OHB Stock OHB.DE
OHB is a German space technology group that designs, manufactures, and integrates satellites and space systems for civil, scientific, and defense applications. OHB stock (OHB.DE): Quarterly and annual results since 2023 from Quarterly Report and IR documents: revenue, earnings, balance sheet, cash flow and management guidance, every figure with its source. As of 08/2026, quarterly reporting. Stock analysis by NadirAlpha. OHB stock (OHB.DE): listed on Xetra, WKN 593612. NadirAlpha has evaluated 28 original documents, cross-checked every figure automatically and linked each to its source; sources as of 08/2026. Revenue Q2 2026: EUR 329 million (+7% year on year). Latest reported (Q2 2026): Equity ratio, ROCE, Return on Capital Employed (ROCE). Latest reading: Operating income turned negative, Revenue decelerating, Order intake, Partnership, Net debt to net cash.
AI-generated report · not investment advice · figures extracted automatically; please verify against the linked original more
OHB Current Status
Where OHB stands after the report for Q2 2026: what changed in revenue, earnings and outlook, written editorially from the original report. NadirAlpha methodology
Assessment by NadirAlpha, as of Q2 2026.
“We are proud to contribute to Vigil, a mission that will play a decisive role in protecting critical infrastructure on Earth.”
(translation, original on hover)
“The transaction will enable us to advance our growth together with existing and new investors who wish to be part of Europe's strategic independence in space.”
(translation, original on hover)
OHB Stock: Key Figures (€ million)
Revenue, margin, earnings and EPS of OHB per fiscal year, half-year and quarter in € million, as of Q2 2026, as reported in the filing; restatements show the most recent filing version. NadirAlpha extracts all values automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original. NadirAlpha methodology
All figures serve only to support your own investment decision and are not a recommendation; the company's original reports are authoritative.
Fiscal years
| Period | Revenue | Op. income | Net income | EPS (€) | EBITDA (adj.) | OCF | Source |
|---|---|---|---|---|---|---|---|
| FY2025 | 1,215.5 | 73.3EBIT | 50 | 2.61 | 125.6 | 38.5 | 11 |
| FY2024 | 1,001.5 | 14.1EBIT | -0.2 | -0.01 | 111.1 | 159.8 | 3 |
| FY2023 | 1,047.8 | 125EBIT | 71.3~ | 4.10 | 87.1 | -61.8 | 1 |
Quarters
| Period | Published | Revenue | Op. income | Net income | EPS (€) | EBITDA (adj.) | FCF | Cash | Net Debt | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| 2026-Q2* | 2026-07-30 | 329.2 | -0.3EBIT | -5.1 | -0.27 | 33 | -91.8 | 526.9 | -187.4~ | 5 |
| 2026-Q1* | 2026-05-20 | 270.9 | 15.2EBIT | 9.9 | 0.52 | 27.3 | -120 | 54.3 | 183 | 117 |
| 2025-Q4* | 2026-03-17 | 394.7 | 27.4 | 26.2 | 1.38*≈ | 44.6 | – | 220.6 | 59.6 | 11 |
| 2025-Q3* | 2025-11-13 | 283.9 | 23.4EBIT | 12.4 | 0.65~ | 35 | -24 | 53.4 | 210.3 | 113 |
| 2025-Q2* | 2025-08-07 | 307.7 | 14.5EBIT | 7.1 | 0.37~ | 25.9 | -11.9 | 52.8 | 180.6 | 7 |
| 2025-Q1* | 2025-08-07 | 228.7 | 9.5EBIT | 5~ | 0.26 | 22.1 | -107.1 | 45.9 | 152.1 | 119 |
| 2024-Q4* | 2025-04-29 | 519.3 | -20.6 | -17.6 | -0.92*≈ | 38.6 | – | 118 | 41 | 3 |
| 2024-Q3* | 2025-11-13 | 233.1 | 18.9EBIT | 12 | 0.63 | 31.8 | 32.4 | 23.4 | 233.4 | 9 |
| 2024-Q2* | 2025-08-07 | 255.2 | 5.6EBIT | 0.6 | 0.03 | 21.4 | -48 | 51.9 | 249.9~ | 111 |
| 2024-Q1* | 2025-08-07 | -6.1~ | 10.2EBIT | 4.7 | 0.25 | 20 | -42.4 | 23.7 | 194.8 | 7 |
| 2023-Q4* | 2024-04-22 | 329.2 | 88.1 | 52.3 | 2.76*≈ | 23 | – | 141.1 | 147.2 | 1 |
| 2023-Q3* | 2026-07-30 | 274.8 | 10.9EBIT | 5.3 | 0.30 | 20 | -16.4 | 25.3 | 327.4 | 132 |
| 2023-Q2* | 2026-07-30 | 246.6 | 13.4EBIT | 6.6 | 0.38≈ | 22.6 | -50.6 | – | 235.4~ | 130 |
| 2023-Q1* | 2026-07-30 | 197.2 | 12.5EBIT | 7.1 | 0.41≈ | – | -62.9 | – | 169.4 | 21 |
OHB Balance Sheet & Cash Flow (€ million)
Balance sheet and cash flow of OHB up to Q2 2026 in € million: net debt = financial debt minus cash, free cash flow = operating cash flow minus capex, every input sourced. NadirAlpha extracts all values automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original. NadirAlpha methodology
Fiscal years
| Period | Published | Cash | Debt | Net Debt | OCF | Capex | FCF | Source |
|---|---|---|---|---|---|---|---|---|
| FY2025 | 2026-03-17 | 220.6 | 280.2 | 59.6 | 38.5 | – | – | 11 |
| FY2024 | 2025-04-29 | 118 | 159.1 | 41 | 159.8 | 0.7 | 159.1 | 3 |
| FY2023 | 2024-04-22 | 141.1 | 288.3 | 147.2 | -61.8 | 4.3 | -66.1 | 1 |
Quarters
| Period | Published | Cash | Debt | Net Debt | OCF | Capex | FCF | Source |
|---|---|---|---|---|---|---|---|---|
| 2026-Q2 | 2026-08-06 | 526.9 | 339.6 | -187.4~ | -82 | 9.8 | -91.8 | 119 |
| 2026-Q1 | 2026-05-20 | 54.3 | 237.2 | 183 | -112.5 | 7.5 | -120 | 117 |
| 2025-Q4 | 2026-03-17 | 220.6 | 280.2 | 59.6 | 166.2 | – | – | 11 |
| 2025-Q3 | 2025-11-13 | 53.4 | – | 210.3 | -20.2 | 3.8 | -24 | 113 |
| 2025-Q2 | 2025-08-07 | 52.8 | – | 180.6 | -7 | 4.9 | -11.9 | 7 |
| 2025-Q1 | 2025-08-07 | 45.9 | 198 | 152.1 | -100.6 | 6.6 | -107.1 | 119 |
| 2024-Q4 | 2025-11-13 | 118 | 159.1 | 41 | 207.5 | – | – | 9 |
| 2024-Q3 | 2025-11-13 | 23.4 | 256.8 | 233.4 | 35.5 | 3.2 | 32.4 | 9 |
| 2024-Q2 | 2025-08-07 | 51.9 | 301.8 | 249.9~ | -45.3 | 2.7 | -48 | 111 |
| 2024-Q1 | 2025-08-07 | 23.7 | 218.5 | 194.8 | -38 | 4.4 | -42.4 | 7 |
| 2023-Q4 | 2026-07-30 | 141.1 | 288.3 | 147.2 | 54.6 | – | – | 24 |
| 2023-Q3 | 2026-07-30 | 25.3 | – | 327.4 | -10.7 | 5.7 | -16.4 | 132 |
| 2023-Q2 | 2026-07-30 | – | – | 235.4~ | -47.2 | 3.4 | -50.6 | 130 |
| 2023-Q1 | 2026-07-30 | – | – | 169.4 | -58.5 | 4.3 | -62.9 | 21 |
OHB Guidance Tracking (latest per metric/period · 17/25)
All forecasts (guidance) of the OHB management and their later outcome: per metric and period the most recent statement applies, the status is checked against the reported actuals. NadirAlpha methodology
Actuals: revenue in €m · ratios in %
Direction: confirmedcutinitiated Verdict: beatin linemisspending
| For period | Guided on | Metric | Guided | Actual | Verdict | Direction | Source |
|---|---|---|---|---|---|---|---|
| FY2026 | 2026-08-06 | Revenue | 1,400 | – | 15 | ||
| FY2026 | 2026-08-06 | EBITDA margin | 10.5–11% | – | 16 | ||
| FY2026 | 2026-08-06 | EBITDA (adjusted) | 10.5–11% | – | 15 | ||
| FY2026 | 2026-07-30 | Total operating performance | 1,400 | – | 16 | ||
| FY2026 | 2026-03-17 | EBIT margin | 8% | – | 12 | ||
| FY2026 | 2026-03-17 | Total output | 1,400 | – | 11 | ||
| FY2026 | – | EBITDA | 121 | – | 17 | ||
| FY2026 | – | EBIT | 58 | – | 17 | ||
| FY2025 | 2026-07-30 ° | Consolidated total output | 1,200 | – | – | 5 | |
| FY2025 | 2025-11-13 | Revenue (total output) | 1,200 | – | – | 9 | |
| FY2025 | 2025-08-07 | EBITDA (adjusted) | 9% | 125.6 | – | 7 | |
| FY2025 | 2025-08-07 | Operating income | 6% | – | – | 7 | |
| FY2025 | 2025-04-29 | Revenue | 1,200 | 1,215.5 | 10 | ||
| FY2025 | 2025-04-29 | EBITDA margin | 9% | 9.4 | 5 | ||
| FY2025 | 2025-04-29 | EBIT margin | 6% | 6 | 5 | ||
| FY2025 | – | EBITDA | 101 | 114.8 | 17 | ||
| FY2025 | – | EBIT | 50 | 73.3 | 17 | ||
| FY2024 | 2024-04-22 | Revenue | 1,300–1,400 | 1,001.5 | 2 | ||
| FY2024 | 2024-04-22 | EBITDA margin | 8.5% | 5.3 | 21 | ||
| FY2024 | 2024-04-22 | EBIT margin | 6% | 1.4 | 21 | ||
| FY2024 | 2024-04-22 | Total output | 1,300–1,400 | – | – | 21 | |
| FY2024 | – | EBITDA | 76 | 53.2 | 17 | ||
| FY2024 | – | EBIT | 40 | 14.1 | 17 | ||
| FY2023 | – | EBITDA | 107 | 162.1 | 17 | ||
| FY2023 | – | EBIT | 52 | 125 | 17 |
OHB Stock: Price & Chart
Chart and key figure trend of OHB stock: the TradingView chart starts only on click, the key figure chart comes from the core tables up to Q2 2026. NadirAlpha methodology
Daily candles with news and earnings markers. Loads only on click.
OHB Event Timeline
NadirAlpha sorts 46 events of OHB by quarter, most recent first, each with source number and event type, management quotes as direct quotes at the start of the quarter. NadirAlpha methodology
2026 · 11 events
“The transaction will allow us to accelerate our growth alongside existing and new investors who want to be part of Europe's strategic independence in space.”
“Based on the high order backlog and the positive business development after three months, we expect the financial and asset position to continue to develop favourably.”
(translation, original on hover)
Q2 operating income turned to -0.3 million and net income to a loss of 5.1 million 119
Capital increase in two tranches raised EUR 484 million gross proceeds, shifting the balance sheet from net debt to a net cash position of 187.4 million 15
Joint ventures OHB Rheinmetall Space Networks (SATCOMBw Phase 4) and KIRK (with Helsing, HENSOLDT, Kongsberg Defence & Aerospace for space-based tactical surveillance) established 15
Order intake / order book: auftragsbestand EUR 2.3m; auftragsbestand aerospace EUR 162.0m; auftragsbestand digital EUR 133.0m; auftragsbestand space systems EUR 1.4m; order backlog at march 31 EUR 2,314,191.0m; order backlog EUR 3,303,843.0m; order intake EUR 3.3m 15
“LISA is an impressive example of how we at OHB regularly contribute to finding answers to the complex questions of our time.”
“At the end of this quarter, we bid farewell to Kurt Melching as he retired. During his 37 years with the company, including as a member of the Executive Board of OHB SE since 2018, Kurt Melching has shaped OHB like few others. We therefore wish to express our sincere gratitude to him here, first and foremost, for his extraordinary commitment to OHB, and to wish him all the best for the future.”
(translation, original on hover)
“At EUR 5.1 billion, compared with EUR 3.5 billion, Germany remains the largest contributor in the next ESA cycle, ahead of France and Italy.”
(translation, original on hover)
Total operating performance reached EUR 1,247.6 million, up 21%, exceeding OHB's forecast of around EUR 1,200 million; EBITDA SPACE SYSTEMS segment more than doubled year on year 11 12
Revenue rose 18.2% to 270.9 million; order backlog expanded to EUR 3,353.6 million from EUR 2,314.2 million a year earlier 13
OHB Sweden secured its largest-ever contract for the 20-microsatellite EPS-Sterna constellation, entering volume microsatellite production 13
OHB Italia appointed ESA prime contractor for Ramses planetary defense mission to observe asteroid Apophis 13
2025 · 12 events
Operating income more than doubled YoY (14.1 to EUR 73.3 million, +420%). 115
ESA Ministerial Conference approved a record EUR 22.3 billion budget for the next funding cycle in November 2025; Germany committed EUR 5.1 billion 11
First batch of Eaglet-2 satellites launched in November 2025 under the Galileo program; first batch of eight IRIDE constellation satellites transported to Vandenberg Space Force Base for launch on November 10 11 9
Operating cash flow turned positive on a half-year basis (2025-H1: -107.6 to 2025-H2: +EUR 146.0 million, aggregated from reported quarters where needed). 115
“As a long-standing partner of our national institutional customers, we are ready to continue contributing to the protection of this "Achilles' heel" in the future. With our expertise built up over decades along the entire value chain, we consider ourselves ideally positioned for this.”
Nine-month consolidated revenues reached EUR 863.5 million, up from EUR 715.8 million in the prior year; adjusted EBITDA rose to EUR 80.9 million from EUR 72.5 million 10
H1 total operating performance increased to EUR 563.5 million from EUR 470.5 million in H1 2024 7 8
H1 EBIT margin improved to 4.0% from 3.4% in the prior-year period; H1 EBIT rose to EUR 22.6 million from EUR 15.8 million 7 8
OHB System AG contracted as prime contractor for ESA's LISA gravitational-wave mission, contract valued at EUR 839 million, lifting the order backlog to EUR 3,067 million from EUR 2,382 million at year-end 2024 7 8
Operating income more than doubled YoY (5.6 to EUR 14.5 million, +159%). 119
2024 · 20 events
Free cash flow turned positive for the first time after 1 negative fiscal year (-66.1 to +EUR 159.1 million). 115
Operating income more than halved YoY (125.0 to EUR 14.1 million, -89%). 115
“The launch was a huge success for the entire European space industry.”
“The successful launch was a very great success for the entire European space industry.”
(translation, original on hover)
Operating cash flow reached EUR 207.5 million vs EUR 54.6 million in 2023-Q4 (×3.8). 109
Operating cash flow turned positive on a half-year basis (2024-H1: -83.3 to 2024-H2: +EUR 243.0 million, aggregated from reported quarters where needed). 109
Net income attributable to shareholders turned negative at EUR -196 thousand (2023: EUR 71.3 million), driven by EUR 37.5 million project disruption provision and EUR 15.4 million in transformation costs 4
Q4 EBIT turned negative at -20.6 million; EUR 37.5 million satellite project disruption provision recognized for possible rebuild obligation 3
Revenue fell to 1,001.5 million from EUR 1,047.8 million; total performance down 13% to EUR 1,030.2 million due to late order intake shifts and project milestone delays 3
Order intake rose to approximately EUR 1.7 billion, an over 80% year-on-year increase, lifting backlog to EUR 2,382 million from EUR 1,749 million 4
Hera space probe launched successfully on October 7, 2024 to study effects of asteroid deflection 4
Vega-C resumed flight operations in December 2024 following earlier grounding 3
Voluntary public takeover bid by KKR successfully completed in September 2024; KKR holds approximately 28.6% of OHB SE shares 4
RFA ONE experienced first stage fire during August 2024 S1 stage test, delaying maiden flight timeline 4
Ariane 6 launcher completed maiden flight on July 9, 2024, restoring Europe's autonomous access to space 4
“Even in these challenging times, we continue to look to the future with confidence.”
(translation, original on hover)
“We continue to face the future with confidence, even in these challenging times.”
Operating income more than halved YoY (13.4 to EUR 5.6 million, -58%). 111
EBIT reached 125 million, exceeding guidance of EUR 70 million; EBITDA reached EUR 162 million against guidance of EUR 109 million 1 2
Revenue reached 1,047.8 million, exceeding guidance of EUR 1,176 million and above the prior-year level of EUR 944.5 million 2
2023 · 3 events
Operating cash flow turned positive on a half-year basis (2023-H1: -105.7 to 2023-H2: +EUR 43.9 million, aggregated from reported quarters where needed). 132
Strategic partnership with KKR completed in December 2023: 10% capital increase in OHB SE and EUR 30 million investment in Rocket Factory Augsburg; Fuchs family retained approximately 65.35% of shares post-transaction 2
OHB Business Model
The OHB business model in brief: products, customers and revenue sources as the company itself describes them in its reports. NadirAlpha methodology
OHB is a German space technology group that designs, manufactures, and integrates satellites and space systems for civil, scientific, and defense applications. The company earns revenue primarily through long-term contracts with institutional customers, including the European Space Agency, the European Commission, and national defense ministries, covering satellite prime contracting, launch vehicle structural components, and ground segment services. Revenue is recognized on a percentage-of-completion basis as program milestones are achieved, producing multi-year revenue visibility alongside capital-intensive working-capital profiles. The group operates across three principal areas: satellite systems (civil and scientific missions as prime contractor), access to space (launch vehicle structural components manufactured by MT Aerospace, principally for Ariane 6), and digital and defense services including military communications infrastructure and earth observation data services. Subsidiaries extend capabilities into communications subsystems (Antwerp Space), maritime data and satellite services (LuxSpace), micro-launcher development (RFA), and navigation algorithm development (OHB Austria). Defense, security, and dual-use space applications have grown in strategic importance, with increasing emphasis on military satellite communications, space-based surveillance systems, and AI-assisted satellite manufacturing industrialization, reflected in accelerated joint-venture formation across the defense and institutional space domain.
OHB Stock: Share-Price Drivers
The drivers of OHB stock from the company's perspective: demand, prices, costs and capacity as the investor relations reports describe them. NadirAlpha methodology
Telecommunications and navigation satellites are OHB's largest revenue line at EUR 314.0 million in FY2025 (11), and group revenue rose to 329.2 million in 2026-Q2 from 307.7 million a year earlier (119), so the pace of programme delivery is the main swing factor for the top line.
OHB's telecommunications and navigation satellites line reached EUR 314.0 million in FY2025 (11); the company is building the IRIS2 sovereign constellation (11, 12) and delivered Galileo navigation satellites from September 2024 (23), pointing to programmes that are gaining traction.
OHB reported reconnaissance and space security revenue of EUR 131.2 million in FY2025 (11), supported by sovereign and defence work such as the SATCOMBw3 mission (12).
OHB's science and exploration activity carried missions including Hera, launched in October 2024 (11), with Ramses, EnVision and the Argonaut lunar lander still in the pipeline (11).
OHB contributes to the Ariane 6 launcher, which flew its initial launch in 2024 (12), and further launches are planned for mid-2026 (11), indicating the programme is moving into operational cadence.
OHB posted an operating cash outflow of 82 million in 2026-Q2 (119) on heavy working-capital needs, while cash stood at 526.9 million (119) following a EUR 350 million credit facility restructuring (12).
OHB swung to an operating result of -0.3 million and a net loss of 5.1 million in 2026-Q2 (119), against an operating profit of 14.5 million a year earlier, so margins moved lower despite the higher revenue.
Sector trend: Demand for institutional and defence space programmes is rising, with sovereign constellations such as IRIS2 and missions like SATCOMBw3 adding to the order book (11, 12). Programme ramp costs and large working-capital swings are weighing on near-term operating margins and cash flow (119).
OHB Revenue by Type (as of 2026-Q2 · EUR million · 14/25)
The segments of OHB in the company's own definition, each row with its basis (3, 6 or 12 months), rows in grey are no longer reported separately. NadirAlpha methodology
| Segment | Since | Revenue | Margin | Source |
|---|---|---|---|---|
| Period 2026-Q2 (6M) | ||||
| Holding | 2026-Q2 | 458.7 | – | 15 |
| Period 2026-Q1 (3M) | ||||
| ACCESS TO SPACE | 2025-Q1 | 43.8 | – | 14 |
| DIGITAL | 2023-Q1 | 30.5 | – | 14 |
| SPACE SYSTEMS | 2018-H1 | 203.3 | – | 14 |
| Period FY2025 (12M) | ||||
| Science and Environmental and Weather Satellites | FY2025 | 242.6 | – | 11 |
| Tanks and Structures, Special Manufacturing Processes and Hydrogen Technologies, Launcher Components | FY2025 | 139.8 | – | 11 |
| Satellite Data Analytics, Applications and Satellite Operations, Ground Systems | FY2025 | 74.9 | – | 11 |
| Rail Infrastructure | FY2025 | 23.2 | – | 11 |
| Professional Services and Other | FY2025 | 15 | – | 11 |
| Telescopes, Cybersecurity and Encryption | FY2025 | 10.3 | – | 11 |
| Telecommunications and Navigation Satellites | FY2023 | 314 | – | 11 |
| Exploration and Other | FY2023 | 264.5 | – | 11 |
| Reconnaissance and Space Security | FY2023 | 131.2 | – | 11 |
| Period 2025-Q1 (3M) | ||||
| AEROSPACE | 2023-Q1 | 32.9 | 4.7% | 6 |
| Period FY2024 (12M) | ||||
| Telecommunications and Navigation Satellites | FY2023 | 256.2 | – | 4 |
| Science and Exploration (and Other) | FY2023 | 251.3 | – | 4 |
| Reconnaissance and Space Security | FY2023 | 160.4 | – | 4 |
| Environmental and Weather Satellites | FY2023 | 150 | – | 4 |
| Period FY2023 (12M) | ||||
| Environmental and Weather Satellites | FY2023 | 250.4 | – | 1 |
| Tanks and Structures, Special Manufacturing Processes and Launcher Components | FY2023 | 122.9 | – | 2 |
| Satellite Data Analytics, Applications and Satellite Operations | FY2023 | 73.9 | – | 2 |
| Ground systems (and miscellaneous) | FY2023 | 32.4 | – | 2 |
| Telescopes, cybersecurity and encryption | FY2023 | 12.6 | – | 2 |
| Railroad infrastructure, hydrogen technologies (and miscellaneous) | FY2023 | 7.9 | – | 2 |
| Period 2019-H1 (6M) | ||||
| Aerospace + Industrial Products | 2018-H1 | 87.8 | 4.5% | 28 |
OHB Products & announcements (59/96 active+recent)
What OHB launched, had approved or announced, from the filings up to Q2 2026, each row with the date of first mention. NadirAlpha methodology
Status: PlannedLaunchedDiscontinued
| Product/Line | Since | Status | Source |
|---|---|---|---|
| 2034 | |||
| Sentinel-3-NGO Mission | 2034 | 24 | |
| 2031 | |||
| Vigil space weather mission launch | 2031 | 16 | |
| 2030 | |||
| Zero-Debris satellite platform development | 2030 | 22 | |
| 2029 | |||
| Harmony mission launch | 2029 | 24 | |
| Comet Interceptor | 2029 | 21 | |
| 2028 | |||
| Ramses asteroid observation mission | 2028-04 | 23 | |
| ExoMars Rover mit MT Aerospace Tanks | 2028-03 | 7 | |
| RAMSES probe launch | 2028 | 15 | |
| RAMSES probe launch | 2028 | 16 | |
| ORACLE lunar payload (oxygen extraction) | 2028 | 7 | |
| ExoMars Rosalind Franklin rover launch | 2028 | 8 | |
| 2027 | |||
| PLATO space telescope environmental testing | 2027-01 | 16 | |
| 2026 | |||
| PLATO (Space probe) | 2026-12 | 10 | |
| Harmony mission arrival at asteroid system | 2026-10 | 24 | |
| Sardinia Radio Telescope Upgrade | 2026-06 | 5 | |
| RAMSES spacecraft integration start | 2026-06 | 15 | |
| LEO-PNT mission (3x) | 2026-06 | 12 | |
| Genesis mission | 2026-06 | 21 | |
| OHB SPACE UK EnVision mission contract | 2026-05 | 15 | |
| Eaglet-2 satellites (2x) | 2026-03 | 11 | |
| EPS-Sterna microsatellite constellation | 2026-03 | 14 | |
| Ariane 6 maiden flight with four boosters | 2026-02 | 13 | |
| Two further Ariane 6 launches | 2026 | 11 | |
| PLATO Observatory | 2026 | 21 | |
| PLATO mission (4x) | 2026 | 15 | |
| OHB Czechspace SOVA-S mission (2x) | 2026 | 16 | |
| IRIDE Constellation | 2026 | 21 | |
| Flyeye telescope conversion | 2026 | 7 | |
| Flyeye telescope installation at Mount Mufara | 2026 | 8 | |
| Ariane 6 launches scheduled | 2026 | 12 | |
| Ariane 6 programme ramp-up | 2026 | 11 | |
| 2025 | |||
| Galileo satellites | 2025-12 | 11 | |
| IRIDE Constellation (First batch) | 2025-11 | 10 | |
| QUBE small satellite operational | 2025-09 | 10 | |
| OHB Digital Connect Darmstadt facility opening | 2025-09 | 10 | |
| MTG-S1 satellite (3x) | 2025-07 | 11 | |
| CALLISTO hydrogen tank | 2025-06 | 21 | |
| constellr payload launch into orbit | 2025-03 | 3 | |
| Ariane 6 second commercial flight | 2025-03 | 6 | |
| Ariane 6 commercial launch | 2025-03 | 11 | |
| constellr GmbH microsatellite SkyBee-1 | 2025-01 | 11 | |
| SkyBee-1 satellite payload launch | 2025-01 | 12 | |
| constellr GmbH constellation of microsatellites | 2025 | 12 | |
| constellr GmbH constellation | 2025 | 3 | |
| Themis reusable rocket stage | 2025 | 7 | |
| SATCOMBw3 mission implementation | 2025 | 12 | |
| Meteosat Third Generation Sounder satellite launch | 2025 | 22 | |
| MTG-S1 satellite launch (3x) | 2025 | 12 | |
| Luxembourg reconnaissance satellite launch planned | 2025 | 3 | |
| IRIS2 satellite constellation programme | 2025 | 11 | |
| Galileo navigation constellation expansion | 2025 | 4 | |
| EOTideLine product launch (2×) | 2025 | 6 | |
| EAGLET II satellite launch (2×) | 2025 | 14 | |
| Argonaut lander lunar mission | 2025 | 11 | |
| 2024 | |||
| NAOS satellite launch (8x) | 2024-09 | 8 | |
| Ariane 6 maiden flight (2x) | 2024-07 | 14 | |
| Meteosat Third Generation (MTG) satellites (2×) | 2024 | 3 | |
| GARAI-B satellite (3x) | 2024 | 7 | |
| 2023 | |||
| Rocket Factory Augsburg Argo crew capsule (2x) | 2023-01 | (2023-01) | 21 |
| 2026 | |||
| Mission Ramses (4x) | 2026-03 | 24 | |
| 2024 | |||
| Vega-C launch vehicle | 2024-12 | 4 | |
| Vega-C flight operations resumption | 2024-12 | 3 | |
| Hera mission (3×) | 2024-10 | 11 | |
| Hera asteroid probe (2x) | 2024-10 | 23 | |
| Hera asteroid probe | 2024-10 | 24 | |
| VIGIL mission (B2/C/D definition study) | 2024-09 | 3 | |
| CityCLIM project completion | 2024-09 | 22 | |
| Ariane 6 launcher | 2024-07 | 4 | |
| Ariane 6 initial launch | 2024-07 | 3 | |
| RFA ONE launch vehicle | 2024-06 | 21 | |
| Ariane 6 launch vehicle (2×) | 2024-06 | 23 | |
| Ariane 6 initial launch | 2024-06 | 12 | |
| QUBE quantum key distribution mission | 2024 | 22 | |
| QUBE (research satellite) | 2024 | 9 | |
| MTG Sounder satellite successfully tested | 2024 | 3 | |
| Galileo navigation satellites (2x) | 2024 | 23 | |
| Galileo satellite launches (two satellites April, two satellites September) | 2024 | 3 | |
| AtLAST telescope study completion | 2024 | 22 | |
| Ariane 6 production lots FM16-FM42 | 2024 | 22 | |
| Arctic Weather Satellite (6×) | 2024 | 24 | |
| 2023 | |||
| Vega-C resumption of flight operations | 2023-12 | 2 | |
| SARah reconnaissance satellite constellation | 2023-12 | 1 | |
| Heinrich-Hertz mission (3x) | 2023-07 | 3 | |
| Heinrich Hertz telecommunications satellite launch | 2023-07 | 2 | |
| SARah satellite in operation | 2023 | 11 | |
| Multi-Mission Control Center (MMCC) expansion for satellite operations | 2023 | 2 | |
| Meteosat Third Generation (MTG) satellite platform and infrared sounder instrument mating and testing | 2023 | 2 | |
| 2021 | |||
| PHOEBUS (Prototype of a Highly OptimizEd Black Upper Stage) | 2021 | 27 | |
| 2020 | |||
| Gateway space station | 2020 | 11 | |
| 2019 | |||
| EDRS-C telecommunications satellite | 2019-08 | 28 | |
| EDRS-C | 2019-08 | 27 | |
| Undated | |||
| N3O Atlantic Constellation VHR satellites | planned | 23 | |
| EPS-Sterna weather satellite constellation | planned | 23 | |
| AtLAST radio telescope installation | kommende Dekade | 7 | |
OHB Transactions & Events (44)
44 transactions and events of OHB from the original reports, financing measures and management changes are not listed here, cancelled items in grey. NadirAlpha methodology
Acquisitions by OHB
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| 2027 | |||
| Green Earth Program global rollout | 2027 | Announced | 6 |
| 2026 | |||
| OHB SPACE UK EnVision satellite contract | 2026-05 | Completed | 16 |
| Ramses mission to asteroid Apophis (2x) | 2026-03 | Completed | 11 |
| EPS-Sterna small satellite constellation | 2026-03 | Completed | 13 |
| 2025 | |||
| Production site Schöneck | 2025-09 | Completed | 9 |
| Manufacturing plant acquisition in Schöneck | 2025-09 | Completed | 10 |
| ORACLE lunar payload development | 2025-06 | Completed | 8 |
| LISA mission (Laser Interferometer Space Antenna) | 2025-06 | Completed | 7 |
| Third CO2M satellite contract (2x) | 2025 | Completed | 6 |
| Square Kilometre Array antenna expansion | 2025 | Completed | 12 |
| Ramses asteroid exploration mission awarded to OHB Italia | 2025 | Completed | 12 |
| Production site acquisition for electronic components (2x) | 2025 | Completed | 12 |
| OHB Sweden AB premises relocation (2x) | 2025 | Completed | 12 |
| OHB Sweden AB premises relocation | 2025 | Completed | 11 |
| OHB SPACE UK LTD incorporation (2x) | 2025 | Completed | 6 |
| MT Aerospace AG acquisition (30% stake from Apollo Capital Partners) | 2025 | Completed | 12 |
| MT Aerospace AG (2x) | 2025 | Completed | 10 |
| LISA mission (3x) | 2025 | Completed | 12 |
| GiantEye high-energy computed tomography project | 2025 | Completed | 6 |
| European Moonport Company (3x) | 2025 | Completed | 13 |
| Electronics production site Saxony | 2025 | Completed | 11 |
| CO2M third satellite (2x) | 2025 | Completed | 5 |
| Ariane 6 series production contract (flight models 16-42) | 2025 | Completed | 12 |
| 2024 | |||
| Lunar Descent Element (LDE) Argonaut lander awarded to OHB | 2024 | Completed | 3 |
| KKR minority investor interest acquisition | 2024 | Completed | 4 |
| IRIS2 telecommunications constellation (2x) | 2024 | Completed | 12 |
| IRIDE constellation satellites | 2024 | Completed | 4 |
| IRIDE earth observation constellation (OHB Italia) 12 additional satellites | 2024 | Completed | 3 |
| EnVision Venus mission preliminary agreement | 2024 | Completed | 11 |
| CO2M Earth observation mission (5x) | 2024 | Completed | 12 |
| 2023 | |||
| KKR capital increase | 2023-12 | Completed | 15 |
| Authorized Capital 2020 utilization | 2023-08 | Completed | 4 |
| Rocket Factory Augsburg AG deconsolidation and equity method transition | 2023-02 | Completed | 4 |
| RFA ONE first flight (11x) | 2023 | Completed | 16 |
| KKR investment in Rocket Factory Augsburg AG | 2023 | Completed | 1 |
| 2019 | |||
| SARah reconnaissance satellite system (2x) | 2019-07 | Completed | 2 |
| PHOEBUS upper stage development | 2019-05 | Completed | 28 |
| Lunar Surface Access Service (2x) | 2019-01 | Completed | 27 |
Partnerships and contracts of OHB
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| 2026 | |||
| Joint Venture OHB Rheinmetall Space Networks GmbH | 2026-06 | Agreement | 15 |
| Joint Venture KIRK (Artificial Intelligence and Space Competence) | 2026-06 | Agreement | 15 |
| Dassault Aviation VORTEX-S spacecraft partnership | 2026-06 | Agreement | 16 |
| 2025 | |||
| Axiom Space partnership cooperation | 2025-06 | Agreement | 8 |
| 2023 | |||
| RFA deconsolidation under voting rights agreement | 2023-01 | Agreement | 4 |
| 2018 | |||
| Blue Moon mission letter of intent | 2018 | Agreement | 27 |
OHB Risks (71 since the annual report of 2026-07-30, 135 tracked in total)
Risk factors OHB itself names in its reports, merged by topic across periods, with category, first mention and source; new risks of the latest period come first. NadirAlpha methodology
Category: GeopoliticsMacroRegulatoryFinancialTechnologySupply chainMarketLegalCompetitionPeopleCyber
| Risk | Category | Last reported |
|---|---|---|
| OHB: first mention in IR-Quarter quarterly report of 2026-08-06 (2026-Q2), source 16 | ||
| Start of war of aggression against Iran fuels geopolitical uncertainty globally. | = | |
| Exceptional boom in space industry driven by geopolitical developments and defense budgets. | = | |
| Increased European focus on technological sovereignty driving space industry consolidation. | = | |
| OHB: first mention in IR-Quarter quarterly report of 2026-08-06 (2026-Q2), source 15 | ||
| Heightened geopolitical uncertainties due to the war of aggression in Iran, no direct business dependencies in the affected region | = | |
| OHB: first mention in IR-Quarter quarterly report of 2026-07-30 (2026-Q2), source 6 | ||
| Q1 cash flow from operations negative EUR -100.6 million vs EUR -38.0 million prior year | = | |
| No material changes in opportunity and risk profile reported | = | |
| European space industry regulations and approvals complex | = | |
| OHB: first mention in IR-Quarter quarterly report of 2026-07-30 (2026-Q2), source 22 | ||
| Regelmäßig sehr volatiler Cashflow kennzeichnend für Geschäftsmodell; hinreichend gute Planbarkeit vorhanden | = | |
| Total performance highly dependent on performance milestones and delivery dates; non-linear progression characteristic | = | |
| OHB: first mention in IR-Quarter quarterly report of 2026-07-30 (2026-Q2), source 21 | ||
| Investment control regulatory approvals pending for Orchid takeover bid (2 of 10 countries) | = | |
| Development risks for innovative satellite and launch systems (PLATO, RFA ONE, IRIDE, LEO-PNT) | = | |
| Verfügbarkeit spezialisierter Luft- und Raumfahrtkomponenten | = | |
| Dependence on European ESA programmes and government contracts | = | |
| OHB: first mention in IR-Annual annual report of 2025-04-29 (FY2024), source 3 | ||
| Zyklisches Projektgeschäft erfordert flexible Finanzierungsstrukturen für unregelmäßigen Liquiditätsbedarf | 2026-Q2 2026-08-06 15 | |
| OHB: first mention in IR-Annual annual report of 2024-04-22 (FY2023), source 2 | ||
| Project delivery schedules impact revenue recognition pattern | 2026-Q2 2026-07-30 6 | |
| Dependence on delivery dates and performance milestones in projects for non-linear business progression | 2026-Q2 2026-07-30 5 | |
| OHB: first mention in IR-Half half-year report of 2026-07-30 (2026-H1), source 28 | ||
| OHB's business heavily dependent on performance milestones and delivery dates in respective projects | = | |
| Cash flow regularly very volatile even during course of year but sufficiently predictable | = | |
| Global economic downturn continued in first half of 2019 with negative trend indicators | = | |
| OHB positioned to face international competition in European space industry | = | |
| OHB: first mention in IR-Half half-year report of 2026-07-30 (2026-H1), source 27 | ||
| Regelmäßig sehr volatiler Cashflow kennzeichnend für Geschäftsmodell | = | |
| Total performance highly dependent on performance milestones and delivery dates | = | |
| Globaler Konjunkturabschwung und Brexit-Unsicherheiten beeinflussen Geschäftstätigkeit | = | |
| OHB: first mention in IR-Annual annual report of 2026-07-30 (FY2025), source 12 | ||
| Aerotech Peissenberg associate in restructuring; loan receivables impaired due to financial situation | = | |
| Legal dispute involving associate with court and legal fees covered (EUR 400 thousand) | = | |
| Ongoing lawsuit from 2019 over contractual disagreements; settlement reached in 2024 with expenses paid | = | |
| Inherent development risks liable to cause considerable project delays and costs in space projects | = | |
| Working capital requirements can fluctuate sharply, though prepayments received help reduce liquidity risks | = | |
| Geopolitical tensions driving increased European defense spending | = | |
| Loss of Soyuz launches and Vega-C delays impacted availability | = | |
| Sporadic supply-side risks in sourcing of subsystems, including scheduling and development risks | = | |
| German GDP growth only 0.2% in 2025 after recession | = | |
| Rising public-sector debt in many space-faring nations expected to exert pressure on government budgets | = | |
| ACCESS TO SPACE segment heavily dependent on Ariane program with exposure to price pressure from US competitors | = | |
| SPACE SYSTEMS segment exposed to dependence on budgets of public-sector clients, mainly European Commission and ESA | = | |
| Successful recruiting and retention of employees critical for productivity with focus on career development and training | = | |
| Russian war of aggression and China relations impact programs | = | |
| No material quantified impact disclosed | = | |
| Global minimum tax rules (Pillar 2) applicable; did not cause material burden in 2025 | = | |
| Potential merger of European competitors or suppliers could increase sourcing risks and market competition | = | |
| OHB: first mention in IR-Annual annual report of 2026-03-17 (FY2025), source 11 | ||
| Increased financing risk for commercial customers due to changed capital market conditions | = | |
| Fluktuationsrate überschreitet Zielwert von unter 5% | = | |
| Russischer Angriffskrieg gegen die Ukraine führt zu programmatischen Verschiebungen | = | |
| Risks in the timely delivery of components and subsystems | = | |
| Discontinuation of Soyuz launches from Kourou due to geopolitical tensions | = | |
| Of critical importance is the successful acquisition and retention of employees | = | |
| Risks in the timely and cost-compliant completion of ongoing programs as prime contractor | = | |
| ATP (assoziiert) teilweise Wertminderung von Darlehensforderungen in 2025 | = | |
| Global competition from new providers of launch vehicle systems across various size classes | = | |
| Additional pricing pressure on launch vehicle offerings from US competitors | = | |
| ESA and European programs subject to regulatory and export control requirements | 2026-H1 2026-07-30 28 | |
| The general threat from cyber risks has continued to increase in 2025 | = | |
| Intensified competitive situation in the launch vehicle market due to declining prices | = | |
| Höhere Fremdkapitalbeschaffungskosten ohne Wertminderungen im Konzern | = | |
| Leitzinsen im europäischen Raum führen zu erhöhten Zinsaufwendungen | = | |
| Ongoing global geopolitical tensions and the state of war between Russia and Ukraine | = | |
| Inflationsbedingte gestiegene Gehalts-, Personal-, Material- und Energiekosten | = | |
| Arbeitslosigkeit in Deutschland erhöht sich leicht | = | |
| Wachsende politische und wirtschaftliche Zurückhaltung gegenüber China | = | |
| Space debris and near-Earth object risks require mitigation | FY2025 2026-07-30 12 | |
| OHB: first mention in IR-Annual annual report of 2025-04-29 (FY2024), source 4 | ||
| Syndicated loan includes covenant relating to net leverage ratio and financial ratio net debt to adjusted EBITDA. | FY2025 2026-07-30 12 | |
| Satellite project in 2024 had malfunctions post-orbit; risk transfer only after successful operation | FY2025 2026-07-30 12 | |
| Rising threat posed by cyberattacks on companies with potential for industrial espionage and sabotage affecting corporate know-how | FY2025 2026-07-30 12 | |
| OHB: first mention in IR-Annual annual report of 2025-04-29 (FY2024), source 3 | ||
| Three clients account for more than 10 percent of total revenue respectively. | FY2025 2026-07-30 12 | |
| Klage gegen Konzerngesellschaft seit 2019 über vertragliche Unstimmigkeiten, 2024 eingelenkt | FY2025 2026-03-17 11 | |
| OHB: first mention in IR-Annual annual report of 2024-04-22 (FY2023), source 2 | ||
| Development risks in bid calculation and ongoing project management | FY2025 2026-03-17 11 | |
| Risks associated with late delivery of components and subsystems which could lead to project delays | FY2025 2026-07-30 12 | |
| OHB: first mention in IR-Annual annual report of 2024-04-22 (FY2023), source 1 | ||
| Variable interest rate exposure on EUR 33 million of EUR 55 million borrower's note loan linked to EURIBOR. | FY2025 2026-07-30 12 | |
| Größere Abhängigkeit vom Ariane-Programm im ACCESS TO SPACE Segment | FY2025 2026-03-17 11 | |
| Dependency on budgets of public contracting authorities (EC, ESA, national ministries) | FY2025 2026-03-17 11 | |
| Wars in Ukraine and Iran and geopolitical tensions may have negative impact on results and global supply chain | FY2025 2026-07-30 12 | |
OHB Reported KPIs (as disclosed) (92)
The story KPIs of OHB that standard databases usually miss, grouped by publication, most recent first, with source number. NadirAlpha methodology
| KPI | Value / change | Source |
|---|---|---|
| OHB, published 2026-08-06, period 2026-Q2 | ||
| order backlog | 3,303,843 (EUR in EUR 000) | 16 |
| OHB, published 2026-07-30, period 2026-Q2 | ||
| Return on Capital Employed (ROCE) | 8 % | 6 |
| ROCE | 7 | 24 |
| Order backlog at March 31 | 2,314,191 (EUR in EUR 000) | 6 |
| Equity ratio | 30.7 % | 6 |
| Equity ratio | 30.0 | 24 |
| Equity at March 31 | 432,659 (EUR in EUR 000) | 6 |
| EBIT margin (Total revenues) | 4.8 | 24 |
| EBIT margin | 7.6 | 24 |
| EBIT margin | 2.0 | 24 |
| EBIT margin | 0.8 | 24 |
| EBIT margin | 5.4 | 24 |
| EBIT margin | 4.0 | 24 |
| EBIT margin | 1.6 | 24 |
| OHB, published 2026-07-30, period 2026-H1 | ||
| order backlog prior year | EUR 2,399 million | 28 |
| order backlog | EUR 2,063 million | 28 |
| OHB, published 2026-07-30, period FY2025 | ||
| order backlog | EUR 3,194 million | 12 |
| equity ratio | 27.5 % | 12 |
| average age | 40.5 years | 12 |
| Year-end closing price, Xetra | 116.50 | 12 |
| Price / earnings ratio (year end, Xetra) | 44.64 | 12 |
| Order backlog | 654,746 (EUR in EUR 000) | 12 |
| Market capitalization (year end, Xetra) | 2,239 million | 12 |
| Low for the year, Xetra | 46.53 | 12 |
| High for the year, Xetra | 194.00 | 12 |
| Guarantee obligations | 49,624 | 12 |
| EBITDA margin | 9 % | 12 |
| EBIT margin | 6 % | 12 |
| Dividend yield (year-end, Xetra) | 0.52 % | 12 |
| Dividend per share | 0.601 | 12 |
| Average daily trading volumes (Xetra, Floor, Tradegate) | 8,344 | 12 |
| OHB, published 2026-05-20, period 2026-Q1 | ||
| order backlog | 3,353,646 (EUR in EUR 000) | 14 |
| OHB, published 2026-03-17, period FY2025 | ||
| Average number of employees | 3.589 | 11 |
| Inventories prior year | 34.640 | 11 |
| Inventories | 44.455 | 11 |
| SPACE SYSTEMS average headcount | 2.226 | 11 |
| Employees as of 31 December | 3.779 | 11 |
| Market capitalization (year-end, Xetra) | 2.239 Mio. | 11 |
| Price-earnings ratio | 44,64 | 11 |
| 52-week low, Xetra | 46,53 | 11 |
| Year-end closing price, Xetra | 116,50 | 11 |
| 52-week high, Xetra | 194,00 | 11 |
| Holding employees | 49 | 11 |
| Total output | 1.248 Mio. | 11 |
| Total order backlog | 3.194 | 11 |
| Trade receivables prior year | 72.747 (EUR in TEUR) | 11 |
| Trade receivables | 81.454 (EUR in TEUR) | 11 |
| Equity ratio prior year | 30,5 % | 11 |
| Equity ratio | 27,5 % | 11 |
| EBIT | 73 Mio. | 11 |
| Average age | 40,5 | 11 |
| Average daily revenue | 8.344 | 11 |
| Dividend yield (year-end, Xetra) | 0,52 % | 11 |
| Dividend per share | 0,601 | 11 |
| DIGITAL employees | 663 | 11 |
| Total employees | 3.779 | 11 |
| Employees Germany | 2.977 | 11 |
| Employees abroad | 802 | 11 |
| Adjusted EBITDA | 126 Mio. | 11 |
| Guarantee obligations | TEUR 49.624 | 11 |
| Order backlog SPACE SYSTEMS | 2.508 | 11 |
| Order backlog DIGITAL | 324 | 11 |
| Order backlog ACCESS TO SPACE | 362 | 11 |
| Order backlog | 3.193.585 | 11 |
| ACCESS TO SPACE employees | 651 | 11 |
| OHB, published 2025-11-13, period 2025-Q3 | ||
| ROCE | 3 % | 10 |
| Order backlog | 3,117,057 (EUR in EUR 000) | 10 |
| Equity ratio | 28.2 % | 10 |
| EBIT margin | 5.3 % | 10 |
| OHB, published 2025-08-07, period 2025-Q2 | ||
| R&D expenses | 13.3 million | 8 |
| Order backlog | EUR 3,067 million | 8 |
| Equity ratio | 27.3 % | 8 |
| Equity | 427,709 (EUR in EUR 000) | 8 |
| EBIT margin | 4.0 % | 8 |
| Adjusted EBITDA margin | 8.2 % | 8 |
| OHB, published 2025-04-29, period FY2024 | ||
| Personnel costs | 305,134 (EUR in EUR 000) | 4 |
| Order backlog | 2,382,429 (EUR in EUR 000) | 4 |
| Lease liabilities (non-current) | 26,272 | 4 |
| Lease liabilities (current) | 10,084 | 4 |
| Equity ratio | 30.5 % | 4 |
| Contract liabilities | 332,326 | 4 |
| Contract assets | 632,496 (EUR in EUR 000) | 4 |
| OHB, published 2024-04-22, period FY2023 | ||
| Guarantee obligations | EUR 33,877 thousand | 2 |
| Average headcount | 3,161 | 2 |
| Subscribed capital | EUR 19,214,905.00 | 2 |
| Price/earnings ratio (year-end, Xetra) | 10.32 | 2 |
| Market capitalization (year end, Xetra) | 815 million | 2 |
| Equity ratio | 32.7% | 2 |
| Equity | 438,022 (EUR in EUR 000) | 2 |
| Dividend yield (year-end, Xetra) | 1.90 % | 2 |
| Contract assets | 554,106 (EUR in EUR 000) | 2 |
| Average daily trading volumes (Xetra, Floor, Tradegate) | 11,645 | 2 |
OHB Development
A condensed summary of OHB per reporting period as running text: what changed operationally, which drivers management names, how earnings and cash flow developed. NadirAlpha methodology
FY2026: OHB
OHB generated revenue of 270.9 million in Q1 2026 and 329.2 million in Q2 2026, with H1 total operating performance reaching EUR 627.9 million against EUR 563.5 million a year earlier 16. Q1 delivered operating income of 15.2 million 117, while Q2 operating income turned marginally negative at -0.3 million and net income amounted to a loss of 5.1 million 119. A capital increase completed during H1 raised EUR 484 million gross proceeds in two tranches 15, converting a net debt position of 183 million at end of Q1 into a net cash position of 187.4 million by end of Q2 119. The order backlog expanded to EUR 3,353.6 million by end of March 2026 from EUR 2,314.2 million a year earlier 13, supported by major new awards including OHB Sweden's largest-ever contract for the EPS-Sterna microsatellite constellation and a EUR 175.5 million contract for a third Copernicus CO2M satellite 5.
FY2025: OHB
OHB generated revenue of EUR 1,215.5 million in FY2025, a 21% increase from EUR 1,001.5 million in 2024, while total operating performance of EUR 1,247.6 million exceeded the company's own forecast of around EUR 1,200 million 11 12. EBIT reached EUR 73.3 million compared with EUR 14.1 million in the prior year, and net profit turned to EUR 50 million from EUR -0.2 million, with diluted earnings per share rising to 2.61 from EUR -0.01 11 12. The EBITDA margin improved to 9.2% and the EBIT margin to 5.9%, compared with 5.2% and 1.4% respectively in 2024 12. Cash and cash equivalents rose to EUR 220.6 million from EUR 118.0 million, with year-end net debt at EUR 59.6 million 11 12. The order backlog climbed to EUR 3,194 million from EUR 2,382 million, supported by the EUR 839 million LISA gravitational-wave observatory contract for which OHB System AG serves as prime contractor 11 12.
FY2024: OHB
OHB SE reported full-year 2024 revenue of 1,001.5 million, down from EUR 1,047.8 million in 2023, while total performance declined 13% to EUR 1,030.2 million due to late order intake shifts and project milestone delays 3. EBIT reached 14.1 million versus EUR 125.0 million in 2023, burdened by a EUR 37.5 million satellite project disruption provision and EUR 15.4 million in transformation costs; adjusted EBITDA improved to EUR 111.1 million from EUR 87.1 million after excluding these special items 3 4. Net income attributable to OHB SE shareholders turned negative at EUR -196 thousand compared with EUR 71.3 million in 2023 4. Order intake rose to approximately EUR 1.7 billion, representing an over 80% year-on-year increase, lifting the order backlog to EUR 2,382 million from EUR 1,749 million; strategic highlights included the Ariane 6 maiden flight in July 2024, OHB's selection as prime contractor for the LEO-PNT in-orbit demonstration mission, and KKR completing a minority stake acquisition 3 4.
FY2023: OHB
OHB SE reported full-year 2023 revenue of 1,047.8 million, exceeding the company's guidance of EUR 1,176 million and higher than the prior-year level of EUR 944.5 million 2. EBIT rose by EUR 62 million to 125 million, surpassing guidance of EUR 70 million, while EBITDA rose by EUR 63 million to EUR 162 million against guidance of EUR 109 million 1. Consolidated net income reached 71.3 million, up from EUR 32.2 million in the prior year 2. Key operational milestones included the successful launch of the Heinrich-Hertz telecommunications satellite in July 2023 and the SARah reconnaissance satellite constellation in December 2023 1, alongside completion of a strategic partnership with KKR in December 2023 involving a 10% capital increase 2. Year-end cash stood at 141.1 million, partly reflecting a EUR 74 million inflow from the new share capital issue, while free cash flow was -66.1 million 2.
Glossary
- Revenue: Revenue from contracts with customers, net of sales deductions, as the company itself reports it; not total output, gross revenue, GMV or order intake.
- Op. income: The operating line of the income statement; EBIT only as a marked fallback, never pre-tax or ordinary income.
- EBITDA (adj.): Adjusted EBITDA, verbatim and company-defined (non-GAAP), never derived.
- Net income: Net income attributable to the shareholders of the parent, after discontinued operations; not the result including minority interests, not comprehensive income.
- EPS: Diluted earnings per share attributable to the shareholders of the parent; a printed figure always beats a calculated one, calculated values are marked.
- FCF: Free cash flow = operating cash flow minus capital expenditure on property, plant and equipment; the company's own free cash flow figure is shown separately.
- OCF: Cash flow from operating activities as reported; IFRS companies may show interest paid in financing cash flow, so the figure is not always comparable.
- Cash: Cash and cash equivalents, without securities unless the company reports them as part of the position.
- Net Debt: Net debt = financial debt excluding lease liabilities minus cash at the same reporting date; the company's own net position may differ.
- *: derived, the formula is in the hover
- ≈: calculated, approximation
- ~: uncertain; the value stays visible, verdicts do not use it
- °: repaired by a targeted query against the document, or curated with documentary evidence
- EBIT: EBIT as a fallback: the income statement carries no operating line
- basic: basic earnings per share as a fallback when diluted is missing
Sources: quarterly reports, annual reports and investor relations documents
28 sources on OHB since 2023; the superscript numbers in the chapters refer to these rows, older documents are in the expandable part. NadirAlpha methodology
Older sources (+2)
| # | Document type | Published |
|---|---|---|
| #25 | IR-Report report | 2001-03-31 |
| #26 | IR-Report report | 2001-09-30 |
OHB Stock FAQ
Is there a management forecast (guidance) for FY2026?
Yes. Management has issued targets for FY2026, including Revenue. The guidance tracking chapter shows all targets and checks them against the actuals reported later; neutral, with no estimate of our own.
Which additional key figures does OHB report?
As reported for Q2 2026: Equity ratio, ROCE, Return on Capital Employed (ROCE), Order backlog at March 31, Equity at March 31, EBIT margin (Total revenues). The chapter Reported KPIs lists every value with its source. Revenue is broken down by Holding, Science and Environmental and Weather Satellites, Rail Infrastructure, Professional Services and Other.
Does OHB pay a dividend?
The filings report on the dividend; most recent entry: dividend per share 0.601 (FY2025) (as reported, no assessment of our own). Details with source links are in the report chapters.
Where can I find the official investor relations documents of OHB?
NadirAlpha links all 28 original filings used (IR documents) in the sources chapter: quarterly report, annual report, report, each with type, publication date and a direct link; every figure in the report carries a source number.