OHB SE OHB.DE
Quarterly and annual results for OHB stock (OHB.DE) since 2023: revenue, earnings, balance sheet, cash flow and management guidance from IR documents, every figure with its source. As of 08/2026, quarterly reporting. Latest reading: Revenue decelerating, Order intake, Margin expanding, New market, Net debt to net cash.
Published by Michael Wirl · About us · Methodology
AI-generated report · not investment advice · figures extracted automatically; please verify against the linked original more
Business Model#
What the company does and how it earns its money; written AI-editorially, exclusively from the company's original reports, without any assessment of our own.
OHB SE is a German space technology group that designs, manufactures, and integrates satellites and space systems for civil, scientific, and defense applications. The company earns revenue primarily through long-term contracts with institutional customers -- including the European Space Agency, the European Commission, and national defense ministries -- covering satellite prime contracting, launch vehicle structural components, and ground segment services. Revenue is recognized on a percentage-of-completion basis as program milestones are achieved, producing multi-year revenue visibility alongside capital-intensive working-capital profiles. The group operates across three principal areas: satellite systems (civil and scientific missions as prime contractor), ACCESS TO SPACE (launch vehicle structural components manufactured by MT Aerospace, principally for Ariane 6), and digital and defense services including military communications infrastructure and data services. Subsidiaries extend capabilities into communications subsystems (Antwerp Space), maritime data and satellite services (LuxSpace), and micro-launcher development (RFA). Defense, security, and dual-use space applications have grown in strategic importance, with increasing emphasis on military satellite communications, space-based surveillance systems, and AI-assisted satellite manufacturing industrialization. The group has pursued accelerating joint-venture activity to address defense and institutional space programs in Europe, including tactical surveillance, military satellite communications, and multipurpose spacecraft development.
Current Status#
Summary of the most recent reporting period: core figures, drivers and management statements; written editorially from the current original report, every figure backed by a source number.
Price & Chart#
Interactive price chart (TradingView) and the trend of key figures from the core tables. The price chart loads only after a click; at that point a connection to TradingView is established.
Daily candles with news and earnings markers. Loads only on click.
Share-Price Drivers#
Factors the company itself names as material for its business development (IR-based); reproduced neutrally, no price forecast and no assessment of our own.
SPACE SYSTEMS remains the largest revenue contributor at 203.3 (3M) and group revenue rose to 329.2 in 2026-Q2, with growth flagged as accelerating 14 15 119
Revenue reached 329.2 in 2026-Q2 versus 307.7 a year earlier, extending sequential gains from 270.9 119 117
Newly reported ACCESS TO SPACE segment contributed 43.8 (3M); Ariane 6 reached its initial launch and further Ariane 6 launches are planned for mid-2026 14 12 11
IRIS2 sovereign constellation programme is in the planned pipeline alongside SATCOMBw3 and LEO-PNT sovereign/defence-linked work 12 11
Operating income was -0.3 and the group posted a net result of -5.1 in 2026-Q2, against positive 15.2 in 2026-Q1 119 117
Cash rose to 526.9 with a net cash position of 187.4, supported by a credit facility restructuring of EUR 350 million and a LISA mission contract 119 12
Operating cash flow was -82 and free cash flow -91.8 in 2026-Q2, reflecting continued programme funding outflows 119
MTG-S1 and SkyBee-1 satellites were launched and Hera and Eaglet-2 milestones were reached, indicating active delivery on booked missions 12 11
Sector trend: Space-sector demand is trending higher, driven by European sovereign telecommunications and security programmes (IRIS2, SATCOMBw3) and a rising launch cadence around Ariane 6, while near-term profitability and cash flow remain pressured by upfront programme funding 12 11 119.
Event Timeline#
This timeline collects the material events from the original reports: guidance changes, revenue and margin signals, strategy shifts, product and M&A announcements. Events are grouped by quarter (most recent first); the grey tag before each event names the event type, the date is the publication date of the source. Management quotes open the quarter block as direct quotes. Per quarter we show the three most defining events; more can be expanded per quarter, older years are collapsed. Every event carries its source as a superscript, clickable number.
2026 · 8 events
2026-Q2 · Apr – Jun 2026
H1 2026 adjusted EBITDA margin reached 9.6% 16, with adjusted EBIT margin also higher than prior-year period 15
Capital increase of EUR 484 million gross proceeds in two tranches 15 moved the net position from net debt at end-Q1 to net cash of 187.4 million at end-Q2
KIRK joint venture formed with Helsing, Hensoldt and Kongsberg Defence & Aerospace for a space-based tactical surveillance system 15
Order intake / order book: order backlog EUR 3,303,843.0m; order intake EUR 3.3m 15
2026-Q1 · Jan – Mar 2026
OHB Sweden AB secured the largest order in its corporate history for the EPS-Sterna microsatellite constellation; group order backlog rose to EUR 3,353.6 million from EUR 2,314.2 million 13
2025 · 15 events
FY2025 · Jan – Dec 2025
Operating income more than doubled YoY (14.1 to 73.3 EURm, +420%). 114
2025-Q4 · Oct – Dec 2025
Full-year net profit reached 50 million EUR, reversing EUR 0.2 million net loss in 2024; EPS 2.61 vs EUR -0.01 prior year 12
EBITDA margin improved to 9.2% from 5.2%; EBIT margin increased to 5.9% from 1.4% 12
ESA Ministerial Conference approved record EUR 22.3 billion programs for next funding cycle; DIGITAL segment reached record order intake exceeding EUR 250 million 12
Operating cash flow turned positive on a half-year basis (2025-H1: -107.6 to 2025-H2: +146.0 EURm, aggregated from reported quarters where needed). 115
2025-Q3 · Jul – Sep 2025
9M consolidated total revenues increased to EUR 863.5 million from EUR 715.8 million in the prior-year period 10
OHB SE acquired additional 30% stake in MT Aerospace AG from Apollo Capital Partners GmbH, becoming sole shareholder 10
German Federal Government announced EUR 35 billion investment in security-related space infrastructure through 2030 10
2025-Q2 · Apr – Jun 2025
6M total revenues increased to EUR 563.5 million from EUR 470.5 million in the prior-year period 8
OHB System AG awarded EUR 839 million LISA mission contract as prime contractor, described as ESA's largest and most complex scientific mission 7
Operating income more than doubled YoY (5.6 to 14.5 EURm, +159%). 119
2025-Q1 · Jan – Mar 2025
OHB System AG awarded EUR 175.5 million contract for third Copernicus CO2M satellite for climate monitoring 5
Rocket Factory Augsburg AG received first European spacecraft operator license for vertical launch from UK Civil Aviation Authority 5
2024 · 14 events
FY2024 · Jan – Dec 2024
Free cash flow turned positive for the first time after 1 negative fiscal year (-66.1 to +158.4 EURm). 114
Operating income more than halved YoY (125.0 to 14.1 EURm, -89%). 114
2024-Q4 · Oct – Dec 2024
Operating cash flow turned positive on a half-year basis (2024-H1: -83.3 to 2024-H2: +243.0 EURm, aggregated from reported quarters where needed). 115
Net income attributable to shareholders turned negative at EUR -196 thousand (2023: EUR 71.3 million), driven by EUR 37.5 million project disruption provision and EUR 15.4 million in transformation costs 4
Q4 EBIT turned negative at -20.6 million; EUR 37.5 million satellite project disruption provision recognized for possible rebuild obligation 3
Revenue fell to 1,001.5 million from EUR 1,047.8 million; total performance down 13% to EUR 1,030.2 million due to late order intake shifts and project milestone delays 3
Order intake rose to approximately EUR 1.7 billion, an over 80% year-on-year increase, lifting backlog to EUR 2,382 million from EUR 1,749 million 4
Hera space probe launched successfully on October 7, 2024 to study effects of asteroid deflection 4
Vega-C resumed flight operations in December 2024 following earlier grounding 3
2024-Q3 · Jul – Sep 2024
Voluntary public takeover bid by KKR successfully completed in September 2024; KKR holds approximately 28.6% of OHB SE shares 4
RFA ONE experienced first stage fire during August 2024 S1 stage test, delaying maiden flight timeline 4
Ariane 6 launcher completed maiden flight on July 9, 2024, restoring Europe's autonomous access to space 4
2024-Q2 · Apr – Jun 2024
EBIT reached 125 million, exceeding guidance of EUR 70 million; EBITDA reached EUR 162 million against guidance of EUR 109 million 1 2
Revenue reached 1,047.8 million, exceeding guidance of EUR 1,176 million and above the prior-year level of EUR 944.5 million 2
2023 · 1 events
2023-Q4 · Oct – Dec 2023
Strategic partnership with KKR completed in December 2023: 10% capital increase in OHB SE and EUR 30 million investment in Rocket Factory Augsburg; Fuchs family retained approximately 65.35% of shares post-transaction 2
Key Figures (€m)#
The company's core financial figures in three views, one below the other: fiscal years (as reported; after restatements the table shows the most recent filing version, marked), half-years (6-month basis, H2 = second half on its own) and quarters (3-month basis, not cumulative). Each row is one period, most recent first. Values with a dotted underline are clickable and show the raw value, the exact source location, the scale evidence and the source; derived values additionally show their formula and inputs. All values are extracted automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original.
All figures serve only to support your own investment decision and are not a recommendation; the company's original reports are authoritative.
Fiscal years
| Period | Revenue | Op. income | Net income | EPS (€) | EBITDA (adj.) | OCF | Source |
|---|---|---|---|---|---|---|---|
| FY2025 | 1,215.5 | 73.3EBIT | 50 | 2.61 | 125.6 | 38.5 | 114 |
| FY2024 | 1,001.5 | 14.1EBIT | -0.2~ | -0.01 | 111.1 | 159.8 | 3 |
| FY2023 | 1,047.8 | 125EBIT | 71.3~ | 4.10 | 87.1 | -61.8 | 115 |
Quarters
| Period | Published | Revenue | Op. income | Net income | EPS (€) | EBITDA (adj.) | FCF | Cash | Net Debt | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| 2026-Q2* | 2026-08-06 | 329.2 | -0.3EBIT | -5.1 | -0.27 | 33 | -91.8 | 526.9 | -187.4~ | 119 |
| 2026-Q1* | 2026-06-30 | 270.9 | 15.2EBIT | 9.9 | 0.52 | 27.3 | -120 | 54.3 | 199.7 | 117 |
| 2025-Q4* | 2025-12-31 | 394.7 | 27.8 | 26.4 | 1.38*≈ | 44.6 | – | 220.6 | 59.6 | 115 |
| 2025-Q3* | 2025-11-13 | 283.9 | 23.4EBIT | 12.4 | 0.65 | 35 | -24 | 53.4 | 210.3 | 113 |
| 2025-Q2* | 2025-08-07 | 307.7 | 14.5EBIT | 7.1 | 0.37~ | 25.9 | -11.9 | 52.8 | 183 | 7 |
| 2025-Q1* | 2025-06-30 | 229.3 | 9.5EBIT | 3.7 | 0.26~ | 20 | -107.1 | 45.9 | 183.2 | 117 |
| 2024-Q4* | 2025-11-13 | 519.3 | -20.6 | -17.6 | -0.90*≈ | 38.6 | – | 118 | 41 | 115 |
| 2024-Q3 | 2025-11-13 | 233.1 | 18.9EBIT | 12 | 0.63 | 31.8 | – | – | 180.6~ | 113 |
| 2024-Q2 | 2025-08-07 | 255.2 | 5.6EBIT | 0.6 | 0.03 | 21.4 | – | – | 152.1 | 111 |
| 2024-Q1* | 2025-06-30 | -6.1~ | 10.2EBIT | 4.8 | 0.25 | 20 | -42.4 | 23.7 | 194.8 | 109 |
| 2023-Q1* | 2025-06-30 | 197.2 | 12.5EBIT | 7.1 | 0.41≈ | – | – | – | 169.4 | 117 |
Balance Sheet & Cash Flow (€m)#
Point-in-time balance sheet items (e.g. cash, financial debt) and cash flow items (operating cash flow, investments/capex) per fiscal year, half-year and quarter. Balance sheet values are as of the period end, flow items cover the period. Derived values are marked and are calculated, for example, as: net debt = financial debt − cash; free cash flow = operating cash flow − capex; the click popover shows formula and inputs. All values are extracted automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original.
Fiscal years
| Period | Published | Cash | Debt | Net Debt | OCF | Capex | FCF | Source |
|---|---|---|---|---|---|---|---|---|
| FY2025 | 2025-12-31 | 220.6 | 280.2 | 59.6 | 38.5 | – | – | 114 |
| FY2024 | 2025-04-29 | 118 | 159.1 | 41 | 159.8 | 1.3 | 158.4 | 3 |
| FY2023 | 2024-04-22 | 141.1 | 288.3 | 147.2 | -61.8 | 4.3 | -66.1 | 115 |
Quarters
| Period | Published | Cash | Debt | Net Debt | OCF | Capex | FCF | Source |
|---|---|---|---|---|---|---|---|---|
| 2026-Q2 | 2026-08-06 | 526.9 | 339.6 | -187.4~ | -82 | 9.8 | -91.8 | 119 |
| 2026-Q1 | 2026-06-30 | 54.3 | 254 | 199.7 | -112.5 | 7.5 | -120 | 117 |
| 2025-Q4 | 2025-12-31 | 220.6 | 280.2 | 59.6 | 166.2 | – | – | 115 |
| 2025-Q3 | 2025-11-13 | 53.4 | 287 | 210.3 | -20.2 | 3.8 | -24 | 113 |
| 2025-Q2 | 2025-08-07 | 52.8 | 257.5 | 183 | -7 | 4.9 | -11.9 | 7 |
| 2025-Q1 | 2025-06-30 | 45.9 | 229.1 | 183.2 | -100.6 | 6.6 | -107.1 | 117 |
| 2024-Q4 | 2025-11-13 | 118 | 159.1 | 41 | 207.5 | – | – | 115 |
| 2024-Q3 | 2025-11-13 | – | 309.4 | 180.6~ | 35.5 | – | – | 113 |
| 2024-Q2 | 2025-08-07 | – | – | 152.1 | -45.3 | – | – | 111 |
| 2024-Q1 | 2025-06-30 | 23.7 | 271.4 | 194.8 | -38 | 4.4 | -42.4 | 109 |
| 2023-Q4 | 2025-04-29 | 141.1 | 288.3 | 147.2 | – | – | – | 107 |
| 2023-Q1 | 2025-06-30 | – | – | 169.4 | -58.5 | – | – | 117 |
Revenue by Type (as of 2026-Q2 · EURm · 14/24)#
Revenue split by segment or product type, exactly as the company itself reports it. The basis is stated next to each value (3, 6 or 12 months); segment totals can deviate from group revenue (reconciliation/consolidation items). If the company changes its segment structure, older structures are kept in the expandable part. Rows in grey are no longer reported separately by the company; they show the last available figures and are never extrapolated.
| Segment | Since | Period | Basis | Revenue | Margin | Source |
|---|---|---|---|---|---|---|
| Holding | 2026-Q2 | 2026-Q2 | 6M | 458.7 | – | 15 |
| Science and Environmental and Weather Satellites | FY2025 | FY2025 | 12M | 242.6 | – | 11 |
| Tanks and Structures, Special Manufacturing Processes and Hydrogen Technologies, Launcher Components | FY2025 | FY2025 | 12M | 139.8 | – | 11 |
| Satellite Data Analytics, Applications and Satellite Operations, Ground Systems | FY2025 | FY2025 | 12M | 74.9 | – | 11 |
| Rail Infrastructure | FY2025 | FY2025 | 12M | 23.2 | – | 11 |
| Professional Services and Other | FY2025 | FY2025 | 12M | 15 | – | 11 |
| Telescopes, Cybersecurity and Encryption | FY2025 | FY2025 | 12M | 10.3 | – | 11 |
| ACCESS TO SPACE | 2025-Q1 | 2026-Q1 | 3M | 43.8 | – | 14 |
| Telecommunications and Navigation Satellites | FY2023 | FY2025 | 12M | 314 | – | 11 |
| Exploration and Other | FY2023 | FY2025 | 12M | 264.5 | – | 11 |
| SPACE SYSTEMS | FY2023 | 2026-Q1 | 3M | 203.3 | – | 14 |
| Reconnaissance and Space Security | FY2023 | FY2025 | 12M | 131.2 | – | 11 |
| AEROSPACE | FY2023 | 2025-Q1 | 3M | 32.9 | 4.7% | 6 |
| DIGITAL | FY2023 | 2026-Q1 | 3M | 30.5 | – | 14 |
| Telecommunications and Navigation Satellites | FY2023 | FY2024 | 12M | 256.2 | – | 4 |
| Science and Exploration (and Other) | FY2023 | FY2024 | 12M | 251.3 | – | 4 |
| Environmental and Weather Satellites | FY2023 | FY2023 | 12M | 250.4 | – | 1 |
| Reconnaissance and Space Security | FY2023 | FY2024 | 12M | 160.4 | – | 4 |
| Environmental and Weather Satellites | FY2023 | FY2024 | 12M | 150 | – | 4 |
| Tanks and Structures, Special Manufacturing Processes and Launcher Components | FY2023 | FY2023 | 12M | 122.9 | – | 2 |
| Satellite Data Analytics, Applications and Satellite Operations | FY2023 | FY2023 | 12M | 73.9 | – | 2 |
| Ground systems (and miscellaneous) | FY2023 | FY2023 | 12M | 32.4 | – | 2 |
| Telescopes, cybersecurity and encryption | FY2023 | FY2023 | 12M | 12.6 | – | 2 |
| Railroad infrastructure, hydrogen technologies (and miscellaneous) | FY2023 | FY2023 | 12M | 7.9 | – | 2 |
Products & M&A (51/75 active+recent)#
Product announcements from the reports; market launches, approvals, partnerships; with first mention (date) and source. “Active/current” means: still mentioned in the most recent reports; what the company no longer mentions moves to the expandable part but is never deleted. Rows in grey are discontinued products.
| Product/Line | Since | Status | Source |
|---|---|---|---|
| Vigil space weather mission launch | 2031 | Launched | 16 |
| ExoMars Rover mit MT Aerospace Tanks | 2028-03 | Launched | 7 |
| RAMSES probe launch | 2028 | Launched | 15 |
| RAMSES probe launch | 2028 | Launched | 16 |
| ORACLE lunar payload (oxygen extraction) | 2028 | Launched | 7 |
| ExoMars Rosalind Franklin rover launch | 2028 | Launched | 8 |
| PLATO space telescope environmental testing | 2027-01 | Launched | 16 |
| PLATO (Space probe) | 2026-12 | Launched | 10 |
| RAMSES spacecraft integration start | 2026-06 | Launched | 15 |
| Joint Venture OHB Rheinmetall Space Networks GmbH | 2026-06 | Launched | 15 |
| Joint Venture KIRK (Artificial Intelligence and Space Competence) | 2026-06 | Launched | 15 |
| OHB SPACE UK EnVision mission contract | 2026-05 | Launched | 15 |
| Eaglet-2 satellites (2x) | 2026-03 | Launched | 11 |
| EPS-Sterna microsatellite constellation | 2026-03 | Launched | 14 |
| Ariane 6 maiden flight with four boosters | 2026-02 | Launched | 14 |
| Ariane 6 maiden flight with four boosters | 2026-02 | Launched | 13 |
| Two further Ariane 6 launches | 2026 | Launched | 11 |
| PLATO mission (4x) | 2026 | Launched | 15 |
| OHB Czechspace SOVA-S mission (2x) | 2026 | Launched | 16 |
| Flyeye telescope conversion | 2026 | Launched | 7 |
| Flyeye telescope installation at Mount Mufara | 2026 | Launched | 8 |
| Ariane 6 launches scheduled | 2026 | Planned | 12 |
| Ariane 6 programme ramp-up | 2026 | Launched | 11 |
| Galileo satellites | 2025-12 | Launched | 11 |
| IRIDE Constellation (First batch) | 2025-11 | Launched | 10 |
| QUBE small satellite operational | 2025-09 | Launched | 10 |
| OHB Digital Connect Darmstadt facility opening | 2025-09 | Launched | 10 |
| MTG-S1 satellite (3x) | 2025-07 | Launched | 11 |
| constellr payload launch into orbit | 2025-03 | Launched | 3 |
| Sardinia Radio Telescope Upgrade | 2025-03 | Launched | 5 |
| GARAI-B satellite (2x) | 2025-03 | Launched | 7 |
| Ariane 6 second commercial flight | 2025-03 | Launched | 6 |
| Ariane 6 commercial launch | 2025-03 | Launched | 11 |
| constellr GmbH microsatellite SkyBee-1 | 2025-01 | Launched | 11 |
| SkyBee-1 satellite payload launch | 2025-01 | Launched | 12 |
| constellr GmbH constellation of microsatellites | 2025 | Launched | 12 |
| constellr GmbH constellation | 2025 | Launched | 3 |
| Themis reusable rocket stage | 2025 | Planned | 7 |
| SATCOMBw3 mission implementation | 2025 | Launched | 12 |
| RFA ONE first flight expected | 2025 | Launched | 3 |
| NAOS satellite launch (7x) | 2025 | Launched | 8 |
| MTG-S1 satellite launch (3x) | 2025 | Launched | 12 |
| Luxembourg reconnaissance satellite launch planned | 2025 | Planned | 3 |
| IRIS2 satellite constellation programme | 2025 | Launched | 11 |
| Genesis mission | 2025 | Launched | 12 |
| Galileo navigation constellation expansion | 2025 | Launched | 4 |
| EOTideLine product launch (2×) | 2025 | Launched | 6 |
| EAGLET II satellite launch (2×) | 2025 | Launched | 14 |
| Argonaut lander lunar mission | 2025 | Launched | 11 |
| Meteosat Third Generation (MTG) satellites (2×) | 2024 | Launched | 3 |
| LEO-PNT mission (2×) | 2024 | Launched | 12 |
| Mission Ramses (4x) | 2026-03 | Launched | 3 |
| Vega-C launch vehicle | 2024-12 | Launched | 4 |
| Vega-C flight operations resumption | 2024-12 | Launched | 3 |
| Hera mission (3×) | 2024-10 | Launched | 11 |
| Hera asteroid probe | 2024-10 | Launched | 4 |
| VIGIL mission (B2/C/D definition study) | 2024-09 | Launched | 3 |
| Ariane 6 launcher | 2024-07 | Launched | 4 |
| Ariane 6 initial launch | 2024-07 | Launched | 3 |
| Ariane 6 launch vehicle (2×) | 2024-06 | Launched | 3 |
| Ariane 6 initial launch | 2024-06 | Launched | 12 |
| QUBE (research satellite) | 2024 | Launched | 9 |
| MTG Sounder satellite successfully tested | 2024 | Launched | 3 |
| Galileo satellite launches (two satellites April, two satellites September) | 2024 | Launched | 3 |
| Arctic Weather Satellite (6×) | 2024 | Launched | 4 |
| Vega-C resumption of flight operations | 2023-12 | Launched | 2 |
| SARah reconnaissance satellite constellation | 2023-12 | Launched | 1 |
| SARah reconnaissance satellites launch | 2023-12 | Launched | 2 |
| Heinrich-Hertz mission (3x) | 2023-07 | Launched | 3 |
| Heinrich Hertz telecommunications satellite launch | 2023-07 | Launched | 2 |
| SARah satellite in operation | 2023 | Launched | 11 |
| Multi-Mission Control Center (MMCC) expansion for satellite operations | 2023 | Launched | 2 |
| Meteosat Third Generation (MTG) satellite platform and infrared sounder instrument mating and testing | 2023 | Launched | 2 |
| Gateway space station | 2020 | Launched | 11 |
| AtLAST radio telescope installation | kommende Dekade | Launched | 7 |
M&A (41)#
All recorded acquisitions (purchases) and divestitures/exits with date, short description and source; deliberately including smaller transactions that summaries often miss. Purchase prices appear only where the company itself has disclosed them. Rows in grey are cancelled transactions; the cancellation date is shown in the row.
Acquisitions
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| Green Earth Program global rollout | 2027 | Completed | 6 |
| Dassault Aviation VORTEX-S spacecraft partnership | 2026-06 | Completed | 16 |
| Capital increase EUR 484 million | 2026-06 | Completed | 16 |
| OHB SPACE UK EnVision satellite contract | 2026-05 | Completed | 16 |
| Ramses mission to asteroid Apophis (2x) | 2026-03 | Completed | 11 |
| EPS-Sterna small satellite constellation | 2026-03 | Completed | 13 |
| Production site Schöneck | 2025-09 | Completed | 9 |
| Manufacturing plant acquisition in Schöneck | 2025-09 | Completed | 10 |
| ORACLE lunar payload development | 2025-06 | Completed | 8 |
| LISA mission (Laser Interferometer Space Antenna) | 2025-06 | Completed | 7 |
| Axiom Space partnership cooperation | 2025-06 | Completed | 8 |
| Third CO2M satellite contract (2x) | 2025 | Completed | 6 |
| Square Kilometre Array antenna expansion | 2025 | Completed | 12 |
| Ramses asteroid exploration mission awarded to OHB Italia | 2025 | Completed | 12 |
| Production site acquisition for electronic components (2x) | 2025 | Completed | 12 |
| OHB Sweden AB premises relocation (2x) | 2025 | Completed | 12 |
| OHB Sweden AB premises relocation | 2025 | Completed | 11 |
| OHB SPACE UK LTD incorporation (2x) | 2025 | Completed | 12 |
| MT Aerospace AG acquisition (30% stake from Apollo Capital Partners) | 2025 | Completed | 12 |
| MT Aerospace AG (2x) | 2025 | Completed | 10 |
| LISA mission (3x) | 2025 | Completed | 12 |
| GiantEye high-energy computed tomography project | 2025 | Completed | 6 |
| European Moonport Company (3x) | 2025 | Completed | 13 |
| Electronics production site Saxony | 2025 | Completed | 11 |
| CO2M third satellite (2x) | 2025 | Completed | 5 |
| Ariane 6 series production contract (flight models 16-42) | 2025 | Completed | 12 |
| Lunar Descent Element (LDE) Argonaut lander awarded to OHB | 2024 | Completed | 3 |
| KKR minority investor interest acquisition | 2024 | Completed | 4 |
| IRIS2 telecommunications constellation (2x) | 2024 | Completed | 12 |
| IRIDE constellation satellites | 2024 | Completed | 4 |
| IRIDE earth observation constellation (OHB Italia) 12 additional satellites | 2024 | Completed | 3 |
| EnVision Venus mission preliminary agreement | 2024 | Completed | 11 |
| CO2M Earth observation mission | 2024 | Completed | 12 |
| KKR capital increase | 2023-12 | Completed | 15 |
| KKR partnership agreement with 10% capital increase | 2023-08 | Announced | 2 |
| Authorized Capital 2020 utilization | 2023-08 | Completed | 4 |
| Rocket Factory Augsburg AG deconsolidation and equity method transition | 2023-02 | Completed | 4 |
| RFA ONE maiden flight | 2023 | Completed | 16 |
| KKR investment in Rocket Factory Augsburg AG | 2023 | Completed | 1 |
Divestitures / exits
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| Rocket Factory Augsburg AG - deconsolidation | 2023-01 | Divested | 1 |
| RFA deconsolidation under voting rights agreement | 2023-01 | Divested | 4 |
Reported KPIs (as disclosed) (81)#
Figures the company discloses itself in addition to the standard financials; order intake, recurring revenue, user or unit counts, adjusted measures. These “story KPIs” usually slip through standard databases; here they are collected as reported, with no calculation of our own. Important: the definition comes from the company itself and can differ from firm to firm; period and source are stated next to every value.
| Date | Period | KPI | Value / change | Source |
|---|---|---|---|---|
| 2026-08-06 | 2026-Q2 | order backlog | 3,303,843 (EUR in EUR 000) | 16 |
| 2026-05-07 | 2026-Q1 | order backlog | 3,353,646 (EUR in EUR 000) | 14 |
| 2026-03-18 | FY2025 | order backlog | EUR 3,194 million | 12 |
| 2026-03-18 | FY2025 | equity ratio | 27.5 % | 12 |
| 2026-03-18 | FY2025 | average age | 40.5 years | 12 |
| 2026-03-18 | FY2025 | Year-end closing price, Xetra | 116.50 | 12 |
| 2026-03-18 | FY2025 | Price / earnings ratio (year end, Xetra) | 44.64 | 12 |
| 2026-03-18 | FY2025 | Order backlog | 654,746 (EUR in EUR 000) | 12 |
| 2026-03-18 | FY2025 | Market capitalization (year end, Xetra) | 2,239 million | 12 |
| 2026-03-18 | FY2025 | Low for the year, Xetra | 46.53 | 12 |
| 2026-03-18 | FY2025 | High for the year, Xetra | 194.00 | 12 |
| 2026-03-18 | FY2025 | Guarantee obligations | 49,624 | 12 |
| 2026-03-18 | FY2025 | EBITDA margin | 9 % | 12 |
| 2026-03-18 | FY2025 | EBIT margin | 6 % | 12 |
| 2026-03-18 | FY2025 | Dividend yield (year-end, Xetra) | 0.52 % | 12 |
| 2026-03-18 | FY2025 | Dividend per share | 0.601 | 12 |
| 2026-03-18 | FY2025 | Average daily trading volumes (Xetra, Floor, Tradegate) | 8,344 | 12 |
| 2026-03-17 | FY2025 | Average number of employees | 3.589 | 11 |
| 2026-03-17 | FY2025 | Inventories prior year | 34.640 | 11 |
| 2026-03-17 | FY2025 | Inventories | 44.455 | 11 |
| 2026-03-17 | FY2025 | SPACE SYSTEMS average headcount | 2.226 | 11 |
| 2026-03-17 | FY2025 | Employees as of 31 December | 3.779 | 11 |
| 2026-03-17 | FY2025 | Market capitalization (year-end, Xetra) | 2.239 Mio. | 11 |
| 2026-03-17 | FY2025 | Price-earnings ratio | 44,64 | 11 |
| 2026-03-17 | FY2025 | 52-week low, Xetra | 46,53 | 11 |
| 2026-03-17 | FY2025 | Year-end closing price, Xetra | 116,50 | 11 |
| 2026-03-17 | FY2025 | 52-week high, Xetra | 194,00 | 11 |
| 2026-03-17 | FY2025 | Holding employees | 49 | 11 |
| 2026-03-17 | FY2025 | Total output | 1.248 Mio. | 11 |
| 2026-03-17 | FY2025 | Total order backlog | 3.194 | 11 |
| 2026-03-17 | FY2025 | Trade receivables prior year | 72.747 (EUR in TEUR) | 11 |
| 2026-03-17 | FY2025 | Trade receivables | 81.454 (EUR in TEUR) | 11 |
| 2026-03-17 | FY2025 | Equity ratio prior year | 30,5 % | 11 |
| 2026-03-17 | FY2025 | Equity ratio | 27,5 % | 11 |
| 2026-03-17 | FY2025 | EBIT | 73 Mio. | 11 |
| 2026-03-17 | FY2025 | Average age | 40,5 | 11 |
| 2026-03-17 | FY2025 | Average daily revenue | 8.344 | 11 |
| 2026-03-17 | FY2025 | Dividend yield (year-end, Xetra) | 0,52 % | 11 |
| 2026-03-17 | FY2025 | Dividend per share | 0,601 | 11 |
| 2026-03-17 | FY2025 | DIGITAL employees | 663 | 11 |
| 2026-03-17 | FY2025 | Total employees | 3.779 | 11 |
| 2026-03-17 | FY2025 | Employees Germany | 2.977 | 11 |
| 2026-03-17 | FY2025 | Employees abroad | 802 | 11 |
| 2026-03-17 | FY2025 | Adjusted EBITDA | 126 Mio. | 11 |
| 2026-03-17 | FY2025 | Guarantee obligations | TEUR 49.624 | 11 |
| 2026-03-17 | FY2025 | Order backlog SPACE SYSTEMS | 2.508 | 11 |
| 2026-03-17 | FY2025 | Order backlog DIGITAL | 324 | 11 |
| 2026-03-17 | FY2025 | Order backlog ACCESS TO SPACE | 362 | 11 |
| 2026-03-17 | FY2025 | Order backlog | 3.193.585 | 11 |
| 2026-03-17 | FY2025 | ACCESS TO SPACE employees | 651 | 11 |
| 2025-11-13 | 2025-Q3 | ROCE | 3 % | 10 |
| 2025-11-13 | 2025-Q3 | Order backlog | 3,117,057 (EUR in EUR 000) | 10 |
| 2025-11-13 | 2025-Q3 | Equity ratio | 28.2 % | 10 |
| 2025-11-13 | 2025-Q3 | EBIT margin | 5.3 % | 10 |
| 2025-08-07 | 2025-Q2 | R&D expenses | 13.3 million | 8 |
| 2025-08-07 | 2025-Q2 | Order backlog | EUR 3,067 million | 8 |
| 2025-08-07 | 2025-Q2 | Equity ratio | 27.3 % | 8 |
| 2025-08-07 | 2025-Q2 | Equity | 427,709 (EUR in EUR 000) | 8 |
| 2025-08-07 | 2025-Q2 | EBIT margin | 4.0 % | 8 |
| 2025-08-07 | 2025-Q2 | Adjusted EBITDA margin | 8.2 % | 8 |
| 2025-05-08 | 2025-Q1 | Return on Capital Employed (ROCE) | 8 % | 6 |
| 2025-05-08 | 2025-Q1 | Order backlog at March 31 | 2,314,191 (EUR in EUR 000) | 6 |
| 2025-05-08 | 2025-Q1 | Equity ratio | 30.7 % | 6 |
| 2025-05-08 | 2025-Q1 | Equity at March 31 | 432,659 (EUR in EUR 000) | 6 |
| 2025-04-29 | FY2024 | Personnel costs | 305,134 (EUR in EUR 000) | 4 |
| 2025-04-29 | FY2024 | Order backlog | 2,382,429 (EUR in EUR 000) | 4 |
| 2025-04-29 | FY2024 | Lease liabilities (non-current) | 26,272 | 4 |
| 2025-04-29 | FY2024 | Lease liabilities (current) | 10,084 | 4 |
| 2025-04-29 | FY2024 | Equity ratio | 30.5 % | 4 |
| 2025-04-29 | FY2024 | Contract liabilities | 332,326 | 4 |
| 2025-04-29 | FY2024 | Contract assets | 632,496 (EUR in EUR 000) | 4 |
| 2024-04-22 | FY2023 | Guarantee obligations | EUR 33,877 thousand | 2 |
| 2024-04-22 | FY2023 | Average headcount | 3,161 | 2 |
| 2024-04-22 | FY2023 | Subscribed capital | EUR 19,214,905.00 | 2 |
| 2024-04-22 | FY2023 | Price/earnings ratio (year-end, Xetra) | 10.32 | 2 |
| 2024-04-22 | FY2023 | Market capitalization (year end, Xetra) | 815 million | 2 |
| 2024-04-22 | FY2023 | Equity ratio | 32.7% | 2 |
| 2024-04-22 | FY2023 | Equity | 438,022 (EUR in EUR 000) | 2 |
| 2024-04-22 | FY2023 | Dividend yield (year-end, Xetra) | 1.90 % | 2 |
| 2024-04-22 | FY2023 | Contract assets | 554,106 (EUR in EUR 000) | 2 |
| 2024-04-22 | FY2023 | Average daily trading volumes (Xetra, Floor, Tradegate) | 11,645 | 2 |
Guidance Tracking (latest per metric/period · 13/17)#
All management forecasts (guidance) and their later outcome. Types: fiscal-year targets as well as quarterly/half-year targets; per metric and period the most recent statement applies, older versions can be expanded. The status is checked automatically against the actuals reported later: open (period still running), met, beaten, missed. For ranges (“X to Y”) reaching the range counts. Logged neutrally, no estimate of our own, no assessment.
Actuals: revenue in €m · ratios in %
| For period | Guided on | Metric | Guided | Actual | Verdict | Direction | Source |
|---|---|---|---|---|---|---|---|
| FY2026 | 2026-08-06 | Revenue | 1,400 | – | pending | confirmed | 15 |
| FY2026 | 2026-08-06 | EBITDA margin | 10.5–11% | – | pending | confirmed | 16 |
| FY2026 | 2026-08-06 | EBITDA (adjusted) | 0–11% | – | pending | confirmed | 15 |
| FY2026 | 2026-03-18 | Total operating performance | 1,400 | – | pending | confirmed | 16 |
| FY2026 | 2026-03-17 | EBIT margin | 8% | – | pending | confirmed | 12 |
| FY2026 | 2026-03-17 | Total output | 1.4 | – | pending | initiated | 11 |
| FY2025 | 2025-11-13 | Revenue (total output) | 1.2 | – | – | confirmed | 9 |
| FY2025 | 2025-08-07 | EBITDA (adjusted) | 9% | 125.6 | – | confirmed | 7 |
| FY2025 | 2025-08-07 | Operating income | 6% | – | – | confirmed | 7 |
| FY2025 | 2025-05-08 | Consolidated total output | 1.2 | – | – | initiated | 5 |
| FY2025 | 2025-04-29 | Revenue | 1,200 | 1,215.5 | beat | confirmed | 10 |
| FY2025 | 2025-04-29 | EBITDA margin | 9% | 9.4 | beat | confirmed | 9 |
| FY2025 | 2025-04-29 | EBIT margin | 6% | 6 | in line | confirmed | 9 |
| FY2024 | 2024-04-22 | Revenue | 1,300–1,400 | 1,001.5 | miss | confirmed | 2 |
| FY2024 | 2024-04-22 | EBITDA margin | 5–8% | 5.3 | in line | – | 1 |
| FY2024 | 2024-04-22 | EBIT margin | 0–6% | 1.4 | in line | – | 1 |
| FY2024 | 2024-04-22 | Total output | 1.3–1.4 | – | – | initiated | 1 |
Development#
A condensed summary per reporting period as running text: what changed operationally, which drivers management names, how earnings and cash flow developed. Most recent period first, grouped by year; each text is written from the original report of that period, superscript numbers lead to the source.
FY2026
OHB SE reported Q1 2026 revenue of 270.9 million, an 18.2% increase over the prior-year period 13, with EBIT of 15.2 million and net income of 9.9 million. In Q2 2026, revenue reached 329.2 million, bringing H1 2026 group revenue to EUR 600.1 million 15; Q2 EBIT was -0.3 million and net income -5.1 million. A capital increase completed in two tranches in Q2 raised gross proceeds of EUR 484 million 15, shifting the net position from net debt of 199.7 million at end-Q1 to net cash of 187.4 million at end-Q2. H1 2026 adjusted EBITDA rose to EUR 60.4 million from EUR 45.9 million in the prior-year period, representing a margin of 9.6% 16. The order backlog stood at EUR 3,353.6 million at 31 March 2026, higher than EUR 2,314.2 million a year earlier 13.
FY2025
OHB SE reported full-year 2025 revenue of 1,215.5 million EUR, up 21.4% from EUR 1,001.5 million in 2024 11. EBIT rose to 73.3 million EUR from EUR 14.1 million in the prior year, and net profit of 50 million EUR reversed a net loss of EUR 0.2 million in 2024 12. Diluted earnings per share reached 2.61 compared with EUR -0.01 in 2024 12. Key strategic milestones included the EUR 839 million LISA mission contract awarded to OHB System AG as prime contractor and the full acquisition of MT Aerospace AG through purchase of an additional 30% stake 12. Cash and cash equivalents closed the year at 220.6 million EUR, with the order backlog reaching EUR 3,194 million from EUR 2,382 million at end-2024 12.
FY2024
OHB SE reported full-year 2024 revenue of 1,001.5 million, down from EUR 1,047.8 million in 2023, while total performance declined 13% to EUR 1,030.2 million due to late order intake shifts and project milestone delays 3. EBIT reached 14.1 million versus EUR 125.0 million in 2023, burdened by a EUR 37.5 million satellite project disruption provision and EUR 15.4 million in transformation costs; adjusted EBITDA improved to EUR 111.1 million from EUR 87.1 million after excluding these special items 3 4. Net income attributable to OHB SE shareholders turned negative at EUR -196 thousand compared with EUR 71.3 million in 2023 4. Order intake rose to approximately EUR 1.7 billion, representing an over 80% year-on-year increase, lifting the order backlog to EUR 2,382 million from EUR 1,749 million; strategic highlights included the Ariane 6 maiden flight in July 2024, OHB's selection as prime contractor for the LEO-PNT in-orbit demonstration mission, and KKR completing a minority stake acquisition 3 4.
FY2023
OHB SE reported full-year 2023 revenue of 1,047.8 million, exceeding the company's guidance of EUR 1,176 million and higher than the prior-year level of EUR 944.5 million 2. EBIT rose by EUR 62 million to 125 million, surpassing guidance of EUR 70 million, while EBITDA rose by EUR 63 million to EUR 162 million against guidance of EUR 109 million 1. Consolidated net income reached 71.3 million, up from EUR 32.2 million in the prior year 2. Key operational milestones included the successful launch of the Heinrich-Hertz telecommunications satellite in July 2023 and the SARah reconnaissance satellite constellation in December 2023 1, alongside completion of a strategic partnership with KKR in December 2023 involving a 10% capital increase 2. Year-end cash stood at 141.1 million, partly reflecting a EUR 74 million inflow from the new share capital issue, while free cash flow was -66.1 million 2.
Glossary#
- Revenue: Revenue from contracts with customers, net of sales deductions, as the company itself reports it; not total output, gross revenue, GMV or order intake.
- Op. income: The operating line of the income statement; EBIT only as a marked fallback, never pre-tax or ordinary income.
- EBITDA (adj.): Adjusted EBITDA, verbatim and company-defined (non-GAAP), never derived.
- Net income: Net income attributable to the shareholders of the parent, after discontinued operations; not the result including minority interests, not comprehensive income.
- EPS: Diluted earnings per share attributable to the shareholders of the parent; a printed figure always beats a calculated one, calculated values are marked.
- FCF: Free cash flow = operating cash flow minus capital expenditure on property, plant and equipment; the company's own free cash flow figure is shown separately.
- OCF: Cash flow from operating activities as reported; IFRS companies may show interest paid in financing cash flow, so the figure is not always comparable.
- Cash: Cash and cash equivalents, without securities unless the company reports them as part of the position.
- Net Debt: Net debt = financial debt excluding lease liabilities minus cash at the same reporting date; the company's own net position may differ.
- *: derived, the formula is in the hover
- ≈: calculated, approximation
- ~: uncertain; the value stays visible, verdicts do not use it
- °: repaired by a targeted query against the document, or curated with documentary evidence
- EBIT: EBIT as a fallback: the income statement carries no operating line
- basic: basic earnings per share as a fallback when diluted is missing
Sources: official investor relations documents#
All original documents used, with type (e.g. quarterly, half-year, annual report), publication date and a direct link to the filing (EDINET/SEC/IR). Every superscript number in the report points to an entry in this list; so every figure can be traced back to its place in the original.
| # | Document type | Published | Link |
|---|---|---|---|
| #5 / #108 | IR-Quarter | – | Open |
| #6 / #109 | IR-Quarter | – | Open |
| #12 / #115 | IR-Annual | – | Open |
| #13 | IR-Quarter | – | Open |
| #14 / #117 | IR-Quarter | – | Open |
| #1 | IR-Annual | 2024-04-22 | Open |
| #2 / #105 | IR-Annual | 2024-04-22 | Open |
| #3 | IR-Annual | 2025-04-29 | Open |
| #4 / #107 | IR-Annual | 2025-04-29 | Open |
| #7 | IR-Quarter | 2025-08-07 | Open |
| #8 / #111 | IR-Quarter | 2025-08-07 | Open |
| #9 | IR-Quarter | 2025-11-13 | Open |
| #10 / #113 | IR-Quarter | 2025-11-13 | Open |
| #11 / #114 | IR-Annual | 2026-03-17 | Open |
| #15 | IR-Quarter | 2026-08-06 | Open |
| #16 / #119 | IR-Quarter | 2026-08-06 | Open |
FAQ#
Is there a management forecast (guidance) for FY2026?
Yes. Management has issued targets for FY2026, including Revenue. The guidance tracking chapter shows all targets and checks them against the actuals reported later; neutral, with no estimate of our own.
Does OHB SE pay a dividend?
The filings report on the dividend; most recent entry: dividend per share 0.601 (FY2025) (as reported, no assessment of our own). Details with source links are in the report chapters.
Where can I find the official investor relations documents of OHB SE?
The sources chapter links all 26 original filings used (IR documents) with type, publication date and a direct link; every figure in the report carries a source number.