Vulcan Energy Stock VUL.AX
Vulcan Energy Resources is a development-stage company advancing an integrated lithium and renewable geothermal energy project in Germany's Upper Rhine Valley Brine Field. Vulcan Energy stock (VUL.AX): Quarterly and annual results since 2023 from Quarterly Report and IR documents: revenue, earnings, balance sheet, cash flow and management guidance, every figure with its source. As of 09/2026, quarterly reporting. Stock analysis by NadirAlpha. Vulcan Energy stock (VUL.AX): listed on ASX, WKN A2PV3A. NadirAlpha has evaluated 14 original documents, cross-checked every figure automatically and linked each to its source; sources as of 09/2026. Latest reading: Strategic pivot.
AI-generated report · not investment advice · figures extracted automatically; please verify against the linked original more
Vulcan Energy Current Status
Summary of the most recent reporting period of Vulcan Energy (Q2 2026): core figures, drivers and management statements, every figure with a source number. NadirAlpha methodology
Assessment by NadirAlpha, as of Q2 2026.
“Vulcan continues to deliver against the planned execution program for our flagship Lionheart Project.”
“Following a strong first half of the year, we remain focused on delivering Lionheart on time, on budget, and without incident.”
Vulcan Energy Stock: Key Figures (€ million)
The core financial figures of Vulcan Energy stock in three views: fiscal years up to FY2026, half-years and quarters up to Q2 2026, in € million, most recent period first. NadirAlpha extracts all values automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original. NadirAlpha methodology
All figures serve only to support your own investment decision and are not a recommendation; the company's original reports are authoritative.
Fiscal years
| Period | Revenue | Net income | EPS (€) | OCF | Source |
|---|---|---|---|---|---|
| FY2025 | 7.3 | -69.6 | -0.30 | -47.7 | 103 |
| FY2024 | 8.1 | -42.4 | -0.23 | -30.7 | 2 |
| FY2023 | 6.8 | -27 | -0.17 | -24.3 | 101 |
Quarters
| Period | Published | Revenue | Cash | Net Debt | Source |
|---|---|---|---|---|---|
| 2025-Q4* | 2026-01-30 | 1.6 | 517.8 | -517.8 | 12 |
| 2025-Q3 | 2025-10-22 | 1.1 | 47 | – | 11 |
Vulcan Energy Balance Sheet & Cash Flow (€ million)
Point-in-time balance sheet items of Vulcan Energy (cash, financial debt) and cash flow items per fiscal year, half-year and quarter, derived values with their formula in the popover. NadirAlpha extracts all values automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original. NadirAlpha methodology
Fiscal years
| Period | Published | Cash | Debt | Net Debt | OCF | Capex | FCF | Source |
|---|---|---|---|---|---|---|---|---|
| FY2025 | 2026-03-26 | 517.8 | 0° | -517.8 | -47.7 | 48.2 | -95.9 | 103 |
| FY2024 | 2025-03-25 | 97.1 | – | – | -30.7 | 58.3 | -89 | 2 |
| FY2023 | 2025-03-25 | 78.7 | – | – | -24.3 | 73.6° | -98 | 101 |
Quarters
| Period | Published | Cash | Debt | Net Debt | OCF | Capex | Source |
|---|---|---|---|---|---|---|---|
| 2026-Q2 | 2026-07-29 | 193.9 | 1.6 | -192.3 | – | 92 | 16 |
| 2026-Q1 | 2026-04-30 | 364.3 | – | – | – | 0.1 | 15 |
| 2025-Q4 | 2026-01-30 | 517.8 | 0 | -517.8 | – | – | 12 |
| 2025-Q3 | 2025-09-30 | 47 | – | – | -10.9 | – | 13 |
Vulcan Energy Stock: Price & Chart
Chart and key figure trend of Vulcan Energy stock: the TradingView chart starts only on click, the key figure chart comes from the core tables up to Q2 2026. NadirAlpha methodology
Daily candles with news and earnings markers. Loads only on click.
Vulcan Energy Event Timeline
This timeline collects the material events of Vulcan Energy from the original reports: guidance changes, revenue and margin signals, strategy shifts, product and M&A announcements, grouped by quarter. NadirAlpha methodology
2026 · 6 events
Financial Close achieved on €2.2 billion Lionheart Phase One equity and debt financing package; first strategic equity drawdown received July 2026 16
ICPP section 1 construction commenced on schedule; bulk earthworks and overhead high-voltage line relocation at geothermal extraction plant progressing toward Q3 2026 completion 16
Phase 2 Pre-Feasibility Study underway for Ludwigshafen production site, targeted for finalisation September 2026 16
“Vulcan has had a great start to the year as we deliver against the planned execution programme for our flagship Lionheart Project.”
First lithium production permit for Lionheart issued by German authorities in the Upper Rhine Valley Brine Field 15
€2.2 billion financing package for Lionheart secured; conditions precedent significantly progressed toward Financial Close expected Q2 2026 15
Groundbreaking held at lithium chemical plant in Frankfurt marking commencement of major construction works 15
2025 · 13 events
“Safe operations are productive operations, and they remain central to our day-to-day life at Vulcan.”
“2026 is shaping up to be another successful year for the Company. We remain committed to creating long-term value and look forward to providing our shareholders with progress over the coming period.”
Board approved positive Final Investment Decision on Lionheart; groundbreaking ceremony at G-LEP site in Landau marked start of construction 6
Non-cash impairment of €7.8 million recognised for LSC-1a wellbore due to instability; alternative LSC-1b sidetrack subsequently drilled successfully 12
€2.2 billion Lionheart financing package completed, including senior project debt, government grants and strategic equity, achieving Financial Close 12
“The remainder of the year is expected to be transformative for the Company, as we aim to finalise our financing package for Phase One, including execution of all remaining major supply contracts. We remain focused on delivering long-term value to our shareholders and look forward to providing further updates over the coming period.”
€104 million in grants approved by German federal and state governments for Phase One lithium production and processing under TCTF scheme 11
Binding offtake agreement signed with Glencore for 36,000 to 44,000 tonnes of LHM over an initial eight-year period 11
Permit secured to build and operate the Central Lithium Plant at Industrial Park Höchst, Frankfurt in September 2025 11
Geox GmbH acquisition completed for approximately €15.0 million, adding operational geothermal wells and lithium licences near Landau 6
Drilling of first new Phase One well (LSC-1) commenced at Schleidberg well site on 27 May 2025, starting sub-surface execution 5
“FY24 was a year of significant progress as Vulcan advanced toward becoming a key supplier of sustainable lithium and renewable energy for Europe.”
First fully integrated battery-quality LHM produced at CLEOP facility in Frankfurt in January 2025, marking first such production in Europe 5
Lionheart Project designated Strategic Project under EU Critical Raw Materials Act in March 2025 5
Revenue grew to EUR 8.1 millionm, 19.7% higher than prior year, with geothermal energy sales of 18,490 MWh 2
First battery-quality lithium hydroxide monohydrate produced at CLEOP downstream plant, first fully integrated battery-quality LHM in Europe from resource to final product 2
Vulcan Energy Business Model
The Vulcan Energy business model in brief: products, customers and revenue sources as the company itself describes them in its reports. NadirAlpha methodology
Vulcan Energy Resources is a development-stage company advancing an integrated lithium and renewable geothermal energy project in Germany's Upper Rhine Valley Brine Field. The company's Zero Carbon Lithium approach extracts lithium from naturally hot geothermal brines using its proprietary VULSORB direct lithium extraction technology, with process energy supplied by co-located geothermal power generation from the same brine resource. The Lionheart Phase One commercial project, now under active construction following the Q2 2026 financial close, is the current primary focus of capital investment. Revenue is expected to arise primarily from the sale of V-LiON battery-grade lithium hydroxide and lithium chloride into the European electric vehicle battery supply chain, as well as from renewable geothermal electricity generation. Offtake agreements are in place with Stellantis, Umicore, LG Energy Solution, and Glencore. Vulcan Energy currently generates minimal revenue from pilot and preparatory activities while investing across Lionheart project sites, with a planned subsequent development phase at the Ludwig and Therese licence areas under the Project Ludwig designation.
Vulcan Energy Stock: Share-Price Drivers
Factors Vulcan Energy itself names as material for its business development, reproduced neutrally, without price forecast and without assessment of our own. NadirAlpha methodology
The Phase One Lionheart Project reached Financial Close in Q2 2026 (16), with project capital spending of 92 million in the quarter and a cash position of 193.9 million (16); the company remains in a net cash position of 192.3 million (16), while reported revenue is still minimal at 1.6 million (12)
Vulcan completed Financial Close of equity and debt financing in December 2025 (6) and reached Phase One Lionheart Project Financial Close in Q2 2026 (16); a HOCHTIEF cornerstone investment with a board appointment and a Siemens major supply agreement for Lionheart were secured in Q1 2026 (15)
Vulcan Energy completed the LSC-1 production well and the LSC-2 well with testing (15), with the LSC-1b well production test done in January 2026 (6); further LSC-3 and LSC-4 drilling and a second V10 rig mobilisation are planned for H2 2026 (16)
Vulcan signed a Glencore LHM offtake agreement and a NORAM electrolysis systems supply contract, plus a JordProxa partnership for lithium purification (11); these point to building commercial traction for the V-LiON lithium chemicals line (8)
The Lionheart lithium chemicals plant groundbreaking and the lithium production permit were reached in Q1 2026 (15), with geothermal power plant civil construction commencement from July 2026 (8) and early bulk earthworks and ICPP section 1 construction planned from Q2 2026 onwards (16)
Vulcan's cash declined from 517.8 million at end-2025 to 364.3 million and to 193.9 million (16), as project capital spending rose to 92 million in Q2 2026 (16) during the construction phase
Sector trend: Vulcan is positioned in the lithium and geothermal value chain for the European EV battery supply chain, where demand for locally produced lithium chemicals is the key driver for the V-LiON product and related offtake agreements (8, 11). As a pre-revenue developer, the company's sector exposure is to construction progress and financing rather than to current margin or utilisation levels (16).
Vulcan Energy Revenue by Type (as of 2026-Q2 · EUR million · 3/3)
The segments of Vulcan Energy in the company's own definition, each row with its basis (3, 6 or 12 months), rows in grey are no longer reported separately. NadirAlpha methodology
| Segment | Since | Revenue | Source |
|---|---|---|---|
| Period FY2025 (12M) | |||
| Germany | FY2023 | 7.3 | 6 |
| Period 2025-H1 (6M) | |||
| Australia | FY2023 | 0 | 5 |
| Other European | FY2023 | 0 | 5 |
Vulcan Energy Products & announcements (36/39 active+recent)
What Vulcan Energy launched, had approved or announced, from the filings up to Q2 2026, each row with the date of first mention. NadirAlpha methodology
Status: PlannedLaunched
| Product/Line | Since | Status | Source |
|---|---|---|---|
| 2026 | |||
| V10 rig mobilisation | 2026-12 | 15 | |
| Second drilling rig V10 mobilisation to fourth well site | 2026-12 | 16 | |
| Project Ludwig (2x) | 2026-09 | 8 | |
| Phase Two PFS release (Ludwig and Therese) | 2026-09 | 8 | |
| Ludwigshafen Phase 2 Pre-Feasibility Study finalisation | 2026-09 | 16 | |
| Geothermal power plant civil construction commencement (2x) | 2026-07 | 16 | |
| Lithium chemicals plant early bulk earthworks | 2026-06 | 16 | |
| Lionheart financing Financial Close | 2026-06 | 15 | |
| ICPP section 1 construction | 2026-06 | 16 | |
| Lionheart lithium production permit (2x) | 2026-03 | 15 | |
| Lionheart lithium chemicals plant groundbreaking | 2026-03 | 15 | |
| LSC-1b well production test | 2026-01 | 6 | |
| Ludwigshafen geothermal extraction plant expansion | 2026 | 12 | |
| Lionheart Phase One Project | 2026 | 8 | |
| 2025 | |||
| Phase One Lionheart Project FID and financing close | 2025-12 | 12 | |
| Ortenau licence extension to December 2028 | 2025-12 | 12 | |
| Mannheim geothermal and lithium project development | 2025-12 | 12 | |
| Lionheart Project groundbreaking ceremony | 2025-12 | 6 | |
| G-LEP site acquisition and foundation stone ceremony | 2025-12 | 12 | |
| BASF joint project 3D seismic survey planning | 2025-12 | 12 | |
| Turboden and ROM Technik EPC contract signed | 2025-09 | 11 | |
| NORAM Electrolysis Systems supply contract signed (2x) | 2025-09 | 11 | |
| G-LEP land acquisition approved | 2025-09 | 11 | |
| €30 million strategic equity placement | 2025-07 | 5 | |
| Building permits approval for 30 MW geothermal plant | 2025-06 | 5 | |
| Schleidberg well drilling commencement (3×) | 2025-05 | 6 | |
| Strategic Project designation under EU CRMA | 2025-03 | 6 | |
| V20 drill rig mobilisation to Phase One Schleidberg well site | 2025-02 | 2 | |
| Phase One Lionheart Project execution | 2025-02 | 2 | |
| Production of battery-quality LHM at CLEOP (2×) | 2025-01 | 5 | |
| Joint 2D seismic survey with BASF SE approval | 2025-01 | 2 | |
| V-LiON™ lithium chemicals commercialisation for EV battery supply chain | 2025 | 8 | |
| Lionheart Field Development Plan Phase One production commencement | 2025 | 8 | |
| LSC-3 and LSC-4 drilling (9x) | 2025 | 11 | |
| Heat offtake agreement with EnergieSüdwest AG | 2025 | 6 | |
| 2024 | |||
| Geothermal and Lithium Extraction Plant construction (2x) | 2024-12 | 16 | |
| CLEOP lithium hydroxide production | 2024-12 | 2 | |
| Lithium Extraction Optimisation Plant (LEOP) | 2024 | 2 | |
| Central Lithium Electrolysis Optimisation Plant (CLEOP) | 2024 | 2 | |
Vulcan Energy Transactions & Events (21)
Transactions of Vulcan Energy since 2023: acquisitions, disposals, agreements and regulation, deliberately including smaller items; purchase prices only when the company names them. NadirAlpha methodology
Acquisitions by Vulcan Energy
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| 2026 | |||
| Phase One Lionheart Project Financial Close | 2026-06 | Completed | 16 |
| Lionheart Project Financial Close | 2026-05 | Completed | 8 |
| EAU Lithium A-DLE pilot plant acquisition | 2026-05 | Completed | 8 |
| 2025 | |||
| Institutional placement and entitlement offer | 2025-12 | Completed | 12 |
| HOCHTIEF strategic investment and cornerstone subscription | 2025-12 | Completed | 12 |
| Financial Close of equity and debt financing | 2025-12 | Completed | 6 |
| D12 site land acquisition agreement | 2025-12 | Announced | 6 |
| Vulcan Energy Engineering GmbH merger | 2025-09 | Completed | 6 |
| Performance rights exercise | 2025-06 | Completed | 5 |
| Share purchase plan (2×) | 2025-01 | Completed | 5 |
| Share placement | 2025-01 | Completed | 5 |
| €1,185 million financing package (3×) | 2025 | Completed | 6 |
| Placement with BNP Paribas Clean Energy Solutions Fund | 2025 | Completed | 6 |
| 2024 | |||
| Phase 1 Project Financing | 2024-12 | Completed | 2 |
| Geox GmbH acquisition | 2024-09 | Completed | 6 |
| 2023 | |||
| Comeback Personaldienstleistungen GmbH acquisition | 2023-02 | Completed | 2 |
Partnerships and contracts of Vulcan Energy
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| 2026 | |||
| Siemens major supply agreement for Lionheart | 2026-03 | Agreement | 15 |
| 2025 | |||
| JordProxa partnership for lithium purification | 2025-09 | Agreement | 11 |
| Leasehold Agreement for Geox licence area | 2025-04 | Agreement | 5 |
| Glencore offtake agreement (3×) | 2025 | Agreement | 11 |
Regulation and legislation at Vulcan Energy
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| 2025 | |||
| Strategic Project status under European Commission's Critical Raw Materials Act | 2025-03 | Regulation | 5 |
Vulcan Energy Risks (63 since the annual report of 2026-03-26, 90 tracked in total)
Which risks Vulcan Energy has named since the annual report, company-specific first, generic standard risks in the expandable part; first mention refers to the document base from 2023. NadirAlpha methodology
Category: GeopoliticsLegalRegulatorySupply chainTechnologyMacroCustomersMarketESGFinancialPeopleCompetitionStrategy
| Risk | Category | Last reported |
|---|---|---|
| Vulcan Energy: first mention in IR-Quarter quarterly report of 2026-07-29 (2026-Q2), source 16 | ||
| Project dependent on European energy security and critical materials sovereignty drivers | = | |
| Forward-looking statements subject to inherent risks and uncertainties including industry-specific and general economic factors | = | |
| Production targets and estimates based on material assumptions that may not materialise | = | |
| Vulcan Energy: first mention in IR-Report report of 2025-03-25 (2024-Q4), source 2 | ||
| Kachelhoffa geothermal permit decision by Nancy Administrative Court of Appeal subject to appeal | 2026-Q2 2026-07-29 16 | |
| Vulcan Energy: first mention in IR-Annual annual report of 2026-09-09 (FY2025), source 8 | ||
| Commencement of construction at Lionheart subject to permitting and milestone completion | = | |
| Construction and operational execution risks for Lionheart and Project Ludwig phases | = | |
| License to be granted in URVBF and Rhineland-Palatinate state | = | |
| Validation and scaling of VULSORB lithium adsorbent technology from pilot to commercial production | = | |
| Exposure to European regulatory environment and trade policy affecting lithium supply chain | = | |
| Long-lead items and supply chain dependencies for major equipment fabrication and delivery | = | |
| Lithium industry volatility and resources exploration sector uncertainties | = | |
| Environmental and social impact assessment compliance for geothermal operations | = | |
| Vulcan Energy: first mention in IR-Quarter quarterly report of 2026-04-30 (2026-Q1), source 15 | ||
| Revenue dependent on successful execution of offtake contracts; product qualification process ongoing with customers | = | |
| Execution risks associated with construction and development of integrated Lionheart Project spanning multiple work packages and sites | = | |
| Reliance on proprietary VULSORB sorbent technology and process optimization; qualification process for product offtake with customers still in progress | = | |
| Dependence on European energy security and critical raw materials policies; government support through BEW funding programme and royalty exemptions subject to review | = | |
| Lithium market dependent on continued electrification of mobility and battery storage demand; exposure to shifts in EV adoption and battery technology | = | |
| Vulcan Energy: first mention in IR-Annual annual report of 2026-03-26 (FY2025), source 6 | ||
| Regulatory approvals and permits required for Lionheart and future phase projects; decision of Nancy Administrative Court against geothermal permit requiring continued government consultation | 2026-Q1 2026-04-30 15 | |
| Local community relations and stakeholder engagement in Germany and France. | = | |
| Environmental impacts of lithium mining and geothermal energy utilization. | = | |
| EUR 275.1 million in capital commitments for Lionheart Project construction | = | |
| Group capacity to execute development plan linked to financing drawdowns | FY2025 2026-09-09 8 | |
| Extensive project financing required; risks relating to capital realization and debt raising. | = | |
| Significant supplier and contractor agreements for Lionheart Project contain termination for convenience clauses | = | |
| Dependence on key suppliers such as JordProxa, SHJV, ABB and NESI for project execution. | = | |
| Market dependence for lithium hydroxide and geothermal energy on global demand. | = | |
| Geox GmbH acquisition completed with deferred consideration and integration into Lionheart Project operations | = | |
| Land acquisition permits and licence confirmations required for project development. | = | |
| Regulatory approvals required for geothermal and lithium production licenses in Germany | = | |
| Mining licence acquisition through Geox; Central Lithium Plant site lease in industrial precinct requires ongoing compliance | = | |
| LSC-1a sidetrack abandoned due to wellbore instability; alternative LSC-1b sidetrack drilled with successful results | = | |
| Dependency on well production performance meeting Field Development Plan assumptions | = | |
| Group exposed to commodity price risk; energy sales subject to market prices with €0.25/MWh minimum price guarantee | = | |
| Credit risk from cash and cash equivalents held with financial institutions and derivative financial instruments | = | |
| EUR/AUD foreign exchange risks for an Australian company with EUR-denominated expenditures. | = | |
| Foreign exchange risk from future commercial transactions and recognised financial assets/liabilities in non-EUR currencies | = | |
| Group exposed to interest rate risk on debt financing drawdowns; entered swaptions for protection | = | |
| Group's liquidity supported by cash reserves, equity raisings, government grants and committed debt facilities | = | |
| Geopolitische Stabilität für europäische Rohstoffversorgungskette wesentlich. | = | |
| Changes in commodity prices could impact future commercial production feasibility. | = | |
| Geothermal and lithium extraction commodity price exposure across operational segments | = | |
| Personalrekrutierung und -retention während Projektexpansion erforderlich. | = | |
| EU Critical Raw Materials Act (CRMA) Designierung unterliegt regulatorischen Änderungen. | = | |
| Vulcan Energy: first mention in IR-Quarter quarterly report of 2026-01-30 (2025-Q4), source 12 | ||
| €2.2 billion Phase One financing package dependent on continued support from government agencies, commercial banks, and strategic partners | = | |
| Four offtake partners (Glencore, Stellantis, Umicore, LG Energy Solution) for Phase One production; Glencore agreement covers 36,000 to 44,000 tonnes over eight years | = | |
| Phase One depends on SHJV (Sedgman/HOCHTIEF), JordProxa, ABB, NESI for critical engineering and technology delivery | = | |
| Multiple contractor notices to proceed issued; early works and site mobilisation ongoing | = | |
| Project subject to ESIA requirements; updated assessment incorporates Hasenberg well site and biodiversity studies | = | |
| Building permits required for all Phase One facilities; LEP permit secured, ORC and substation permits received 2025 | = | |
| LSC-1a sidetrack experienced wellbore instability in Muschelkalk/Keuper formations; wellbore collapse and blockages prevented completion | = | |
| Geothermal power sale price and lithium commodity pricing subject to market conditions | = | |
| Competitive lithium production environment for EV battery supply chains | = | |
| Vulcan Energy: first mention in IR-Quarter quarterly report of 2025-10-22 (2025-Q3), source 11 | ||
| Lionheart Project financing of €2.2 billion dependent on satisfaction of conditions precedent for Financial Close; completion of financing expected Q2 2026 | 2026-Q1 2026-04-30 15 | |
| Vulcan Energy: first mention in IR-Half half-year report of 2025-09-09 (2025-H1), source 5 | ||
| Dependence on major supply agreements and contractor performance including HOCHTIEF, Siemens, Mersen and other engineering/procurement vendors for project completion | 2026-Q1 2026-04-30 15 | |
| Abhängigkeit von mehreren Offtake-Partnern (Stellantis, Umicore, LG Energy Solution, Glencore). | FY2025 2026-03-26 6 | |
| Forward-looking statements subject to inherent risks and uncertainties including factors specific to industries and general economic conditions | 2026-Q1 2026-04-30 15 | |
| Renewable energy generation economics and grid pricing assumptions for co-product revenue | FY2025 2026-09-09 8 | |
| Phase One offtake agreements with Umicore, LG Energy Solution and Stellantis amended regarding term, volume and commercial operating dates. | = | |
| Vulcan Energy: first mention in IR-Report report of 2025-03-25 (2024-Q4), source 2 | ||
| Lithium and geothermal resource estimates are subject to exploration and development risks. | FY2025 2026-03-26 6 | |
| Risks relating to construction execution and commissioning of G-LEP and CLP. | FY2025 2026-03-26 6 | |
| Operations and financing denominated in EUR with exposure to EUR/AUD exchange rate fluctuations | 2026-Q1 2026-04-30 15 | |
| Dependent on continued access to committed funding and achievement of project milestones | FY2025 2026-09-09 8 | |
| Changes in commodity prices and future legal changes could impact future commercial production. | FY2025 2026-03-26 6 | |
Vulcan Energy Reported KPIs (as disclosed) (200)
Figures Vulcan Energy discloses itself in addition to the standard financials, such as order intake, recurring revenue or unit counts, as reported and with no calculation of our own. NadirAlpha methodology
| KPI | Value / change | Source |
|---|---|---|
| Vulcan Energy, published 2026-07-29, period 2026-Q2 | ||
| Related party payments section 6.1 | €440,000 | 16 |
| Non-executive director fees | €75,000 | 16 |
| Managing director remuneration | €140,000 | 16 |
| Lionheart renewable power co-product | 275 GWh | 16 |
| Lionheart project life | estimated 30-year | 16 |
| Lionheart phase one target production capacity | 24,000 tonnes of lithium hydroxide monohydrate (LHM) | 16 |
| Lionheart heat co-product | 560 GWh | 16 |
| Lionheart electric vehicle batteries per annum | ca. 500,000 | 16 |
| High interest term deposits | €80.0m | 16 |
| Group chief financial officer and executive director remuneration | €117,000 | 16 |
| Exploration expenditure | €0.4m | 16 |
| Executive chair remuneration | €108,000 | 16 |
| Closing cash | €193.9m | 16 |
| Cash and deposits | €273.9m | 16 |
| Vulcan Energy, published –, period 2026-H1 | ||
| Estimated quarters of funding available | 24.8 | 17 |
| Vulcan Energy, published 2026-09-09, period FY2025 | ||
| VULSORB net | 2,412 | 8 |
| Transactions with non controlling interest | (141,299) | 8 |
| Total derivative financial assets | 6,169 (AUD €'000) | 8 |
| Total Reserves | (107,293) | 8 |
| Total Property Plant Equipment | 479,422 | 8 |
| Total LCE Measured | 2,112 | 8 |
| Total LCE Inferred | 17,466 | 8 |
| Total LCE Indicated | 10,265 | 8 |
| Total LCE Combined | 29,822 | 8 |
| Software net | 1,984 | 8 |
| Shares issued advisory services | 72 | 8 |
| Share based payment reserve | 17,793 | 8 |
| Share based payment expense | 856 | 8 |
| Revaluation reserve | (4,107) | 8 |
| Restoration provision | 11,156 | 8 |
| Plant and Equipment | 100,949 | 8 |
| Performance rights on issue | 3,028,139 | 8 |
| Ordinary shares number | 478,660,737 | 8 |
| Operating permit net | 1,772 | 8 |
| NCI balance | 141,299 | 8 |
| Mine Properties in Development | 313,892 | 8 |
| Lionheart Proved Reserves LCE | 318 | 8 |
| Lionheart Probable Reserves LCE | 252 | 8 |
| Land and Buildings | 22,915 | 8 |
| Kuniko Limited shares fair value | 199 | 8 |
| Foreign exchange gain loss | 21 | 8 |
| Foreign currency translation reserve | 21,175 | 8 |
| Financial assets fair value Australian equity | 885 (AUD €'000) | 8 |
| Financial assets FVOCI total | 885 (AUD €'000) | 8 |
| Exploration expenditure incurred | 1,805 | 8 |
| EBITDA | -33,747 | 8 |
| Derivative financial liabilities FX forward | 1,563 | 8 |
| Derivative financial assets USD swaptions | 2,901 (AUD €'000) | 8 |
| Derivative financial assets FX forward | 1 (AUD €'000) | 8 |
| Derivative financial assets EUR swaptions | 3,267 (AUD €'000) | 8 |
| Customer contracts net | 222 | 8 |
| Cosmos Exploration shares fair value | 686 | 8 |
| Cashflow hedge reserve | (855) | 8 |
| Assets under construction | 41,666 (AUD €'000) | 8 |
| Accrued expenses | 30,788 (AUD €'000) | 8 |
| Vulcan Energy, published 2026-04-30, period 2026-Q1 | ||
| Renewable power co-product | 275 GWh per annum | 15 |
| Project life | 30 years | 15 |
| Lionheart production capacity | 24,000 tonnes of lithium hydroxide monohydrate (LHM) per annum | 15 |
| LSC-1 production capacity | 105 to 125 l/s | 15 |
| LSC-1 measured PI range | 2.1 and 2.5 l/s/bar | 15 |
| Heat co-product | 560 GWh per annum | 15 |
| Financing package | €2.2 billion ($AU3.9 billion) | 15 |
| Field development plan targets | ca. 84 to 94 l/s | 15 |
| EV batteries supported per annum | ca. 500,000 | 15 |
| Collateral and restricted cash | €63.4m | 15 |
| At-call deposits | €117.1m | 15 |
| Vulcan Energy, published 2026-03-31, period 2026-Q1 | ||
| Estimated quarters of funding available | 54.0 | 18 |
| Call deposits | 117,136 (EUR €'000) | 18 |
| Bank balances | 247,207 | 18 |
| Vulcan Energy, published 2026-03-26, period FY2025 | ||
| Training sessions completed | 13,000 | 6 |
| Total licence area | 2,408 km² | 6 |
| Total liabilities parent | 7,151 | 6 |
| Total equity parent | 967,013 (EUR €'000) | 6 |
| Total assets parent | 974,164 (EUR €'000) | 6 |
| Strategic placement BNP Paribas | €30m | 6 |
| Strategic investors equity | €133m | 6 |
| Senior debt funding | €1,185m | 6 |
| Retail entitlement offer | €205m | 6 |
| Renewable energy production Insheim | 19.51 GWh | 6 |
| Renewable energy average selling price Insheim | €0.26/kWh | 6 |
| performance rights on issue | 3,346,885 | 6 |
| ore reserves proved LCE | 318 | 6 |
| ore reserves probable LCE | 252 | 6 |
| ordinary shares on issue | 477,903,314 | 6 |
| Mannheim lithium brine resource indicated inferred | 3,225 kt LCE @ 155 mg/l Li | 6 |
| Mannheim geothermal resource recoverable inferred | 377 PJ | 6 |
| Mannheim geothermal resource recoverable indicated | 171 PJ | 6 |
| Mannheim geothermal resource inferred | 10,539 PJ | 6 |
| Mannheim geothermal resource indicated | 2,848 PJ | 6 |
| LSC1 measured depth | 3530m | 6 |
| lost time injury frequency rate | 1.36 | 6 |
| lost time injuries | 1 | 6 |
| lithium resource estimate global | 29.1 Mt LCE | 6 |
| Li4Bat grants total | €104m | 6 |
| KfW equity investment | €150m | 6 |
| institutional placement | €137m | 6 |
| Insheim gross revenue | €4.1m | 6 |
| Glencore offtake volume annual low | 36,000 tonnes | 6 |
| Glencore offtake volume annual high | 44,000 tonnes | 6 |
| German government grants | €204m | 6 |
| financing package total | €2.2 billion | 6 |
| exploration commitments one year | 3,304 | 6 |
| exploration commitments one to five years | 6,242 | 6 |
| equity raising proceeds | €528m | 6 |
| capital commitments one year | 160,521 (EUR €'000) | 6 |
| capital commitments one to five years | 114,610 (EUR €'000) | 6 |
| BNP Paribas Clean Energy Solutions Fund subscription | €15m | 6 |
| bank guarantees issued | 31,181,000 | 6 |
| accumulated losses | -180,768 | 6 |
| accelerated entitlement offer | €261m | 6 |
| Total other income | 4,409 (EUR €'000) | 6 |
| Restoration provision | 11,714 | 6 |
| Other income | 927 (EUR €'000) | 6 |
| Leave obligations | 2,291 | 6 |
| Interest rate swaptions - USD denominated | 2,571 | 6 |
| Interest rate swaptions - EUR denominated | 5,354 | 6 |
| Government grants | 3,482 | 6 |
| EBITDA | -34,669 | 6 |
| EBITDA | -55,291 | 6 |
| Australian listed equity securities | 541 (EUR €'000) | 6 |
| Vulcan Energy, published 2026-01-30, period 2025-Q4 | ||
| Schleidberg production wellsite drilling expenditure | €7.9m | 12 |
| Retail shareholders valid applications | approximately 7.7m | 12 |
| Retail offer raised EUR | approximately €17.3m | 12 |
| Retail offer raised AUD | approximately $31m | 12 |
| Renewable power co-product | 275 GWh | 12 |
| Project life | 30 years | 12 |
| Placement and entitlement offer raised EUR | €398m | 12 |
| Placement and entitlement offer raised AUD | $710m | 12 |
| Payments to related parties section 6 2 | €43,000 | 12 |
| Payments to related parties section 6 1 | €306,000 | 12 |
| Non-Executive Director fees allocation | €74,000 | 12 |
| New shares issued placement and entitlement | ~178m | 12 |
| Managing Director remuneration allocation | €54,000 | 12 |
| Lithium hydroxide monohydrate production capacity | 24,000 tonnes | 12 |
| LSC-1a sidetrack impairment charge | €7.8m | 12 |
| LEP preparatory works expenditure | €2.2m | 12 |
| Institutional shareholders subscriptions | approximately 23.2m | 12 |
| Hochtief sub-underwriting contribution EUR | €147m | 12 |
| Hochtief sub-underwriting contribution AUD | $263m | 12 |
| High-voltage substation facility expenditure | €1.2m | 12 |
| Heat co-product | 560 GWh | 12 |
| HOCHTIEF total investment AUD | $302m | 12 |
| HOCHTIEF investment Phase One project entity | €39m | 12 |
| HOCHTIEF cornerstone subscription shares | €130m | 12 |
| Glencore offtake agreement range | 36,000–44,000 tonnes | 12 |
| Geothermal renewable power production | 6.1 GWh | 12 |
| G-LEP site hectares | approximately 10 hectares | 12 |
| Fixed offer price per share EUR | €2.24 | 12 |
| Fixed offer price per share AUD | $4.00 | 12 |
| Financing package size EUR | €2.2 billion | 12 |
| Financing package size AUD | $3.9 billion | 12 |
| Exploration and evaluation expenditure | €0.1m | 12 |
| Executive Chair remuneration allocation | €97,000 | 12 |
| Electric vehicle batteries per annum | ca. 500,000 | 12 |
| Development expenditure | €14.9m | 12 |
| CLP preparatory works expenditure | €2.7m | 12 |
| CFO Executive Director remuneration allocation | €81,000 | 12 |
| Average geothermal power selling price | €0.262/kWh | 12 |
| Vulcan Energy, published 2025-10-22, period 2025-Q3 | ||
| Well LSC1A depth | 3,700 | 11 |
| Well LSC1 depth | 3,530 | 11 |
| Phase one power capacity | 275 | 11 |
| Phase one lithium capacity | 24,000 | 11 |
| Lithium resource Mannheim inferred | 2,405 | 11 |
| Lithium resource Mannheim indicated | 820 | 11 |
| Geothermal resource Mannheim inferred | 377 | 11 |
| Geothermal resource Mannheim indicated | 171 | 11 |
| Geothermal production GWh | 4.4 | 11 |
| Average selling price power | €0.260 | 11 |
| Vulcan Energy, published 2025-09-30, period 2025-Q3 | ||
| Estimated quarters of funding available | 5.2 | 13 |
| Call deposits | 5,688 (EUR €'000) | 13 |
| Bank balances | 41,266 | 13 |
| Vulcan Energy, published 2025-09-09, period 2025-H1 | ||
| share-based payment reserve | 13,729 | 5 |
| restoration provision non-current | 5,560 | 5 |
| lease liabilities total | 7,625 | 5 |
| financial assets FVOCI | 737 | 5 |
| bank guarantees | 5,091 | 5 |
| Phase One renewable heat target | 560 GWh annually | 5 |
| Phase One production target | 24,000 tonnes per annum | 5 |
| Phase One electricity target | 275 GWh annually | 5 |
| Mannheim lithium resource | 3,225 kt LCE | 5 |
| Mannheim geothermal resource inferred | 10,539 PJ | 5 |
| Mannheim geothermal resource indicated | 2,848 PJ | 5 |
| lithium resource estimate | 29.1 Mt LCE | 5 |
| geothermal power production | 9,000 MWh | 5 |
| geothermal heat revenue | €2.31 million | 5 |
| average electricity price | €0.258/kWh | 5 |
| Vulcan Energy, published 2025-03-25, period 2024-Q4 | ||
| share price closing | 5.35 | 2 |
| net current assets surplus | 86,837 | 2 |
| total equity | 417,871 (EUR €'000) | 2 |
| right-of-use assets total | 3,836 (EUR €'000) | 2 |
| revolving credit facility available | 10,000 | 2 |
| performance rights issued | 2,231,500 | 2 |
| Leave obligations | 1,523 | 2 |
| Government grants current | 2,110 | 2 |
| Deferred tax liability | 1,535 | 2 |
| Deferred tax asset | 3,568 (EUR €'000) | 2 |
| Bank guarantees | 3,707,000 | 2 |
| Accumulated losses | -111,193 | 2 |
| Accrued expenses | 3,852 (EUR €'000) | 2 |
| Vulcan Energy, published –, period 2026-Q1 | ||
| Estimated quarters of funding available | 72.2 | 14 |
Vulcan Energy Development
A condensed summary of Vulcan Energy per reporting period as running text: what changed operationally, which drivers management names, how earnings and cash flow developed. NadirAlpha methodology
FY2026: Vulcan Energy
Vulcan Energy Resources achieved Financial Close on the €2.2 billion Lionheart Phase One equity and debt financing package in Q2 2026 16, marking the most significant milestone in the company's transition from development to active construction. During the year, German authorities issued the first lithium production permit for the Lionheart project and the State of Rhineland-Palatinate granted a five-year royalty exemption on lithium production until 31 December 2030 15. Major construction activities commenced at both the geothermal and lithium extraction plant site in the Upper Rhine Valley and the lithium chemicals plant in Frankfurt 15 16. Capital expenditure reached 92 million in the June quarter, with 193.9 million cash on hand and net cash of 192.3 million at quarter end 16 17. Customer receipts remained at de minimis levels as the company continues its pre-production development phase 18.
FY2025: Vulcan Energy
Vulcan Energy Resources generated 7.3 million in revenue in FY2025, primarily from the Natürlich Insheim geothermal plant's 19.51 GWh of gross renewable power at an average selling price of €0.26/kWh, with total revenue lower year-over-year as drilling personnel outsourcing and service revenues declined 6. Vulcan Energy recorded a net loss of 69.6 million for the year, with a diluted loss per share of 0.30, as ongoing development and corporate costs grew alongside the advancement of the Lionheart Project 6. A pivotal technical milestone was reached in January 2025 with the first fully integrated production of battery-quality lithium hydroxide monohydrate in Europe at the CLEOP facility in Frankfurt, and the project was subsequently designated a Strategic Project under the EU Critical Raw Materials Act in March 2025 5. In December 2025, Vulcan Energy completed a €2.2 billion financing package comprising senior project debt, government grants and strategic equity investments, enabling a positive Final Investment Decision on Lionheart and commencement of construction at the G-LEP site in Landau, with cash and equivalents rising to 517.8 million at year-end 6.
FY2024: Vulcan Energy
In FY2024, Vulcan Energy Resources generated revenue of EUR 8.1 millionm, 19.7% higher than the prior year, while the net loss widened to EUR 42.4 millionm compared with €27.0m in 2023 2. Vulcan Energy reached a pivotal technical milestone by producing battery-quality lithium hydroxide monohydrate at the CLEOP downstream plant, marking the first fully integrated battery-quality LHM produced in Europe from resource to final product 2. On the financing side, Vulcan secured a €879m conditional debt commitment from Export Finance Australia and seven commercial banks, and the European Investment Bank Board approved up to €500m in financing participation for the Phase One Lionheart Project 2. The group raised €134m in equity capital during 2024, and cash and cash equivalents stood at EUR 97.1 millionm at year end 2.
Glossary
- Revenue: Revenue from contracts with customers, net of sales deductions, as the company itself reports it; not total output, gross revenue, GMV or order intake.
- Net income: Net income attributable to the shareholders of the parent, after discontinued operations; not the result including minority interests, not comprehensive income.
- EPS: Diluted earnings per share attributable to the shareholders of the parent; a printed figure always beats a calculated one, calculated values are marked.
- FCF: Free cash flow = operating cash flow minus capital expenditure on property, plant and equipment; the company's own free cash flow figure is shown separately.
- OCF: Cash flow from operating activities as reported; IFRS companies may show interest paid in financing cash flow, so the figure is not always comparable.
- Cash: Cash and cash equivalents, without securities unless the company reports them as part of the position.
- Net Debt: Net debt = financial debt excluding lease liabilities minus cash at the same reporting date; the company's own net position may differ.
- *: derived, the formula is in the hover
- ≈: calculated, approximation
- ~: uncertain; the value stays visible, verdicts do not use it
- °: repaired by a targeted query against the document, or curated with documentary evidence
- EBIT: EBIT as a fallback: the income statement carries no operating line
- basic: basic earnings per share as a fallback when diluted is missing
Sources: quarterly reports, annual reports and investor relations documents
The evidence base for Vulcan Energy stock: every document with type and date, every figure in the report leads here by number and to the original by link. NadirAlpha methodology
| # | Document type | Published |
|---|---|---|
| #9 | IR-Report report | – |
| #10 / #106 | IR-Report report | – |
| #14 | IR-Quarter quarterly report | – |
| #17 | IR-Quarter quarterly report | – |
| #2 / #101 | IR-Report report | 2025-03-25 |
| #5 / #102 | IR-Half half-year report | 2025-09-09 |
| #13 | IR-Quarter quarterly report | 2025-09-30 |
| #11 | IR-Quarter quarterly report | 2025-10-22 |
| #12 / #108 | IR-Quarter quarterly report | 2026-01-30 |
| #6 / #103 | IR-Annual annual report | 2026-03-26 |
| #18 | IR-Quarter quarterly report | 2026-03-31 |
| #15 | IR-Quarter quarterly report | 2026-04-30 |
| #16 | IR-Quarter quarterly report | 2026-07-29 |
| #8 / #104 | IR-Annual annual report | 2026-09-09 |
Vulcan Energy Stock FAQ
Where can I find the official investor relations documents of Vulcan Energy?
NadirAlpha links all 14 original filings used (IR documents) in the sources chapter: quarterly report, report, annual report, each with type, publication date and a direct link; every figure in the report carries a source number.
More reports by NadirAlpha
Recently updated
Comparable stocks: Basic Materials from Australian
All reports · Australian Stocks (4) · Basic Materials Stocks (5)