Launched24
Idaho National Laboratory Electrolysis Platform2025Launched13
Calgary manufacturing capacity expansion2025Launched13
Trinity College 250 kW Solid Oxide Fuel Cell2024-07Launched11
ExxonMobil Carbon Capture Demonstration (3x)2023-06Launched31
Trinity College 250 kW Solid Oxide Fuel Cell Power Generation System2024-12Launched9
Carbon capture technology demonstration at Port of Rotterdam2024-12Launched15
Solid oxide fuel cell platform development2024-09Launched14
Rotterdam project supplies via Esso Nederland B.V.2024-09Launched14
Electrolysis platform development2024-09Launched14
Calgary Solid Oxide Manufacturing Expansion2024-06Launched3
University of Connecticut SOFC installation2024-03Launched10
UConn 1 MW solid oxide fuel cell power generation projects modification2024-03Launched22
U.S. Department of State solid oxide electrolysis project in Ukraine2024-03Launched10
Toyota and Derby generation projects2024-03Launched16
Toyota Project commercial operation2024-03Launched18
Toyota Project2024-03Launched13
Toyota Long Beach Project2024-03Launched17
Solid oxide electrolysis platform delivery to Idaho National Laboratory2024-03Launched8
SCEF Derby 2.8 MW Project2024-03Launched17
Groton Project reached design rated output of 7.4 MW2024-03Launched17
Groton Project rated capacity achievement2024-03Launched13
University of Connecticut (UConn) 1 MW SOFC Project (four 250 kW units)2024Launched17
Trinity College solid oxide fuel cell system installation2024Launched7
Trinity College 250 kW SOFC Project2024Launched17
Solid oxide manufacturing capacity expansion to 40 MW in Calgary2024Launched7
Idaho National Laboratory Solid Oxide Electrolysis Platform2024Launched9
Derby, Connecticut projects2024Launched10
Delivery of distributed power platform to Trinity College2024Stable7
Delivery of SOEC electrolysis platform to Idaho National Laboratory2024Stable7
Completion and delivery of other two SOEC production units2024Stable7
Calgary facility solid oxide production capacity expansion2024Launched7
Additional on-site fuel cell demonstration and test unit construction in Torrington2024Launched7
Rotterdam Pilot Plant Project2023-12Launched7
INL electrolysis platform delivery2023-12Launched5
Groton Project Technical Improvement Plan2023-12Launched11
ExxonMobil pilot plant for carbon capture in Rotterdam2023-12Launched8
Derby, Connecticut fuel cell park (14.0 MW)2023-12Launched8
Derby, Connecticut 2.8 MW fuel cell project2023-12Launched8
Derby Projects commercial operation2023-12Launched18
Derby Fuel Cell Projects (14.0 MW and 2.8 MW)2023-12Launched13
Derby Connecticut 2.8 MW Project2023-12Launched6
Derby Connecticut 14.0 MW Project2023-12Launched6
Derby Connecticut 14 MW Project2023-12Launched4
Derby CT 2.8 MW Project2023-12Launched3
Derby CT 14.0 MW Project2023-12Launched17
Derby 2.8 MW SCEF project commissioning2023-12Launched7
Derby 2.8 MW SCEF Fuel Cell Project2023-12Launched9
Derby 14.0 MW project placement in service2023-12Launched7
Derby 14.0 MW Fuel Cell Project2023-12Launched19
Derby 14 MW project with United Illuminating2023-12Launched2
2.8 MW carbonate power generation project (California municipality)2023-12Launched8
2.8 MW SCEF Fuel Cell Project2023-12Launched19
1 MW solid oxide power generation project (Northeast U.S. university)2023-12Launched8
Toyota Project BioMAT program placement2023-11Launched7
Long Beach Tri-gen platform for Toyota2023-11Launched8
Toyota Project Port of Long Beach2023-10Launched3
Technology Demonstration - Carbon Capture Test Completion2023-10Launched7
U.S. solid oxide manufacturing facility expansion2023-09Launched5
Toyota Tri-generation Platform at Port of Long Beach2023-07Launched2
Toyota Project Commissioning2023-07Launched1
Toyota Long Beach Tri-gen Project2023-07Launched6
Noeul Green Energy 14-year Service Agreement2023-07Stable13
United States Solid Oxide Manufacturing Facility2023-06Launched3
Third Amendment to Connecticut Assistance Agreement2023-05Launched3
Third Amended and Restated 2018 Omnibus Incentive Plan2023-05Launched3
Amended and Restated Employee Stock Purchase Plan2023-05Launched3
U.S. Navy Submarine Base Groton Project2023-03Launched2
Trinity College Distributed Power Platform Delivery2023-03Launched5
Derby Project Commercial Operations2023-03Launched1
Trinity College Hartford Solid Oxide Power Platform2023Launched4
Trinity College Hartford Distributed Power Platform Delivery2023Launched3
Pilot program award for 150 kg/day solid oxide electrolysis system at Idaho National Laboratory2023Launched7
Idaho National Laboratory Solid Oxide Electrolysis Unit2023Launched4
Idaho National Laboratory Electrolysis Platform Delivery2023Launched3
Groton Project2023Launched3
Electrolysis platform delivery to Idaho National Laboratory2023Launched2
Distributed power platform delivery to Trinity College Hartford2023Launched2
Calgary capacity expansion - four units construction and delivery2023Launched5
250 kW Power Generation Platform (2×)2023Stable7
1 MW High-Efficiency Electrolysis Platform (4×)2023Stable7
Groton Project Commercial Operations2022-12Launched7
Advertisement

M&A (45)#

All recorded acquisitions (purchases) and divestitures/exits with date, short description and source; deliberately including smaller transactions that summaries often miss. Purchase prices appear only where the company itself has disclosed them. Rows in grey are cancelled transactions; the cancellation date is shown in the row.

Acquisitions · 40Divestitures/exits · 4older: 1 (in the table)
202420252026

Acquisitions

Transaction / stakeDateTypeSource
Siemens MOU for electrical balance of plant systems2026-09Completed31
Data Center Capacity Reservation Agreement with major operator2026-09Announced31
Collaboration with Sustainable Development Capital LLP (SDCL)2026-03Completed27
2026 EXIM Financing (2×)2025-11Completed30
2025 EXIM Financing with Export-Import Bank (3×)2025-11Completed25
CGN-Yulchon Generation Co., Ltd. long-term service agreement (3×)2025-07Announced25
Joint Development Agreement with Malaysia Marine and Heavy Engineering Sdn Bhd (2×)2025-03Announced18
Diversified Energy Co. PLC and TESIAC data center partnership (3×)2025-03Completed18
Power Purchase Agreement with Eversource and United Illuminating for Hartford Project (7.4 MW, Hartford Connecticut)2025-01Announced24
Power purchase agreement with Eversource and United Illuminating for Hartford Project2025Announced23
Eversource and United Illuminating 20-year power purchase agreement for 7.4 MW Hartford, Connecticut fuel cell plant2025Announced25
At-the-market offering program: 25.6 million shares sold at $7.44 average price ($185.7 million net proceeds)2025Completed24
Gyeonggi Green Energy Co., Ltd. Hwaseong Balan Industrial Complex repowering project2024-09Completed14
Ameresco Sacramento, CA fuel cell and biogas project2024-06Completed14
Ameresco Sacramento Sewer District 2.8 MW project (4×)2024-06Completed22
GGE LTSA Module Deliveries and Commissioning (7×)2024-05Completed20
ExxonMobil Technology and Engineering Company carbon capture joint development (2×)2024-04Completed19
Amended Open Market Sale Agreement with Jefferies and other agents2024-04Announced11
Agreement with Ameresco, Inc. for Sacramento Sewer district energy delivery platform2024-04Announced12
Esso purchase order (2×)2024-03Completed10
EMTEC Rotterdam project2024Completed16
Open Market Share Sale Agreement (2×)2023-12Announced25
Franklin Park tax equity financing for Derby Projects (2×)2023-10Completed8
Groton Back Leverage Senior and Subordinated Loans (3×)2023-08Completed7
EMTEC Joint Development Agreement (8×)2023-08Announced7
Derby Back Leverage Financing (2×)2023-08Completed30
Chart Industries Memorandum of Understanding for Carbon Capture and Hydrogen Solutions2023-06Completed4
OpCo Financing Facility (3×)2023-05Completed30
Interest Rate Swap Agreements (2×)2023-05Announced26
$87 million Non-Recourse Project Financing Facility2023-05Completed4
Planned 400 MW U.S. Solid Oxide Manufacturing Facility2023-03Completed1
Collaboration agreement with Malaysia Marine and Heavy Engineering on large-scale electrolyzer facilities2023-03Announced2
Calgary Facility Phase 1 Completion - 40 MW Annual Solid Oxide Production Capacity2023-03Completed1
Versa Ltd. Calgary Facility Expansion2023-02Completed1
Calgary facility lease expansion and extension (3×)2023-02Completed7
EMTEC License Agreement2019-06Announced7

Divestitures / exits

Transaction / stakeDateTypeSource
Trinity College 250 kW solid oxide fuel cell project termination2025-05Divested20
Trinity College 250 kW solid oxide fuel cell power generation project termination2025-05Divested22
Termination of PPA with Trinity College for 250 kW solid oxide fuel cell project2025-05Divested24
Solid oxide platform development discontinuation; focus shift to electrolysis technology demonstration2024-11Divested24

Terminated / withdrawn

Transaction / stakeDateTypeSource
Fit Energy Capital Equipment Purchase Agreement (2x)2026-06Terminated31
Gyeonggi Green Energy Co., Ltd. - Module Replacement Agreement2024-09Terminated16
Agreement to supply Gyeonggi Green Energy Co., Ltd. with 42 upgraded fuel cell modules and long-term operations and maintenance services2024-05Terminated12
Long-Term Service Agreement with Gyeonggi Green Energy for GGE Hwaseong Baran facility replacement (22 fuel cell modules)2024Terminated24
Gyeonggi Green Energy Long-Term Service Agreement (5x)2023Terminated17
Advertisement

Reported KPIs (as disclosed) (717)#

Figures the company discloses itself in addition to the standard financials; order intake, recurring revenue, user or unit counts, adjusted measures. These “story KPIs” usually slip through standard databases; here they are collected as reported, with no calculation of our own. Important: the definition comes from the company itself and can differ from firm to firm; period and source are stated next to every value.

Company-specific KPIs verbatim from the filings (English, as disclosed; not normalised). Balance-sheet and boilerplate items filtered.
DatePeriodKPIValue / changeSource
2026-09-022026-Q3Unrestricted cash and cash equivalents658.1 million30
2026-09-022026-Q3Total project assets166.6 million30
2026-09-022026-Q3Other income, net (Q3 2026)0.7 million30
2026-09-022026-Q3Other income, net (9M 2026)1.8 million30
2026-09-022026-Q3Net loss per common share (Q3 2026)0.6430
2026-09-022026-Q3Net loss per common share (Q3 2025)3.7830
2026-09-022026-Q3Net loss per common share (9M 2026)2.5630
2026-09-022026-Q3Net loss per common share (9M 2025)7.2230
2026-09-022026-Q3Net debt outstanding related to project assets97.5 million30
2026-09-022026-Q3Interest income (Q3 2026)3.6 million30
2026-09-022026-Q3Interest income (9M 2026)8.6 million30
2026-09-022026-Q3Interest expense (Q3 2026)2.9 million30
2026-09-022026-Q3Interest expense (9M 2026)8.5 million30
2026-09-022026-Q3generation portfolio MW62.8 MW30
2026-09-022026-Q3committed service agreements backlog263.6 million30
2026-09-022026-Q3committed product backlog108.9 million30
2026-09-022026-Q3committed generation backlog915.7 million30
2026-09-022026-Q3committed advanced technologies contract backlog7.8 million30
2026-09-022026-Q3awarded capacity service agreements backlog1.3 billion30
2026-09-022026-Q3annualized production rate three months ended July 31 202637.1 MW30
2026-09-022026-Q3annualized production rate three months ended July 31 202533.2 MW30
2026-09-022026-Q3annualized production rate nine months ended July 31 202635.4 MW30
2026-09-022026-Q3annualized production rate nine months ended July 31 202530.5 MW30
2026-09-022026-Q3unrestricted cash and cash equivalents658.1 million30
2026-09-022026-Q3unrestricted cash and cash equivalents$658.1 million31
2026-09-022026-Q3Torrington facility expansion target500 MW31
2026-09-022026-Q3sales pipeline10 gigawatts31
2026-09-022026-Q3restricted cash and cash equivalents79.2 million30
2026-09-022026-Q3restricted cash and cash equivalents$79.2 million31
2026-09-022026-Q3pledged cash and cash equivalents for performance security79.2 million30
2026-09-022026-Q3outstanding letters of credit12.7 million30
2026-09-022026-Q3generation portfolio62.8 MW30
2026-09-022026-Q3company-funded R&D expenses incurred (nine months ended July 31, 2026)23.2 million30
2026-09-022026-Q3committed backlog$1.3 billion31
2026-09-022026-Q3committed advanced technologies contract backlog7.8 million30
2026-09-022026-Q3Cash, cash equivalents, restricted cash and restricted cash equivalents$737.3 million31
2026-09-022026-Q3Cash and cash equivalents and restricted cash737.3 million30
2026-09-022026-Q3Awarded Capacity Backlog$2.4 billion31
2026-09-022026-Q3Annualized production rate100 MW31
2026-06-082026-Q2US government funded backlog$4.9 million28
2026-06-082026-Q2Restricted cash$67.7 million28
2026-06-082026-Q2Non-US government funded backlog$10.5 million28
2026-06-082026-Q2Letters of credit outstanding$12.7 million28
2026-06-082026-Q2Generation portfolio62.8 MW28
2026-06-082026-Q2Advanced technologies contract backlog$15.4 million28
2026-06-082026-Q2unrestricted cash and cash equivalents373.2 million28
2026-06-082026-Q2Total project assets167.5 million28
2026-06-082026-Q2Total backlog1.14 billion28
2026-06-082026-Q2Torrington facility current maximum capacity100 MW per year28
2026-06-082026-Q2Service agreements backlog155.4 million28
2026-06-082026-Q2sales pipeline4 gigawatts29
2026-06-082026-Q2restricted cash and cash equivalents67.7 million28
2026-06-082026-Q2Projects in development assets1.1 million28
2026-06-082026-Q2Projects in development8.5 MW28
2026-06-082026-Q2Product backlog36.1 million28
2026-06-082026-Q2Pledged cash collateral67.7 million28
2026-06-082026-Q2Non-current restricted cash51.1 million28
2026-06-082026-Q2Net debt outstanding related to project assets99.8 million28
2026-06-082026-Q2Hub and spoke model target capacity1.5 to 2.0 GW28
2026-06-082026-Q2Generation portfolio capacity62.8 MW28
2026-06-082026-Q2Generation backlog928.5 million28
2026-06-082026-Q2Current restricted cash16.6 million28
2026-06-082026-Q2Completed, operating installations166.4 million28
2026-06-082026-Q2Cash and cash equivalentsapproximately $441 million29
2026-06-082026-Q2Backlog$1.14 billion29
2026-06-082026-Q2Annualized production rate (three months ended April 30, 2026)36.4 MW28
2026-06-082026-Q2Annualized production rate (six months ended April 30, 2026)34.5 MW28
2026-06-082026-Q2Advanced Technologies contract backlog15.4 million28
2026-03-092026-Q1U.S. government funded backlog$5.1 million26
2026-03-092026-Q1Total project assets211,000 (USD in thousands)26
2026-03-092026-Q1Total backlog1,171,200 (USD in thousands)26
2026-03-092026-Q1Service agreements backlog159,400 (USD in thousands)26
2026-03-092026-Q1Restricted cash pledged$67.8 million26
2026-03-092026-Q1Restricted cash OpCo obligations$25.3 million26
2026-03-092026-Q1Restricted cash Groton senior obligations$12.8 million26
2026-03-092026-Q1Restricted cash Derby obligations$3.0 million26
2026-03-092026-Q1Restricted cash Crestmark obligations$2.9 million26
2026-03-092026-Q1Restricted cash and cash equivalents67,800 (USD in thousands)26
2026-03-092026-Q1Product backlog54,100 (USD in thousands)26
2026-03-092026-Q1Outstanding Letters of Credit$12.7 million26
2026-03-092026-Q1Operating Power Plants Capacity62.8 MW26
2026-03-092026-Q1Non-U.S. Government Funded Backlog$13.1 million26
2026-03-092026-Q1Net Debt Related to Project Assets102,700 (USD in thousands)26
2026-03-092026-Q1Gross Margin Service Agreements11.5%26
2026-03-092026-Q1Gross Margin Product-36.1%26
2026-03-092026-Q1Gross Margin Generation-28.2%26
2026-03-092026-Q1Gross Margin Advanced Technologies28.6%26
2026-03-092026-Q1Generation Operating Portfolio62.8 MW26
2026-03-092026-Q1Generation Backlog939,50026
2026-03-092026-Q1Finance Obligation Balance$18.8 million26
2026-03-092026-Q1Depreciation of Project Assets and Generation Intangible8,70026
2026-03-092026-Q1D&A10,50026
2026-03-092026-Q1Cash and Cash Equivalents Pledged as Collateral67,800 (USD in thousands)26
2026-03-092026-Q1Annualized Production Rate32.6 MW26
2026-03-092026-Q1Advanced technologies contract backlog18,200 (USD in thousands)26
2026-03-092026-Q1Restricted Cash and Cash Equivalents Short-Term$17,67527
2026-03-092026-Q1Restricted Cash and Cash Equivalents Long-Term$50,14727
2026-03-092026-Q1Cash and Cash Equivalents Unrestricted$311,77827
2026-03-092026-Q1Backlog Service$159,39327
2026-03-092026-Q1Backlog Product$54,11327
2026-03-092026-Q1Backlog Generation$939,52527
2026-03-092026-Q1Backlog Advanced Technologies$18,21027
2026-03-092026-Q1Backlog$1,171,24127
2025-12-18FY2025Versa US Patents1924
2025-12-18FY2025Versa Pending US Applications1324
2025-12-18FY2025Versa Pending International Applications2424
2025-12-18FY2025Versa International Patents6324
2025-12-18FY2025US Patents15224
2025-12-18FY2025Unrestricted Cash and Equivalents278.1 (USD millions)24
2025-12-18FY2025Total backlog1.19 (USD billions)24
2025-12-18FY2025Torrington Facility Maximum Capacity100 MW24
2025-12-18FY2025Torrington Facility Estimated Capacity with Investments350 MW24
2025-12-18FY2025Torrington Facility Annualized Production Rate41 MW24
2025-12-18FY2025System Target Design Life25-30 years24
2025-12-18FY2025South Korea Clean Hydrogen Portfolio Standard Hydrogen Share 20367.1%24
2025-12-18FY2025South Korea Clean Hydrogen Portfolio Standard Hydrogen Share 20302.1%24
2025-12-18FY2025Solid Oxide Electrolysis System Efficiency40-45 kWh/kg24
2025-12-18FY2025Solid Oxide Electrolysis Stack Efficiency34 kWh/kg24
2025-12-18FY2025Service agreements backlog162.4 (USD millions)24
2025-12-18FY2025Section 45Q Carbon Capture Credit$8524
2025-12-18FY2025Safety Experience Modification Rate 20250.8424
2025-12-18FY2025Safety Experience Modification Rate 20240.8324
2025-12-18FY2025Safety Experience Modification Rate 20230.8924
2025-12-18FY2025safety experience modification rate 20220.08824
2025-12-18FY2025safety experience modification rate 20210.6824
2025-12-18FY2025safety experience modification rate 20200.5924
2025-12-18FY2025safety experience modification rate 20190.6524
2025-12-18FY2025Product backlog66.2 (USD millions)24
2025-12-18FY2025power plant recyclable percentage93%24
2025-12-18FY2025power density33 MW24
2025-12-18FY2025pending US patent applications2924
2025-12-18FY2025pending international patent applications7924
2025-12-18FY2025net debt from project assets106.1 (USD millions)24
2025-12-18FY2025manufacturing facility size Torrington167,00024
2025-12-18FY2025loss accruals service agreements8.4 million24
2025-12-18FY2025joint development agreement expected annual budget$10.0 million24
2025-12-18FY2025ITA throughput at least$10.0 million24
2025-12-18FY2025investment tax credit rate30%24
2025-12-18FY2025international patents31924
2025-12-18FY2025hydrogen purity99.85%24
2025-12-18FY2025government funding percentage FY20252%24
2025-12-18FY2025government funding percentage FY20244%24
2025-12-18FY2025government funding percentage FY20233%24
2025-12-18FY2025Generation Operating Portfolio62.824
2025-12-18FY2025Generation Backlog945.224
2025-12-18FY2025FuelCell Energy Solutions licensed US patents224
2025-12-18FY2025FuelCell Energy Solutions licensed international patents724
2025-12-18FY2025fuel cell modules target design life5-7 years24
2025-12-18FY2025European facility capacity20 MW24
2025-12-18FY2025Esso purchase order value$11.6 million24
2025-12-18FY2025Emtec license agreement payment$10 million24
2025-12-18FY2025data center electricity demand projection 2030945 terawatt-hours24
2025-12-18FY2025CHP system efficiency80%24
2025-12-18FY2025carbonate fuel cell electrical efficiency50%24
2025-12-18FY2025carbonate fuel cell average efficiency47%24
2025-12-18FY2025carbon capture NOx reduction70%24
2025-12-18FY2025annualized production rate MW31.524
2025-12-18FY2025Advanced technologies contract backlog19.5 (USD millions)24
2025-12-18FY2025unrestricted cash and cash equivalents$278.1 million25
2025-12-18FY2025Total cash, restricted cash and short-term investments$341.8 million25
2025-12-18FY2025Backlog$1.19 billion25
2025-12-18FY20253TG minerals percentage FY20240.001207%24
2025-09-092025-Q3sale leaseback finance obligations outstanding balance18.8 million22
2025-09-092025-Q3sale leaseback finance obligations imputed interest11.6 million22
2025-09-092025-Q3Restricted cash pledged62.2 million22
2025-09-092025-Q3restricted cash OpCo Financing20.9 million22
2025-09-092025-Q3restricted cash Groton Senior Back Leverage14.0 million22
2025-09-092025-Q3restricted cash Derby Back Leverage1.8 million22
2025-09-092025-Q3restricted cash Crestmark sale leaseback2.9 million22
2025-09-092025-Q3natural gas gains three months ended July 31 20251.0 million22
2025-09-092025-Q3natural gas gains nine months ended July 31 20252.0 million22
2025-09-092025-Q3Letters of credit outstanding14.2 million22
2025-09-092025-Q3letters of credit expire throughOctober 202922
2025-09-092025-Q3interest rate swap fixed rate3.716%22
2025-09-092025-Q3Generation Operating Portfolio62.8 MW22
2025-09-092025-Q3fuel price sensitivity renewable natural gas2.0 million22
2025-09-092025-Q3fuel price sensitivity natural gas26,00022
2025-09-092025-Q3Total project assets224.5 (USD million)22
2025-09-092025-Q3Total backlog1.24 (USD billion)22
2025-09-092025-Q3Total Cash, Restricted Cash and Short-Term Investments$236.9 million23
2025-09-092025-Q3Service agreements backlog169.4 (USD million)22
2025-09-092025-Q3Service Agreements Backlog$169.4 million23
2025-09-092025-Q3restricted cash and cash equivalents62.2 (USD million)22
2025-09-092025-Q3Restricted Cash and Cash Equivalents - Short-term16,092 (USD in thousands)23
2025-09-092025-Q3Restricted Cash and Cash Equivalents - Long-term46,100 (USD in thousands)23
2025-09-092025-Q3Projects in development7.422
2025-09-092025-Q3Product backlog96.2 (USD million)22
2025-09-092025-Q3Product Backlog$96.2 million23
2025-09-092025-Q3Pledged cash and cash equivalents (performance security)62.2 (USD million)22
2025-09-092025-Q3Outstanding finance obligations under sale-leaseback18.822
2025-09-092025-Q3Operating portfolio capacity (MW)62.822
2025-09-092025-Q3OpCo Financing swap fixed rate3.716%22
2025-09-092025-Q3OpCo Financing net interest rate thereafter6.866%22
2025-09-092025-Q3OpCo Financing net interest rate first four years6.366%22
2025-09-092025-Q3OpCo Financing letter of credit issued6.5 million22
2025-09-092025-Q3OpCo Financing hedge notional minimum75%22
2025-09-092025-Q3OpCo Financing hedge notional maximum105%22
2025-09-092025-Q3OpCo Financing fair value adjustment three months ended July 31 20250.6 million22
2025-09-092025-Q3OpCo Financing fair value adjustment nine months ended July 31 2025-0.2 million22
2025-09-092025-Q3OpCo Financing debt service reserve minimumsix months22
2025-09-092025-Q3OpCo Financing capital expenditures reserve total29.0 million22
2025-09-092025-Q3OpCo Financing capital expenditures reserve funded at closing14.5 million22
2025-09-092025-Q3OpCo Financing Term Loan maturityMay 19, 203022
2025-09-092025-Q3OpCo Financing Term Loan drawn80.5 million22
2025-09-092025-Q3OpCo Financing Term Loan Facility amount80.5 million22
2025-09-092025-Q3OpCo Financing LC Facility amount6.5 million22
2025-09-092025-Q3OpCo Financing DSCR requirement1.20:1.0022
2025-09-092025-Q3OpCo Financing Applicable Margin SOFR thereafter3%22
2025-09-092025-Q3OpCo Financing Applicable Margin SOFR first four years2.5%22
2025-09-092025-Q3OpCo Financing Applicable Margin Base Rate thereafter2%22
2025-09-092025-Q3OpCo Financing Applicable Margin Base Rate first four years1.5%22
2025-09-092025-Q3Net debt outstanding related to project assets109.0 (USD million)22
2025-09-092025-Q3Groton Total DSCR requirement1.10:1.0022
2025-09-092025-Q3Groton Subordinated Back Leverage maturitySeptember 30, 203822
2025-09-092025-Q3Groton Subordinated Back Leverage interest rate before Step Down Date8%22
2025-09-092025-Q3Groton Subordinated Back Leverage Loan Facility amount8.0 million22
2025-09-092025-Q3Groton Senior Back Leverage maturityAugust 18, 203022
2025-09-092025-Q3Groton Senior Back Leverage Loan Facility amount12.0 million22
2025-09-092025-Q3Groton Senior Back Leverage Liberty Lender interest rate6.75%22
2025-09-092025-Q3Groton Senior Back Leverage DSCR requirement1.20:1.0022
2025-09-092025-Q3Groton Senior Back Leverage Amalgamated Lender interest rate with Carbon Offset Event7.32%22
2025-09-092025-Q3Groton Senior Back Leverage Amalgamated Lender interest rate no Carbon Offset Event6.07%22
2025-09-092025-Q3Groton Interest Only Period84 months or until Groton Senior Back Leverage Loan fully repaid22
2025-09-092025-Q3Groton Back Leverage total drawn20.0 million22
2025-09-092025-Q3Generation backlog955.022
2025-09-092025-Q3Generation Backlog$955.0 million23
2025-09-092025-Q3Future required payments (principal and interest)126.522
2025-09-092025-Q3EXIM Financing term7 years22
2025-09-092025-Q3EXIM Financing net proceeds9.2 million22
2025-09-092025-Q3EXIM Financing interest rate5.81%22
2025-09-092025-Q3EXIM Financing gross proceeds10.1 million22
2025-09-092025-Q3Derby Subordinated Back Leverage maturityMarch 31, 203822
2025-09-092025-Q3Derby Subordinated Back Leverage interest rate8%22
2025-09-092025-Q3Derby Subordinated Back Leverage Loan Facility amount3.5 million22
2025-09-092025-Q3Derby Senior Back Leverage maturityMarch 31, 203122
2025-09-092025-Q3Derby Senior Back Leverage interest rate7.25%22
2025-09-092025-Q3Derby Senior Back Leverage Loan Facility amount9.5 million22
2025-09-092025-Q3Derby Back Leverage total drawn13.0 million22
2025-09-092025-Q3Connecticut Loan term15 years22
2025-09-092025-Q3Connecticut Loan repayment penalty2.1 million22
2025-09-092025-Q3Connecticut Loan penalty per position below Employment Obligation14,225.00 (USD thousands)22
2025-09-092025-Q3Connecticut Loan interest rate2.0%22
2025-09-092025-Q3Connecticut Loan forgiveness amount if Employment Obligation met2.0 million22
2025-09-092025-Q3Connecticut Loan amount10.0 million22
2025-09-092025-Q3Cash and Cash Equivalents, Unrestricted174,662 (USD in thousands)23
2025-09-092025-Q3Backlog$1.24 billion23
2025-09-092025-Q3Annualized production rate (nine months 2025)30.522
2025-09-092025-Q3Annualized production rate (nine months 2024)31.122
2025-09-092025-Q3Annualized production rate (Q3 2025)33.222
2025-09-092025-Q3Annualized production rate (Q3 2024)29.322
2025-09-092025-Q3Advanced Technologies contract backlog non US Government17.5 million22
2025-09-092025-Q3Advanced Technologies contract backlog US Government6.8 million22
2025-09-092025-Q3Advanced Technologies contract backlog24.3 (USD million)22
2025-09-092025-Q3Advanced Technologies contract backlog24.3 million22
2025-09-092025-Q3Advanced Technologies Backlog$24.3 million23
2025-06-062025-Q2Restricted cash63.1 million20
2025-06-062025-Q2Outstanding Letters of Credit14.2 million20
2025-06-062025-Q2Non-U.S. Government funded backlog22.0 million20
2025-06-062025-Q2Generation Operating Portfolio62.8 MW20
2025-06-062025-Q2Finance obligation sale leaseback18.8 million20
2025-06-062025-Q2unrestricted cash and cash equivalents116.1 million20
2025-06-062025-Q2U.S. Treasury Securities carrying value60.9 million20
2025-06-062025-Q2U.S. Treasury Securities60.9 million20
2025-06-062025-Q2U.S. Government funded backlog7.6 million20
2025-06-062025-Q2Total project assets228.2 million20
2025-06-062025-Q2Total cash and restricted cash179.1 million20
2025-06-062025-Q2Total backlog1.26 billion20
2025-06-062025-Q2Service agreements backlog164.4 million20
2025-06-062025-Q2Product backlog98.2 million20
2025-06-062025-Q2Operating MW capacity62.8 MW20
2025-06-062025-Q2Net debt related to project assets112.1 million20
2025-06-062025-Q2Generation backlog967.4 million20
2025-06-062025-Q2Backlog1,259,597 (USD in thousands)21
2025-06-062025-Q2Annualized production rate30.6 MW20
2025-06-062025-Q2Advanced Technologies contract backlog29.6 million20
2025-06-062025-Q2Advanced Technologies contract backlog29.6 million20
2025-03-112025-Q1US Treasury Securities Weighted Average Yield4.30%18
2025-03-112025-Q1US Treasury Securities Carrying Value110.3 million18
2025-03-112025-Q1Restricted Cash Total62.4 million18
2025-03-112025-Q1Restricted Cash OpCo Financing25.5 million18
2025-03-112025-Q1Restricted Cash Groton Senior Back Leverage10.8 million18
2025-03-112025-Q1Restricted Cash Derby Back Leverage2.3 million18
2025-03-112025-Q1Restricted Cash Crestmark Sale Leaseback2.9 million18
2025-03-112025-Q1Outstanding Letters of Credit14.2 million18
2025-03-112025-Q1OpCo Financing SOFR Margin Thereafter3%18
2025-03-112025-Q1OpCo Financing SOFR Margin First Four Years2.5%18
2025-03-112025-Q1OpCo Financing Quarterly Principal Amortization Periodquarter ending June 2025 through quarter ending March 202618
2025-03-112025-Q1OpCo Financing Quarterly Principal Amortization675,000 per quarter18
2025-03-112025-Q1OpCo Financing Net Interest Rate Thereafter6.866%18
2025-03-112025-Q1OpCo Financing Net Interest Rate Four Years6.366%18
2025-03-112025-Q1OpCo Financing Fixed Rate Swap3.716%18
2025-03-112025-Q1OpCo Financing Facility Total Net Proceeds Company46.1 million18
2025-03-112025-Q1OpCo Financing Facility Total Capital Expenditure Reserve Target29.0 million18
2025-03-112025-Q1OpCo Financing Facility Term Loan80.5 million18
2025-03-112025-Q1OpCo Financing Facility Net Proceeds77.6 million18
2025-03-112025-Q1OpCo Financing Facility LC Facility6.5 million18
2025-03-112025-Q1OpCo Financing Facility Fees and Transaction Costs2.9 million18
2025-03-112025-Q1opco financing facility capital expenditure reserve14.5 million18
2025-03-112025-Q1opco financing debt service coverage ratio1.20:1.0018
2025-03-112025-Q1opco financing base rate margin thereafter2%18
2025-03-112025-Q1opco financing base rate margin first four years1.5%18
2025-03-112025-Q1interest rate swap fair value loss$(3.5) million18
2025-03-112025-Q1interest rate swap fair value gain0.9 million18
2025-03-112025-Q1Groton unrestricted cash6.8 million18
2025-03-112025-Q1Groton total debt service coverage ratio1.10:1.0018
2025-03-112025-Q1Groton subordinated principal payment excess cash flow50%18
2025-03-112025-Q1Groton subordinated interest rate step down8%18
2025-03-112025-Q1Groton subordinated interest rate post step down floor5%18
2025-03-112025-Q1Groton subordinated DSCR reserve0.3 million18
2025-03-112025-Q1Groton subordinated back leverage loan facility8.0 million18
2025-03-112025-Q1Groton senior operations maintenance reserve6.5 million18
2025-03-112025-Q1Groton senior interest rate Liberty6.75%18
2025-03-112025-Q1Groton senior interest rate Amalgamated no carbon offset6.07%18
2025-03-112025-Q1Groton senior interest rate Amalgamated carbon offset7.32%18
2025-03-112025-Q1Groton senior DSCR reserve accounts1.7 million18
2025-03-112025-Q1Groton senior debt service coverage ratio1.20:1.0018
2025-03-112025-Q1Groton senior back leverage loan facility12.0 million18
2025-03-112025-Q1Groton Released to Parent11.1 million18
2025-03-112025-Q1Groton Output Shortfall Payments1.3 million18
2025-03-112025-Q1Groton Back Leverage Total Drawn20.0 million18
2025-03-112025-Q1Groton Back Leverage Net Proceeds19.6 million18
2025-03-112025-Q1Groton Back Leverage Fees and Transaction Costs0.4 million18
2025-03-112025-Q1Generation Operating Portfolio62.8 MW18
2025-03-112025-Q1Finance Obligation Imputed Interest10.9 million18
2025-03-112025-Q1Finance Obligation Balance18.8 million18
2025-03-112025-Q1Connecticut State Loan Penalty per Position14,225.00 (USD thousands)18
2025-03-112025-Q1Connecticut State Loan Interest Rate2.0%18
2025-03-112025-Q1Connecticut State Loan Initial Disbursement10.0 million18
2025-03-112025-Q1Connecticut State Loan Forgiveness Eligible5.0 million18
2025-03-112025-Q1Connecticut State Loan Estimated Penalty2.1 million18
2025-03-112025-Q1Connecticut State Loan Employment Obligation Third Amendment538 retained18
2025-03-112025-Q1Connecticut State Loan Employment Obligation Second Amendment538 continuously maintained18
2025-03-112025-Q1Connecticut State Loan Employment Obligation Original165 created and 538 retained18
2025-03-112025-Q1Connecticut State Loan Credit Second Amendment2.0 million18
2025-03-112025-Q1Advanced Technologies US Government Funded8.2 million18
2025-03-112025-Q1Advanced Technologies Non-US Government Funded23.4 million18
2025-03-112025-Q1Advanced technologies contract backlog31.6 million18
2025-03-112025-Q1Unrestricted Cash and Cash Equivalents$98.1 million18
2025-03-112025-Q1Unrestricted Cash and Cash Equivalents$98,07019
2025-03-112025-Q1US Treasury Securities$110.3 million18
2025-03-112025-Q1Total Project Assets$236.7 million18
2025-03-112025-Q1Total Backlog$1.31 billion18
2025-03-112025-Q1Short-term Investments$110,29819
2025-03-112025-Q1Service Backlog$172,32619
2025-03-112025-Q1Service Agreements Backlog$172.3 million18
2025-03-112025-Q1Restricted Cash and Cash Equivalents$62,35219
2025-03-112025-Q1Restricted Cash$62.4 million18
2025-03-112025-Q1Product Backlog$111.2 million18
2025-03-112025-Q1Product Backlog$111,21119
2025-03-112025-Q1Net Debt Project Assets$114.3 million18
2025-03-112025-Q1Generation MW Operating62.818
2025-03-112025-Q1Generation Backlog$997.4 million18
2025-03-112025-Q1Generation Backlog$997,39719
2025-03-112025-Q1Backlog$1,312,50019
2025-03-112025-Q1Advanced Technologies Backlog$31.6 million18
2025-03-112025-Q1Advanced Technologies Backlog$31,56619
2024-12-27FY2024Loss Accruals on Service Agreements$9.0 million17
2024-12-27FY2024Foreign Currency Portion of Cash and Cash Equivalentsapproximately 1%17
2024-12-27FY2024Versa Pending U.S. Patent Applications1317
2024-12-27FY2024Versa Patent Applications Pending in Other Jurisdictions3017
2024-12-27FY2024Versa International Patents6817
2024-12-27FY2024Versa U.S. Patents1917
2024-12-27FY2024U.S. Patents Held (Excluding Subsidiaries)14817
2024-12-27FY2024U.S. Grid Transmission Line Losses Averageabout 5%17
2024-12-27FY2024U.S. Treasury Securities Weighted Average Yield to Maturity4.78%17
2024-12-27FY2024U.S. Treasury Securities carrying value$109.1 million17
2024-12-27FY2024Torrington Facility Sized for Eventual Capacityup to 200 MW per year17
2024-12-27FY2024Torrington Facility Size167,000 square feet17
2024-12-27FY2024Torrington Facility Maximum Annualized Capacity100 MW per year17
2024-12-27FY2024Torrington Facility Annualized Production Rate27.7 MW per year17
2024-12-27FY2024Taufkirchen facility module assembly capabilityup to 20 MW per year17
2024-12-27FY2024Solid Oxide SOEC Manufacturing Capacity Potentialup to 80 MW per year17
2024-12-27FY2024Service Agreements Weighted Average Termapproximately 16 years17
2024-12-27FY2024Property Plant Equipment Expected FY202520.0 to 25.0 million17
2024-12-27FY2024Projects In Development1.3 MW17
2024-12-27FY2024Product warranty term in U.S.15 months after shipment or 12 months after acceptance17
2024-12-27FY2024Patents in other jurisdictions (excluding subsidiaries)30717
2024-12-27FY2024Patent applications pending in other jurisdictions8617
2024-12-27FY2024Patent applications pending in U.S.2817
2024-12-27FY2024New carbon capture projects CO2 capture limitno more than 250,000 tons of CO2 on a cumulative annual basis17
2024-12-27FY2024Long Term Project Assets Expected FY20253.0 to 6.0 million17
2024-12-27FY2024Legacy fuel cell modules target design life5-year17
2024-12-27FY2024LTSA and PPA expiration rangethrough 204217
2024-12-27FY2024Initial maximum Joint Development Agreement research cost reimbursement45.0 million17
2024-12-27FY2024Industry average experience modification rate1.017
2024-12-27FY2024Hourly rates increase in Amendment No. 515%17
2024-12-27FY2024Government funding percentage of revenue FY20244%17
2024-12-27FY2024Government funding percentage of revenue FY20233%17
2024-12-27FY2024Government funding percentage of revenue FY20226%17
2024-12-27FY2024Generation Operating Portfolio62.8 MW17
2024-12-27FY2024FuelCell Energy Solutions GmbH licensed patents outside U.S.717
2024-12-27FY2024FuelCell Energy Solutions GmbH licensed U.S. patents217
2024-12-27FY2024Fuel cell stack module design life25-to-30 years17
2024-12-27FY2024Extended maximum Joint Development Agreement research cost reimbursement67.0 million17
2024-12-27FY2024Experience modification rate 20240.8317
2024-12-27FY2024Experience modification rate 20230.8917
2024-12-27FY2024Experience modification rate 20220.08817
2024-12-27FY2024Experience modification rate 20210.6817
2024-12-27FY2024Experience modification rate 20200.5917
2024-12-27FY2024Experience modification rate 20190.6517
2024-12-27FY2024Experience modification rate 20180.6217
2024-12-27FY2024EMTEC license agreement payment10 million17
2024-12-27FY2024Diverse team member population increase5%17
2024-12-27FY2024Current production fuel cell modules target design life7-year17
2024-12-27FY2024Conflict minerals (3TG) in fiscal year 2023 shipments14.0 pounds out of 4.6 million pounds (0.000299%)17
2024-12-27FY2024Company funded R&D expected FY202540.0 to 45.0 million17
2024-12-27FY2024Carbonate fuel cell electrical efficiency rangeapproximately 47% to 60%17
2024-12-27FY2024Carbonate Platform maximum annualized capacity100 MW17
2024-12-27FY2024Carbonate Platform future capacity200 MW17
2024-12-27FY2024Carbon capture demonstrationup to 95%17
2024-12-27FY2024Calgary facility total leased spaceapproximately 100,000 square feet17
2024-12-27FY2024Calgary facility potential total annualized SOEC manufacturing capacityup to 80 MW per year17
2024-12-27FY2024Calgary facility current annualized SOEC production capacity6 MW17
2024-12-27FY2024Calgary facility additional leased space from fiscal 2024 and 2023approximately 68,000 square feet17
2024-12-27FY2024CHP system efficiency potentialup to 90%17
2024-12-27FY2024Annual hourly rates increase beginning March 31, 20253%17
2024-12-27FY2024Amendment No. 5 expected annual budget for JDAat least 10.0 million per year17
2024-12-19FY2024unrestricted cash and cash equivalents$148.1 million16
2024-12-19FY2024Cash and short-term investments$318.0 million16
2024-12-19FY2024Backlog$1,162,83316
2024-09-052024-Q3unrestricted cash and cash equivalents159.3 million13
2024-09-052024-Q3U.S. Treasury Securities107.8 million13
2024-09-052024-Q3Total project assets248.8 million13
2024-09-052024-Q3Total backlog1.20 billion13
2024-09-052024-Q3Short-term investments107,817 (USD in thousands)14
2024-09-052024-Q3Service agreements backlog178.4 million13
2024-09-052024-Q3restricted cash and cash equivalents58.8 million13
2024-09-052024-Q3restricted cash and cash equivalents58,848 (USD in thousands)14
2024-09-052024-Q3Product backlog136.7 million13
2024-09-052024-Q3Pledged cash for performance security58.8 million13
2024-09-052024-Q3outstanding letters of credit14.2 million13
2024-09-052024-Q3Net debt related to project assets118.7 million13
2024-09-052024-Q3Generation operating portfolio capacity62.8 MW13
2024-09-052024-Q3Generation operating portfolio62.8 MW13
2024-09-052024-Q3Generation backlog839.5 million13
2024-09-052024-Q3Cash and cash equivalents, unrestricted159,347 (USD in thousands)14
2024-09-052024-Q3Cash and cash equivalents218.2 million13
2024-09-052024-Q3Backlog$1,197,10714
2024-09-052024-Q3Advanced Technologies contract backlog42.5 million13
2024-06-102024-Q2Unrestricted cash and equivalents158.8 million11
2024-06-102024-Q2Unrestricted Cash158.8 million12
2024-06-102024-Q2U.S. Government funded backlog12.7 million11
2024-06-102024-Q2Total backlog1.06 billion11
2024-06-102024-Q2Short-term Investments101.3 million12
2024-06-102024-Q2Service agreements backlog145.1 million11
2024-06-102024-Q2Service Backlog145,100 (USD in thousands)12
2024-06-102024-Q2Restricted cash pledged53.1 million11
2024-06-102024-Q2Product backlog12.3 million11
2024-06-102024-Q2Product Backlog12,307 (USD in thousands)12
2024-06-102024-Q2outstanding letters of credit14.2 million11
2024-06-102024-Q2Operating MW62.8 MW11
2024-06-102024-Q2Non U.S. Government funded backlog38.4 million11
2024-06-102024-Q2Net debt from project assets121.5 million11
2024-06-102024-Q2Generation operating portfolio62.8 MW11
2024-06-102024-Q2Generation backlog852.9 million11
2024-06-102024-Q2Generation Backlog852,93312
2024-06-102024-Q2GGE LTSA contract value159.6 million USD11
2024-06-102024-Q2Cash and Short-term Investments313.2 million12
2024-06-102024-Q2Backlog1,061,452 (USD in thousands)12
2024-06-102024-Q2Advanced Technologies contract backlog51.1 million11
2024-06-102024-Q2Advanced Technologies backlog51.1 million11
2024-06-102024-Q2Advanced Technologies Backlog51,112 (USD in thousands)12
2024-03-072024-Q1Tulare biomat fuel contract duration20 years9
2024-03-072024-Q1Toyota hydrogen PPA through dateMay 20259
2024-03-072024-Q1Toyota hydrogen PPA fuel contract duration2 years9
2024-03-072024-Q1Total debt service coverage ratio minimum1.10:1.009
2024-03-072024-Q1Subordinated back leverage loan step-down rate8%9
2024-03-072024-Q1Subordinated back leverage loan rate after step-downlesser of 8% or 10 year U.S. Treasury Note plus 275 basis points (minimum 5% per annum)9
2024-03-072024-Q1Subordinated back leverage loan maturity dateSeptember 30, 20389
2024-03-072024-Q1Subordinated back leverage loan interest-only period max84 months9
2024-03-072024-Q1Senior debt service coverage ratio minimum1.20:1.009
2024-03-072024-Q1Senior back leverage loans prepayment fee years 4-71%9
2024-03-072024-Q1Senior back leverage loans prepayment fee years 2-42%9
2024-03-072024-Q1Senior back leverage loans prepayment fee years 0-23%9
2024-03-072024-Q1Senior back leverage loans maturity dateAugust 18, 20309
2024-03-072024-Q1Senior back leverage loans amortization period10 years9
2024-03-072024-Q1RNG pricing sensitivity analysis annual impact$2.0 million9
2024-03-072024-Q1Restricted cash performance security and letters of credit$51.3 million9
2024-03-072024-Q1Restricted cash OpCo financing facility$21.6 million9
2024-03-072024-Q1Restricted Cash Crestmark Sale Leaseback$2.9 million9
2024-03-072024-Q1Restricted cash back leverage loan facility$9.0 million9
2024-03-072024-Q1opco financing facility net rate thereafter6.866%9
2024-03-072024-Q1opco financing facility net rate first four years6.366%9
2024-03-072024-Q1opco financing facility fixed swap rate3.716%9
2024-03-072024-Q1natural gas sensitivity analysis annual impact$26,0009
2024-03-072024-Q1lipa yaphank ppa through dateSeptember 20289
2024-03-072024-Q1lipa yaphank fixed price fuel contract duration7 years9
2024-03-072024-Q1Letters of credit outstanding$14.2 million9
2024-03-072024-Q1interest rate swap fair value loss q1 2024$3.5 million9
2024-03-072024-Q1Generation Operating Portfolio62.8 MW9
2024-03-072024-Q1foreign currency cash percentage0.5%9
2024-03-072024-Q1derivative loss natural gas q1 2024$1.9 million9
2024-03-072024-Q1derby projects capacity14.0 MW and 2.8 MW9
2024-03-072024-Q1derby ppa through dateOctober 20299
2024-03-072024-Q1derby fixed price fuel contract duration6 years9
2024-03-072024-Q1connecticut loan principal amount$10.0 million9
2024-03-072024-Q1connecticut loan penalty per position$14,225.009
2024-03-072024-Q1connecticut loan interest rate2.0%9
2024-03-072024-Q1connecticut loan forgiveness eligible amount$5.0 million9
2024-03-072024-Q1connecticut loan employment obligation positions538 (USD thousands)9
2024-03-072024-Q1connecticut loan credit eligible amount$2.0 million9
2024-03-072024-Q1connecticut loan additional positions for credit91 (USD thousands)9
2024-03-072024-Q1bridgeport project capacity14.9 MW9
2024-03-072024-Q1Bishop Rule 10b5-1 Plan share sale64,853 shares9
2024-03-072024-Q1Bishop Rule 10b5-1 Plan expiration dateJanuary 7, 20259
2024-03-072024-Q1Advanced Technologies US government-funded backlog$3.7 million9
2024-03-072024-Q1Advanced Technologies non-US government-funded backlog$19.7 million9
2024-03-072024-Q1Advanced technologies contract backlog$23.4 million9
2024-03-072024-Q1Unrestricted cash and cash equivalents as of October 31, 2023250.0 million9
2024-03-072024-Q1Total project assets260.8 million9
2024-03-072024-Q1Service agreements backlog140.4 million9
2024-03-072024-Q1restricted cash and cash equivalents51.3 million9
2024-03-072024-Q1Projects in development0.7 million9
2024-03-072024-Q1Pledged cash collateral for performance security51.3 million9
2024-03-072024-Q1Overall backlog1.03 billion9
2024-03-072024-Q1Operating power plants capacity62.8 MW9
2024-03-072024-Q1Operating installations260.1 million9
2024-03-072024-Q1Net debt outstanding related to project assets110.7 million9
2024-03-072024-Q1Generation backlog0.86 billion9
2024-03-072024-Q1Generation Operating Portfolio62.8 MW10
2024-03-072024-Q1Future required payments (principal and interest)134.8 million9
2024-03-072024-Q1Finance obligations under sale-leaseback transactions18.8 million9
2024-03-072024-Q1Depreciation of project assets6.8 million9
2024-03-072024-Q1Depreciation and amortization8.6 million9
2024-03-072024-Q1Backlog1,025,549 (USD in thousands)10
2024-03-072024-Q1Annualized production rate33.2 MW9
2024-03-072024-Q1Advanced Technologies contract backlog23.4 million9
2023-12-19FY2023Unrestricted cash and cash equivalents250.0 million7
2023-12-19FY2023Total backlog1.03 billion7
2023-12-19FY2023Short-term investments US Treasury securities103.8 million7
2023-12-19FY2023Service and generation backlog weighted average termapproximately 17 years7
2023-12-19FY2023Service agreements backlog140.8 million7
2023-12-19FY2023Projects under development19.4 MW7
2023-12-19FY2023Project assets258.1 million7
2023-12-19FY2023Product backlog0 (USD thousands)7
2023-12-19FY2023Operating portfolio of retained projects43.7 MW7
2023-12-19FY2023Operating generation portfolio43.7 MW7
2023-12-19FY2023Net debt outstanding related to project assets112.6 million7
2023-12-19FY2023Government funding percentage of revenue FY20233%7
2023-12-19FY2023Government funding percentage of revenue FY20226%7
2023-12-19FY2023government funding percentage of revenue FY20219%7
2023-12-19FY2023Generation Backlog872.1 million7
2023-12-19FY2023carbonate platforms installed and operatingmore than 220 MW7
2023-12-19FY2023Annualized Production Rate32.7 MW7
2023-12-19FY2023Advanced technologies contract backlog15.3 million7
2023-12-19FY2023additional projects under development or construction19.4 MW7
2023-12-19FY2023unrestricted cash and cash equivalents250.0 million7
2023-12-19FY2023U.S. Treasury Securities carrying value103.8 million7
2023-12-19FY2023U.S. Government unfunded Advanced Technologies backlog0.3 million7
2023-12-19FY2023U.S. Government funded Advanced Technologies backlog4.3 million7
2023-12-19FY2023Torrington maximum annualized capacity100 MW per year7
2023-12-19FY2023Torrington Facility Annualized Production Rate32.7 MW per year7
2023-12-19FY2023Torrington eventual annualized production capacityup to 200 MW per year7
2023-12-19FY2023Taufkirchen Germany capabilityup to 20 MW per year7
2023-12-19FY2023South Korea installed base additional MWmore than 100 MW7
2023-12-19FY2023South Korea Noeul Green Energy long term service agreement term14 years7
2023-12-19FY2023South Korea KOSPO power plant project MW20 MW7
2023-12-19FY2023restricted cash and cash equivalents49.6 million7
2023-12-19FY2023pledged cash for performance security and letters of credit49.6 million7
2023-12-19FY2023outstanding letters of credit14.2 million7
2023-12-19FY2023Non U.S. Government funded Advanced Technologies backlog10.7 million7
2023-12-19FY2023loss accruals on service agreements October 31 20239.5 million7
2023-12-19FY2023loss accruals on service agreements October 31 20227.3 million7
2023-12-19FY2023Groton Project design rated output7.4 MW7
2023-12-19FY2023Groton Project current output6.0 MW7
2023-12-19FY2023Generation operating portfolio43.7 MW7
2023-12-19FY2023derivative gain from natural gas settling fiscal year 20234.1 million7
2023-12-19FY2023derivative fair value adjustment fiscal year 20233.3 million gain7
2023-12-19FY2023derivative fair value adjustment fiscal year 20220.9 million gain7
2023-12-19FY2023Depreciation of project assets FY202320.3 million7
2023-12-19FY2023Depreciation of project assets FY202215.5 million7
2023-12-19FY2023D&A FY202325.4 million7
2023-12-19FY2023D&A FY202221.3 million7
2023-12-19FY2023Company-funded R&D expenses FY202460.0 million to 70.0 million7
2023-12-19FY2023Company-funded R&D expenses FY202361.0 million7
2023-12-19FY2023Cash and cash equivalents and restricted cash299.6 million7
2023-12-19FY2023Calgary solid oxide production capacity expected FY202410 MW SOFC or 40 MW SOEC per year7
2023-12-19FY2023Calgary solid oxide production capacity current1 MW SOFC or 4 MW SOEC per year7
2023-12-19FY2023Calgary manufacturing facility expected capacity40 MW per year7
2023-12-19FY2023Calgary manufacturing facility current capacity4 MW per year7
2023-12-19FY2023Advanced Technologies contract backlog15.3 million7
2023-12-192023-Q4unrestricted cash and cash equivalents$250.0 million8
2023-12-192023-Q4Short-term investments (U.S. Treasury Securities)$103.8 million8
2023-12-192023-Q4restricted cash and cash equivalents$49.6 million8
2023-12-192023-Q4Portfolio of generation assetsover 60 MW8
2023-12-192023-Q4Backlog$1.028 billion8
2023-12-192023-Q4Annualized production rate (Carbonate Platform)32.7 MW8
2023-09-112023-Q3Unrestricted cash and equivalents$303.7 million5
2023-09-112023-Q3unrestricted cash and cash equivalents$303.7 million5
2023-09-112023-Q3Unrestricted Cash and Cash Equivalents303.7 (USD in thousands)6
2023-09-112023-Q3U.S. Treasury Securities Weighted Average Yield to Maturity5.09%5
2023-09-112023-Q3U.S. Treasury Securities carrying value$77.4 million5
2023-09-112023-Q3Total space leased in Calgaryapproximately 80,000 square feet5
2023-09-112023-Q3Total net proceeds to Company$46.1 million5
2023-09-112023-Q3Total backlog$1.06 billion5
2023-09-112023-Q3Torrington Facility Maximum Annualized Capacity100 MW per year5
2023-09-112023-Q3Torrington facility eventual production capacityup to 200 MW per year5
2023-09-112023-Q3Term Loan principal amount$80.5 million5
2023-09-112023-Q3Short-term investments (U.S. Treasury Securities)$77.4 million5
2023-09-112023-Q3Shares reserved for issuance54,655,306 shares5
2023-09-112023-Q3Shares available for issuance55,295,919 shares5
2023-09-112023-Q3Service agreements backlog$136.6 million5
2023-09-112023-Q3Service Backlog136.6 (USD in thousands)6
2023-09-112023-Q3restricted cash and cash equivalents$32.7 million5
2023-09-112023-Q3RNG pricing sensitivity impact$2.0 million per $10/MMBtu increase5
2023-09-112023-Q3Purchase of U.S. Treasury Securities (nine months ended July 31, 2023)$195.8 million5
2023-09-112023-Q3Projects in Development19.4 MW5
2023-09-112023-Q3Project asset expenditures (nine months ended July 31, 2023)$35.4 million5
2023-09-112023-Q3Project asset expenditures (nine months ended July 31, 2022)$23.7 million5
2023-09-112023-Q3Proceeds from debt (nine months ended July 31, 2023)$80.5 million5
2023-09-112023-Q3Potential total annualized SOEC manufacturing capacityup to 80 MW per year5
2023-09-112023-Q3Potential additional SOEC manufacturing capacity at Calgaryup to an additional 40 MW per year5
2023-09-112023-Q3Payments of debt issuance costs (nine months ended July 31, 2023)$2.9 million5
2023-09-112023-Q3Payments for preferred dividends and distribution to noncontrolling interest (nine months ended July 31, 2023)$2.8 million5
2023-09-112023-Q3Payments for preferred dividends and distribution to noncontrolling interest (nine months ended July 31, 2022)$2.6 million5
2023-09-112023-Q3outstanding letters of credit$7.3 million5
2023-09-112023-Q3Net proceeds from sales of common stock (nine months ended July 31, 2023)$85.9 million5
2023-09-112023-Q3Net proceeds from sales of common stock (nine months ended July 31, 2022)$145.4 million5
2023-09-112023-Q3Net proceeds distributed to Parent$34.9 million5
2023-09-112023-Q3Net interest rate (thereafter, new facility)6.866%5
2023-09-112023-Q3Net interest rate (first four years, new facility)6.366%5
2023-09-112023-Q3Net debt project assets$94.9 million5
2023-09-112023-Q3Net contributions received from sale of noncontrolling interest in LIPA Yaphank Project (nine months ended July 31, 2022)$11.9 million5
2023-09-112023-Q3Natural gas price sensitivity impact$200,000 per $1/MMBtu increase5
2023-09-112023-Q3Letter of credit facility amount$6.5 million5
2023-09-112023-Q3Interest rate swap fixed rate (new facility)3.716%5
2023-09-112023-Q3Green Bank Loan balance as of July 31, 2023$3.0 million5
2023-09-112023-Q3Generation operating portfolio capacity43.7 MW5
2023-09-112023-Q3Generation backlog$915.1 million5
2023-09-112023-Q3Generation Operating Portfolio43.7 MW5
2023-09-112023-Q3Generation Backlog915.16
2023-09-112023-Q3Funds received from maturity of U.S. Treasury Securities (nine months ended July 31, 2023)$120.9 million5
2023-09-112023-Q3Depreciation and amortization of project assets (three months ended July 31, 2023)$5.4 million5
2023-09-112023-Q3Depreciation and amortization of project assets (three months ended July 31, 2022)$4.1 million5
2023-09-112023-Q3Depreciation and amortization of project assets (nine months ended July 31, 2023)$14.9 million5
2023-09-112023-Q3Depreciation and amortization of project assets (nine months ended July 31, 2022)$11.8 million5
2023-09-112023-Q3Depreciation and amortization (three months ended July 31, 2023)$6.6 million5
2023-09-112023-Q3Depreciation and amortization (three months ended July 31, 2022)$5.3 million5
2023-09-112023-Q3Depreciation and amortization (nine months ended July 31, 2023)$18.7 million5
2023-09-112023-Q3Depreciation and amortization (nine months ended July 31, 2022)$16.4 million5
2023-09-112023-Q3Debt repayments (nine months ended July 31, 2023)$42.2 million5
2023-09-112023-Q3Debt repayments (nine months ended July 31, 2022)$7.2 million5
2023-09-112023-Q3Connecticut State Loan term15 years5
2023-09-112023-Q3Connecticut State Loan principal$10.0 million5
2023-09-112023-Q3Connecticut State Loan interest rate2.0%5
2023-09-112023-Q3Company-funded research and development expenses (nine months ended July 31, 2023)$43.0 million5
2023-09-112023-Q3Cash and cash equivalents and restricted cash$336.4 million5
2023-09-112023-Q3Cash and Short-term Investments413.9 (USD in thousands)6
2023-09-112023-Q3Capital expenditures reserve required$29.0 million5
2023-09-112023-Q3Capital expenditures reserve funded from closing$14.5 million5
2023-09-112023-Q3Capital expenditures (nine months ended July 31, 2023)$28.0 million5
2023-09-112023-Q3Capital expenditures (nine months ended July 31, 2022)$15.8 million5
2023-09-112023-Q3Calgary facility capacity expansion (current to planned)4 MW to 10 MW per year (SOFC) or 4 MW to 40 MW per year (SOEC)5
2023-09-112023-Q3Backlog1,063.3 (USD in thousands)6
2023-09-112023-Q3Authorized shares of common stock500,000,000 shares5
2023-09-112023-Q3Advanced Technologies contract backlog$11.6 million5
2023-09-112023-Q3Advanced Technologies contract backlog$11.6 million5
2023-09-112023-Q3Advanced Technologies Backlog11.6 (USD in thousands)6
2023-09-112023-Q3Additional space leased in Calgaryapproximately 48,000 square feet5
2023-06-082023-Q2Unrestricted cash246.8 million3
2023-06-082023-Q2Total backlog1.02 billion3
2023-06-082023-Q2Short-term investments treasury76.4 million3
2023-06-082023-Q2Service agreements backlog73.7 million3
2023-06-082023-Q2Product backlog26 thousand3
2023-06-082023-Q2Operating MW capacity43.7 MW3
2023-06-082023-Q2MW in process19.4 MW3
2023-06-082023-Q2Generation Backlog926.0 million3
2023-06-082023-Q2Advanced technologies backlog22.6 million3
2023-06-082023-Q2unrestricted cash and cash equivalents$246.8 million3
2023-06-082023-Q2Unrestricted cash246.8 million4
2023-06-082023-Q2U.S. Treasury Securities carrying value$76.4 million3
2023-06-082023-Q2Toyota project expensed costs$11.6 million3
2023-06-082023-Q2Total project assets$237.2 million3
2023-06-082023-Q2restricted cash and cash equivalents$30.2 million3
2023-06-082023-Q2Projects under development and construction19.4 MW3
2023-06-082023-Q2pledged cash and cash equivalents for performance security$30.2 million3
2023-06-082023-Q2outstanding letters of credit$9.1 million3
2023-06-082023-Q2Operating project assets revenue$18.0 million3
2023-06-082023-Q2Operating project assets43.7 MW3
2023-06-082023-Q2D&A (three months ended April 30, 2023)$6.6 million3
2023-06-082023-Q2D&A (three months ended April 30, 2022)$5.3 million3
2023-06-082023-Q2D&A (six months ended April 30, 2023)$12.0 million3
2023-06-082023-Q2D&A (six months ended April 30, 2022)$11.1 million3
2023-06-082023-Q2Company-funded R&D expenses$27.4 million3
2023-06-082023-Q2Cash and short-term investments353.5 million4
2023-06-082023-Q2Cash and cash equivalents and restricted cash$277.1 million3
2023-06-082023-Q2Capitalized project asset expenditures$19.8 million3
2023-06-082023-Q2Backlog1,022,296 (USD in thousands)4
2023-06-082023-Q2Advanced Technologies contract backlog$22.6 million3
2023-03-092023-Q1unrestricted cash and cash equivalents315.2 million1
2023-03-092023-Q1unrestricted cash and cash equivalents315.2 million2
2023-03-092023-Q1Total project assets229.9 million1
2023-03-092023-Q1Total backlog1.06 billion1
2023-03-092023-Q1Total Backlog1,061,107 (USD in thousands)2
2023-03-092023-Q1Solid Oxide Platform planned additional U.S. capacity400 MW2
2023-03-092023-Q1Solid Oxide Platform expected annualized electrolysis production capacity after Calgary expansion40 MWs2
2023-03-092023-Q1Solid Oxide Platform Calgary facility expansion spaceapproximately 80,000 square feet2
2023-03-092023-Q1Short-term investments in U.S. Treasury Securities75.7 million1
2023-03-092023-Q1Short-term investments in U.S. Treasury Securities75.7 million2
2023-03-092023-Q1Service agreements backlog99.9 million1
2023-03-092023-Q1restricted cash and cash equivalents24.6 million1
2023-03-092023-Q1restricted cash and cash equivalents24.6 million2
2023-03-092023-Q1Projects in development capacity19.4 MW1
2023-03-092023-Q1outstanding letters of credit5.0 million1
2023-03-092023-Q1Operating power plants capacity43.7 MW1
2023-03-092023-Q1Net debt outstanding related to project assets68.7 million1
2023-03-092023-Q1Generation backlog0.9 billion1
2023-03-092023-Q1Cash, Restricted Cash and Short-Term Investments415.4 million2
2023-03-092023-Q1Carbonate Platform planned annualized production rate for fiscal year 202345 MW2
2023-03-092023-Q1Carbonate Platform maximum annualized capacity100 MW2
2023-03-092023-Q1Carbonate Platform eventual capacity with additional investment200 MW2
2023-03-092023-Q1Carbonate Platform annualized production rate38.2 MW2
2023-03-092023-Q1Backlog - Service99,852 (USD in thousands)2
2023-03-092023-Q1Backlog - Product0 (USD in thousands)2
2023-03-092023-Q1Backlog - Generation934,4842
2023-03-092023-Q1Backlog - Advanced Technologies26,771 (USD in thousands)2
2023-03-092023-Q1Advanced Technologies contract backlog26.8 million1
Advertisement

Guidance Tracking (latest per metric/period · 8/14)#

All management forecasts (guidance) and their later outcome. Types: fiscal-year targets as well as quarterly/half-year targets; per metric and period the most recent statement applies, older versions can be expanded. The status is checked automatically against the actuals reported later: open (period still running), met, beaten, missed. For ranges (“X to Y”) reaching the range counts. Logged neutrally, no estimate of our own, no assessment.

Actuals: revenue in $m

For periodGuided onMetricGuidedActualVerdictDirectionSource
FY20272026-06-08Groton Project upgrade cost20–30pendinginitiated28
FY20262026-06-08Company-funded R&D expenses30–35pendinginitiated30
FY20262026-06-08Property, plant and equipment expenditures20–30pendinginitiated28
2026-Q42026-09-02EBITDA (adjusted)positivependinginitiated31
FY20252025-09-09Capex15–20confirmed22
FY20252025-09-09Company-funded R&D expenses35–40confirmed22
FY20252024-12-19Revenuematerial improvement158.2raised16
FY20252024-12-19Operating costs~15%confirmed16
FY20242024-09-05Project asset expenditures12–15cut13
FY20242024-09-05Property, plant and equipment expenditures45–60cut13
FY20242024-09-05Company-funded R&D expenses56–61cut13
FY20232023-06-08Capex60–90confirmed3
FY20232023-06-08Research and development expenses50–70confirmed3
FY20232023-06-08Remaining investment in project assets45–65confirmed3
Advertisement

Development#

A condensed summary per reporting period as running text: what changed operationally, which drivers management names, how earnings and cash flow developed. Most recent period first, grouped by year; each text is written from the original report of that period, superscript numbers lead to the source.

FY2026

FuelCell Energy recorded total revenue of $99.1 million across the first three quarters of fiscal year 2026 (November 2025 through July 2026), compared with approximately $103.1 million in the equivalent prior-year period, as strong Q1 growth driven by GGE and CGN Platform module deliveries was followed by a 29% year-over-year revenue decline in Q3 as GGE module shipments moderated (26, 30). Operating losses across the nine-month period were materially influenced by a $42.6 million non-cash impairment charge in Q2, recorded after performance issues with SureSource 4000 fuel cells at the Groton Project led the company to elect an upgrade to standard 2.5 MW power blocks at an estimated cost of $20 to $30 million, with completion expected in fiscal year 2027 (28). Unrestricted cash and cash equivalents rose to $658.1 million by July 31, 2026, from $278.1 million at the start of the fiscal year, supported by $453.6 million in net equity proceeds over nine months including a $245.5 million underwritten public offering completed in July 2026 (30). In Q3, the company entered a Capital Equipment Purchase Agreement with Fit Energy USA LP for approximately $2.6 billion to supply up to 380 MW of carbonate fuel cell systems, increasing Committed Backlog 4.1% to $1.30 billion and generating a $2.4 billion Awarded Capacity Backlog for an optional additional 350 MW (30, 31). The company also initiated guidance targeting positive Adjusted EBITDA in Q4 fiscal year 2027, contingent on conversion of the Awarded Capacity Backlog and continued execution of cost reduction initiatives (31).

FY2025

FuelCell Energy reported total revenues of $158.2 million in fiscal year 2025, a 41% increase from $112.1 million in fiscal 2024, driven primarily by a 169% surge in product revenues to $69.1 million, with $66.0 million recognized under the long-term service agreement with Gyeonggi Green Energy Co., Ltd. for delivery of 22 replacement fuel cell modules at its 58.8 MW facility in South Korea (24). Gross margin improved to (16.7)% from (32.0)%, reflecting better cost absorption as production volumes increased at the Torrington manufacturing facility (24). The company recorded a $65.8 million non-cash impairment charge related to prior investments in solid oxide technology, including goodwill, in-process research and development, property, plant and equipment, and inventory, and conducted two global restructuring actions in November 2024 and June 2025, reducing the global workforce by approximately 35% in aggregate (24). Net loss attributable to common stockholders widened to $191.1 million ($7.42 per share) from $129.2 million, largely due to the impairment charges (24). Unrestricted cash increased to $278.1 million from $148.1 million at fiscal year-start, supported by at-the-market equity issuances of approximately 25.6 million shares at an average price of $7.44 per share and a new $25.0 million EXIM financing closed in November 2025 (24).

FY2024

FuelCell Energy's total revenues for fiscal year 2024 declined 9% to $112.1 million from $123.4 million in FY2023, as an 80% drop in Service agreements revenues to $10.0 million – driven by only 2 module exchanges versus 15 in the prior year – more than offset a 33% increase in Generation revenues to $50.0 million and a 54% rise in Advanced Technologies contract revenues to $26.5 million 17. The operating generation portfolio expanded from 43.7 MW to 62.8 MW as the Toyota Project, Derby 14.0 MW Project, and Derby 2.8 MW SCEF Project achieved commercial operations in Q1 2024 9. Gross loss widened to $35.9 million with a negative 32.0% gross margin, and the operating loss increased to $158.5 million from $136.1 million in FY2023 17. The Gyeonggi Green Energy long-term service agreement for 58.8 MW, valued at $159.6 million, drove total backlog 13.1% higher to $1.16 billion as of October 31, 2024 16. In November 2024, the company announced a global restructuring with a 17% total workforce reduction, deferred the Calgary capacity expansion, and disclosed it would not meet previously provided aspirational revenue targets for FY2025 and FY2030 due to slower-than-expected hydrogen adoption and delayed commercialization timelines for SOEC, SOFC, and carbon capture products 16.

FY2023

FuelCell Energy reported total revenues of $123.4 million in fiscal year 2023, a 5% decline from $130.5 million in fiscal year 2022, as a 284% increase in service agreements revenues to $49.1 million from 15 new module exchanges -- primarily at Korea Southern Power Company facilities -- was more than offset by lower product revenues and a 20% decline in Advanced Technologies contract revenues 7. Gross margin improved to (8.5)% from (22.7)% in the prior fiscal year, driven by higher-margin service agreement activity, while the loss from operations narrowed to $136.1 million from $143.7 million 7. The net loss attributable to common stockholders decreased to $110.8 million from $145.9 million in fiscal year 2022, though adjusted EBITDA deteriorated to $(102.9) million from $(91.7) million in the prior year 8. Company-funded research and development expenses increased to $61.0 million from $34.5 million, reflecting accelerated investment in solid oxide platform commercialization and carbon capture technology development 7. Unrestricted cash ended the fiscal year at $250.0 million, with total cash and restricted cash declining from $481.0 million to $299.6 million, partly reflecting the purchase of U.S. Treasury Securities classified outside unrestricted cash 7.

Advertisement

Sources: official investor relations documents#

All original documents used, with type (e.g. quarterly, half-year, annual report), publication date and a direct link to the filing (EDINET/SEC/IR). Every superscript number in the report points to an entry in this list; so every figure can be traced back to its place in the original.

47 documents · 2016 – 2026 · SEC EDGAR (USA)
#Document typePublishedLink
#110-Q2023-03-09Open
#28-K-EX99.12023-03-09Open
#310-Q2023-06-08Open
#48-K-EX99.12023-06-08Open
#510-Q2023-09-11Open
#68-K-EX99.12023-09-11Open
#710-K2023-12-19Open
#88-K-EX99.12023-12-19Open
#910-Q2024-03-07Open
#108-K-EX99.12024-03-07Open
#1110-Q2024-06-10Open
#128-K-EX99.12024-06-10Open
#1310-Q2024-09-05Open
#148-K-EX99.12024-09-05Open
#158-K-EX99.12024-11-15Open
#168-K-EX99.12024-12-19Open
#1710-K2024-12-27Open
#1810-Q2025-03-11Open
#198-K-EX99.12025-03-11Open
#2010-Q2025-06-06Open
#218-K-EX99.12025-06-06Open
#2210-Q2025-09-09Open
#238-K-EX99.12025-09-09Open
#2410-K2025-12-18Open
#258-K-EX99.12025-12-18Open
#2610-Q2026-03-09Open
#278-K-EX99.12026-03-09Open
#2810-Q2026-06-08Open
#298-K-EX99.12026-06-08Open
#3010-Q2026-09-02Open
#318-K-EX99.12026-09-02Open
Older sources (+16)
#Document typePublishedLink
#20910-K2016-03-10Open
#20810-Q2016-06-09Open
#21110-K2017-01-12Open
#21010-Q2017-06-08Open
#21310-K2018-01-11Open
#21210-Q2018-06-07Open
#21510-K2019-01-10Open
#21410-Q2019-06-17Open
#20310-K2020-01-22Open
#21610-Q2020-03-16Open
#20110-Q2020-06-12Open
#20210-Q2020-09-10Open
#20710-K2021-01-21Open
#20410-Q2021-03-16Open
#20510-Q2021-06-10Open
#20610-Q2021-09-14Open

FAQ#

Is there a management forecast (guidance) for FY2027?

Yes. Management has issued targets for FY2027, including Groton Project upgrade cost. The guidance tracking chapter shows all targets and checks them against the actuals reported later; neutral, with no estimate of our own.

Does FuelCell Energy, Inc. pay a dividend?

The filings report on the dividend; most recent entry: dividends paid $2.8 million (2023-Q3) (as reported, no assessment of our own). Details with source links are in the report chapters.

Where can I find the official investor relations documents of FuelCell Energy, Inc.?

The sources chapter links all 47 original filings used (SEC filings) with type, publication date and a direct link; every figure in the report carries a source number.